Tender Value
₹33.0 L
EMD Value
₹66,000
Closing Date
16 Apr 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
SR DEN1
33 conditions · 9 needing a document upload
Please submit bank details of the firm / individual/ JV / partnership etc. i.e.Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, PAN Number and other necessary & relevant documents.
Please furnish list of Works on hand indicating Description of Work, Contract Value, Approximate value of balance work yet to be done and Date of award.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please furnish documents in support of your claim to fulfill the eligibility criteria as mentioned in the tender documents. Each page of the copy of documents / certificates in support of credentials, submitted by the you, shall be self-attested / digitally signed by the you or authorized representative of the your firm. Only those documents which are declared explicitly by you as "documents supporting the claim of qualifying the laid down eligibility criteria", will be considered for evaluating the offer or otherwise available in the offer.
Please furnish statement of deviations from tender conditions, if any.
Requisite documents proving technical eligibility criteria and financial eligibility criteria has been uploaded along with those required as per explanation given in clause 10 of IRGCC-2022 (Works Matter).
Tenderers who is/are not borne on the approved list of the contractors of North Central Railway shall submit along with his/their tender as per clause 11 of IRGCC-2022 (Works Matter), as applicable.
All requisite valid documents regarding constitution of business of the bidding firm should be submitted along with the tender as per clause 14 of IRGCC-2022 (Works Matter),otherwise their offer will be considered incomplete and shall not be considered.
The tenderer whether sole proprietor / a company or a partnership firm / joint venture (JV) / registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association /Board resolution, failing which tender shall be summarily rejected. A separate power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, shall be submitted after award of work, specifically authorizing him/them to deal with all other contractual activities subsequent to signing of agreement, if required. Note: A Power of Attorney executed and issued overseas, the document will also have to be legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed the Hague Legislation Convention 1961 are not required to be legalized by the Indian Embassy if it carries a conforming Appostille certificate. Reference: para 15 of IRGCC-2022 (Works matter),otherwise their offer will be considered incomplete and shall not be considered.
Joint Venture firms, if applicable in the instant tender, should submit all valid requisite documents and fulfil the stipulations as per clause 17 of IRGCC-2022 (Works Matter),otherwise their offer will be considered incomplete and shall not be considered.
Partnership firms, if bidding for the instant tender, should submit all valid requisite documents and fulfil the stipulations as per clause 18 of IRGCC-2022 (Works Matter),otherwise their offer will be considered incomplete and shall not be considered.
Rates are inclusive of all taxes/octroi, license fee, royalty charges etc. legally leviable by State, Central Govt. and/or any other local authority. If any Tax/Royalty/Octori is quoted extra, the same will neither be considered for evaluation of the tender nor will be paid. However any changes in rate of taxes or any new tax /cess on Works Contract will be dealt according to clause 37 of IRGCC-2022 (Works Matter).
Tenderers are advised to visit the site of work to ascertain all aspects of the site conditions viz accessibility, availability of approach road, nature of the soil, availability of material, availability of labour etc. that may be encountered in course of execution of work.
Tenderer should see the website for the corrigendum/addendum to the NIT/tender document, if any that may be uploaded prior to tender opening (inclusive) as there will not be any separate communication for that.
The tenderer for carrying any construction work in Uttar Pradesh must get themselves registered from the registering Officer under Section - 7 of the Building and Other Construction Workers Act, 1996 and rules made there-to by the Uttar Pradesh Govt. and submit certificate of Registration (Labour Department). For enactment of this Act, the tenderer shall be required to pay cess @ 1% of cost of construction work to be deducted from each bill.
The contractor(s) shall observe all the formalities, perform all the acts and abide by all the provisions contained in the Contract Labour Act-1970 and Contract Labour Central Rules, 1971 which in addition to other stipulations provides that the contractor(s) shall obtain license(s) from appropriate licensing officer of the area before commencement of the work and shall produce a copy thereof along with the original to the Railway office, which will be returned to the contractor after verification.
If any complaint is received against the contractor regarding violation of contract laws, (exposing Principal Employer to the risk of legal proceedings under labour laws), the guilty contractor will be black listed and their contract shall be terminated following the due procedure, apart from initiating criminal proceedings against him with the help of Labour department officials. (Authority: RB letter no.2008/E (LI)/AT/CNR/3, dated 24.01.2018).
It is the responsibility of the tenderer to see corrigendum, if any, to tender notice up to the date of tender opening. IRGCC-2022 (works matter) is for reference only. Any correction issued by competent authority up to date of opening will be applicable. Tenderer should quote accordingly.
The provision of Construction and Demolition Waste Management Rule 2016 issued by Ministry of Environment Forest and Climate Change dated 29.03.2016 and published in the Gazette of India, Part - II, Section -3, Sub-section (ii) are binding upon the Contractor. Contractor shall implement these provisions at worksites, for which no extra payment will be payable.
The tenderers shall submit a copy of certificate stating that all their statements/documents submitted along with bid are true and factual. Standard format of certificate to be submitted by the bidder is enclosed as Annexure-A. Non submission of above certificate by the bidder shall result in summarily rejection of his/their bid.
It is to be noted that tenderer digital signature on the E-Tender form will be considered as confirmation that tenderer have read and accepted all the conditions laid down in the documents as well as related specification of items,schedule & quantity of items in the tender, consisting of techno-commercial offer form (including special conditions attached to E-Tender) and Financial offer form, unless specific deviation is quoted in the techno- commercial offer form.
The quantities shown in the attached Schedule are given as a guide and are approximate only and are as a guide to give the tenderer(s) an idea of quantum of work involved. Quantities are subject to variation according to the needs of the Railway. The Railway does not guarantee work under each item of the Schedule. The Railway reserves the right to increase/ decrease and/or delete or include any of the quantities given above and no extra rate will be allowed on this account.
In case of any information submitted by tenderer is found to be false forged or incorrect at any time during process for evaluation of tenders, it shall lead to forfeiture of the tender Earnest Money Deposit besides banning of business for a period of upto two years. In case of any information submitted by tenderer is found to be false forged or incorrect after the award of contract, the contract shall be terminated. Earnest Money Deposit (EMD), Performance Guarantee and Security Deposit available with the railway shall be forfeited. In addition, other dues of the contractor, if any, under this contract shall be forfeited and agency shall be banned for doing business for a period of upto two years.
The tenderer has to submit necessary documents in compliance of clause 10 to 18 (Part-I) of IRGCC 2022 (Works matter) mandatorily, otherwise offer will be considered as Incomplete Offer and accordingly shall not be considered.
Though no minimum eligibility criteria is specified for tenders below Rs. 50.00 Lakhs, tenderers are advised to upload documents so that their financial capacity, capability & past performance to undertake the tendered work can be adjudged during evaluation of their offer. Documents testifying tenderer previous experience for the type of job for which tender is invited with list of works carried out in the past and financial status should be produced along with the tender.
Preparation of DPR of 2 Lane ROB in lieu of Level crossings in CAR-CPU Section under Sr.DEN/I/PRYJ ( 7 Nos ).
11920252026-263~NCR
11920252026-263
Open
Works - General
4 Months
Prayagraj, Uttar Pradesh
₹0
₹66,000
16 Apr 2026
19 Mar 2026
2 Apr 2026
11 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 32,99,271.15 | ||
| — | 7.00 | — | — | ||
| Conducting land survey at existing RailwayLevel Crossing locations using modern survey equipments like total stations or equivalent covering all details like Rail levels , existingRoad levels, Road width, boundary lines,existing building details, list of trees, anypermanent structures and all other data thatare required upon for the preparation ofcomplete General Arrangement Drawing ofROB/RUB in lieu of said LC locations coveringall details of existing roads,LC details andobstructions if any from one end to other endo f merging point with the existingroad,providing service roads on either side asper site requirements. (i)The above itemsinclude cost of all labour,material,equipments, office work for plotting, manpower, engineers etc. that essentially requiredfor a field survey.The payment of above itemsis for each LC location basis irrespective oftype, size, location of road or level crossing" "(ii)The survey should be exhaustive in naturepicking up all details of existing landavailability and structures there upon.Anyland to be newly acquired is to be clearlyearmarked in ground with its survey No. andvillages for the proposed ROB/RUB. With theavailable data and site conditions, it could beable to arrive at the most suitable type ofbridge i.e.whether a ROB or a RUB to be builtand guidance from Client can be availed(iii)The Survey should cover details of acorridor width of 60 metres at an interval of20 meters centre to centre with crosssections, of both existing Rail and Roadwaysand should invariably show the route ofTemporary diversion of Road Traffic duringactual construction. (iv)The Survey shouldcover details of alternate alignment also(Proposal-2) if the first and most fittingproposal option is not found technicallyfeasible /or due to site constraints. In suchcase survey data should be readily availablefor preparation of 2nd option of GAD" ( Unit -Each LC ) | — | — | — | 3,45,581.88 | |
| — | 28.00 | — | — | ||
| "Conducting subsoil exploration by drillingbore holes of NXsize (3''/75mm) or highersize using TC Bit / diamond bit suitable fordrilling all types of strata using modern dieseldriven/Electrically operated mechanical meansincluding refilling, reinstating the surface anddisposal of muck, conducting all soil tests thatis sufficient and necessary for determining thetype of soil, bearing capacity and othergeotechnical data required for design offoundations of ROB / RUB structures for suitable depth as per site conditions i.Theabove items includes all cost of machinery, itsinstallation, all labour, supervision,consumable items etc. for routine operation ofthe Rig required for bore hole exploration ii.Atall ROB/RUB site, four borehole has to bedone, one each for abutment and one foreither approaches. Any change in abovequantity will have to be approved by theEngineer in charge. The average depth ofeach bore hole is 20 metre and if any hardrock strata is met with, the boring can beterminated at 1.50 metre below hard rock.iii.20 metre depth of boring in an averageindication and the borehole base price isarrived for this depth in all type of strata.Ifhardrock is met within lesser depths, therewill not be any reduction in rates. Similarly,for where case of boreholes is required to gobeyond 20 metre and say up to 30 mtrs. atisolated cases ( Number limited to 20% oftotal bore holes" "iv.All relevant soil testinghas to be carried out such as MoistureContents / Dry Density, Atterberg Limit,Specific Gravity, Grain size analysis includingHydrometer analysis, Direct shear Test,Natural Density, Consolidation Test,Unconfined Compression Test.Tri-axial Testetc., in approved Labs and finally 'N' valuesfrom SPT tests that is necessary and sufficientfor classification of soil as well as to find outbearing capacity of soil at suitableintervals.Some tests like UCC, Triaxial test,consolidation Test etc. need to be carried outonly in limited numbers as per soil conditionsas directed by the Engineer-in-charge. v.Theagency has to submit in its report the bearingcapacity and its calculation at depths of 3m,4.5, 6.0 m and 7.50 metres in case of openfoundation and other relevant geotechnicaldata in case if pile foundation is proposed.Below 7.50 metres, the geo technical soilparameters is to be given at an interval of 3metres up to end point. vi.Relevant soilsamples and rock core samples may bepreserved in standard pack and it has to beproduced for examination as and whenrequired by Client vii. The details of bore logto be shown in full details in all GADs" | — | — | — | 18,58,797.36 | |
| — | 7.00 | — | — | ||
| "Preparation of Detailed General arrangementdrawing for the proposed ROB / RUB at LClocation based on the survey carried out atsite as well as discussion / initial approvalobtained from concerned authority like StatePWD and Railways incorporating all details oflength,width, gradient, type of road and classifications, bore log data, tentativefoundation details and its depth,type ofsuperstructure, traffic diversion plan etc. andall items as deemed necessary for itsimplementation in high quality tracing sheet(2sets) of size A1/ 840mm width and lengthsuitable to the scale 1:1000 and 6 copies ofAmmonia prints and 6 copies of white sheetprints of superior quality i.The above itemsinclude all cost of man power, material cost,tracing paper cost, office work liaison work,travelling charges. The payment of aboveitem is for each LC location basis. ii. Initially aconceptual sketch of ROB/RUB for the mostsuitable and acceptable conditions andnecessary approval from Southern Railways,Palakkad Division officials may be obtainedindicating to its alignment, gradient, mergingpoints, type of construction etc. The sketch in3 sets may be given in white sheet of sizeA1/840 mm width and length suitable toscale1:1000 ,to circulate among local bodies.iii.All GAD drawings are expected to getprepared in latest AutoCad version drawingswith suitable colour scheme (All copies inwhite sheets should be incolour scheme only.It should show invariably plan, longitudinalelevation, cross section at importantchainages, longitudinal cross section, key planfor road diversion etc." " iv.The Standard ofbridge shall match with the existing / futurerequirement of Road as per its classificationsas decided by competent authority ofHighways /Railways. The type of approachesfor the ROB/ RUB have to be considered asper site condition & economically suitable.Based up on this whether a pier/girdercombination or RET or any other structure isto be proposed. In some cases, provision of aLH Subway of RCC box for pedestrian, twowheeler and three wheeler crossing mayrequire as per site conditions. This has to beincorporated in drawings and estimate as perdirections of Engineer in charge. v. In Railwayspan, the type of structure and its span has tobe cleared by Railways standing instructionsas issued by Railway Board/ RDSO. Thisaspect has to be incorporated in GAD."(Unit -Each LC ). | — | — | — | 4,15,969.47 | |
| — | 7.00 | — | — | ||
| Preparation of detailed estimate for the above finalised ROB / RUB incorporating all items and specifications that of existing Railways /PWD norms and rates.The estimatehas to be prepared in standard form at basedon item rate assessment in 6 Nos.of sets i.Theabove item is inclusive of all charges of man power, office work and materials etc. Theestimate is to be prepared based on final andapproved GAD of ROB/RUB in A4 size qualitypaper with proper binding and decent cover.ii.The rates and specifications may be takenfrom respective Railway constructionorganisation i.e. in Southern Railway,PalakkadDivision with necessary rate escalation to thecurrent year. iii.Client will authorise theagency for obtaining the specifications andrate from Railways for estimate preparation."(Unit - Each LC ). | — | — | — | 3,66,297.96 | |
| — | 7.00 | — | — | ||
| Preparation and submission of the details of land survey,road details, existing road trafficdetails, soil investigation details,detailed estimate etc. in a project report format (DPR) printed in high quality A4 size paper anddecently spiral binded with cover in 6 sets.Out of the 6 sets, 3 sets have to be fully compiled as one booklet with attached folded copy of GADs etc.and balance 3 sets, thereport may be submitted in 2 booklet form-one for the survey, road details and soil investigation and the other booklet fordetailed estimate. All the above data has tobe submitted in soft copy also duly loaded inhighquality CD (3 Nos.) for each LC.(Unit -Each LC ) | — | — | — | 3,12,624.48 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
IRGCC2022ACS05.pdf
ATTACHMENT
IRGCC2022ACS04.pdf
ATTACHMENT
IRGCC2022ACS03.pdf
ATTACHMENT
IRGCC2022ACS02.pdf
ATTACHMENT
ACS1-GCC2022.pdf
ATTACHMENT
IRGCC2022ACS09.pdf
ATTACHMENT
IRGCC2022ACS10.pdf
ATTACHMENT
IRGCC2022ACS07.pdf
ATTACHMENT
IRGCC2022ACS08.pdf
ATTACHMENT
IRGCC2022Revised.pdf
ATTACHMENT
ACS6-GCC2022.pdf
ATTACHMENT
ACS11.pdf
ATTACHMENT
BankguaranteeformateforPG....pdf
ATTACHMENT
2025_06_24SeekingclarificationonapplicabilityofGCCCorrectionSlipNo_10.pdf
ATTACHMENT
TD-263.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .