Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 0 0 PIPRAICH GORAKHPUR GORAKHPUR UTTAR PRADESH 273152 | GORAKHPUR | UTTAR PRADESH | 273152 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹8.4 L
Closing Date
18 Nov 2021, 2:00 pmClosed
Secretary
UIT Alwar
Maintenance and cleaning of Moti Dungari Children Park, Rajeev Gandhi Park, Flag Park, Maharana Pratap Park and Newly made park infront of Rajeev Gandhi Park and Caring of Rabbits at Moti Dungari Children Park, Alwar. (2021-22)
2021_UITAL_246433_1
NIT14/2021-22/Item11
Open Tender
Civil Works
365 days
UIT Alwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Secretary, UIT
Exempted
26 Nov 2021
8 Nov 2021
18 Nov 2021
8 Nov 2021
18 Nov 2021
8 Nov 2021
Amount
Maintenance , Sweeping and Cleaning of all lawns/vacant areas/hedge/plants, trees of Moti Dungari Children Park, Rajeev Gandhi Park, Flag Park, Maharana Pratap Park and Newly made park infront of Rajeev Gandhi Park (Total 5 nos Parks) including their cutting, cleaning, stacking of all unusable material & transporting to manure preparation pit. Watering & Debedding of all the plants, lawn in above area is to be done by contractor. Cleaning of all the toilets/ urinals in area mentioned above is to be done regular with phenole & nepthline balls are to be provided to keep the facilities fresh & clean. If any plant dies during the period of maintenance then contractor has to be replace at his own cost. Complete work includes all necessary T&P. The complete work should be done as per direction & satisfication of Engineer Incharge. including Maintenance of Rabbits Cage and all vareities Rabbits including feeding of rabbits and their medical treatment complete. Work should include cleaning of rabbits cage per day and applying medicins required for rabbits. If any rabbit die during the maintenance period contractor have to supply the same on his own cost. Complete work should be done as per direction and entire satisfication of engineer incharge. Work includes repairing of submersible boring/ motor, pump at Stadium and motors at parks including starter complete work. Maintenance work of parks should be done with minimum labour requirement as per direction work includes sanitization of parks as per requirement or direction of Engineer Incharge. Complete work should be done as per direction & entire satifaction of Engineer Incharge.
H K CONSTRUCTION
SATIA ENTERPRISES
ARSAD CONTRACTOR
M/s Surender kumar meena
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid