Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.2 LAccepted-AOC 110059 NEW DELHI NATIONAL CAPITAL TERRITORY OF DELHI 110059 | WEST DELHI | DELHI | 110059 | L1 | Accepted-AOC Awarded being lowest bidder | |
| 2 | L2₹29.9 L+₹6.7 L (29.0%)Rejected-AOC | L2 | Rejected-AOC Other than lowest bidder | |
| 3 | L3₹30.8 L+₹7.6 L (32.6%)Rejected-AOC | L3 | Rejected-AOC Other than lowest bidder | |
| 4 | L4₹31.8 L+₹8.6 L (37.1%)Rejected-AOC | L4 | Rejected-AOC Other than lowest bidder | |
| 5 | L5₹31.9 L+₹8.7 L (37.5%)Rejected-AOC 205 PARSHAV VIHAR PLOT NO 50 IP EXTN PARPARGANJ DELHI 110092 | EAST | DELHI | 110092 | L5 | Rejected-AOC Other than lowest bidder |
Tender Value
₹49.9 L
EMD Value
₹99,860
Closing Date
3 Jun 2021, 6:00 pmClosed
GE (P) AF Gurgaon
GE (P) AF Gurgaon NEAR ATUL KATARIA CHOWK GURGAON 122005
GE (P) AF/GUR-24/2021-22 MANNING AND OPERATION OF WATER SUPPLY, ELECTRIC SUPPLY, SEWAGE TREATMENT PLANTS, DG SETS AND OTHER EM INSTALLATIONS AT AF STN GURGAON UNDER GE P AF GURGAON
2021_MES_441003_1
GE (P) AF/GUR-24/2021-22
Open Tender
Miscellaneous Works
Item Rate
304 days
GE (P) AF Gurgaon
AS SPECIFIED IN NIT
10 documents required · 10 mandatory
₹500
GE (P) AF Gurgaon
₹99,860
Yes
19 Jun 2021
6 May 2021
5 Jun 2021
6 May 2021
3 Jun 2021
20 May 2021
Amount
Manning and operation of DG Set (any capacity) and routine maintenance of minor nature with one operator (FGM) in Three shifts, each shift of (08) eight hours per day (including Sunday & Holiday) at the telephone exchange and AFNET, complete all as directed by Engineer in charge for the following shifts :-
1st shift from 0600 hrs to 1400 hrs
2nd shift from 1400 hrs to 2200 hrs
3rd shift from 2200 hrs to 0600 hrs
Manning and operation of DG Set (any capacity) and routine maintenance of minor nature with one operator (FGM) in Two shifts, each shift of (08) eight hours per day (including Sunday & Holiday) at Technical area complete all as directed by Engineer in charge for the following shifts :-
1st shift from 0600 hrs to 1400 hrs
2nd shift from 1400 hrs to 2200 hrs
Manning and operation of sewage Treatment plant of capacity 250 KLD at D camp near SNCO Mess and routine maintanance by deploying One experienced and qualified skilled operator including Sunday and holidays in three shifts, each shift of 08 hours per day complete all as specified and as directed and pumping, supply and distribution system as operation of pumps, DG set , chemical Dozers and electric panels etc, cleaning of pump house building internal and external area around the installation, complete all as specied and directed by Engineer in charge for the following shifts:-
1st shift from 0600 hrs to 1400 hrs
2nd shift from 1400 hrs to 2200 hrs
Manning and operation of sewage Treatment plant of capacity 85 KLD at G-Block and routine maintanance by deploying One experienced and qualified skilled operator including Sunday and holidays in three shifts, each shift of 08 hours per day complete all as specified and as directed and pumping, supply and distribution system as operation of pumps, DG set , chemical Dozers and electric panels etc, cleaning of pump house building internal and external area around the installation, complete all as specied and directed by Engineer in charge for the following shifts:-
1st shift from 0600 hrs to 1400 hrs
2nd shift from 1400 hrs to 2200 hrs
Manning and operation of Electrical installation 11 KV (Main receiving sub station) including routine mantenance by employing manpower One Electrician (skilled) at Tech area. The electricians shall attend all faults of entire Installation consisting of Transformers, VCB's/OCB's, Battery Banks, LT Panels having various type MCCBs/ACBs and UG Cables etc. The electrician shall be responsible for complete operation of the installation and shall ensure proper maintenance of all electrical equipments and accessories installed at the Sub Station and also responsible for repair/maint of any type of electrcical breakdown except replacement of spare parts complete all as specified and as directed by Engr-in- charge in the following shifts:-
1st shift from 0600 hrs to 1400 hrs
2nd shift from 1400 hrs to 2200 hrs
3 rd shift from 2200 hrs to 0600 hrs
Manning and operation of Electrical installation 11 KV (Domestic sub station) including routine mantenance by employing manpower One Electrician (skilled) at Adm area. The electricians shall attend all faults of entire Installation consisting of Transformers, VCB's/OCB's, Battery Banks, LT Panels having various type MCCBs/ACBs and UG Cables etc. The electrician shall be responsible for complete operation of the installation and shall ensure proper maintenance of all electrical equipments and accessories installed at the Sub Station and also responsible for repair/maint of any type of electrcical breakdown except replacement of spare parts complete all as specified and as directed by Engr-in- charge in the following shifts:-
1st shift from 0600 hrs to 1400 hrs
2nd shift from 1400 hrs to 2200 hrs
Attending internal electric complaints pertaning to Daily complaint Register by deploying one skilled electrician complete all as specified and directed by Engr-in-Charge.
General Notes for Item No 1.00 to item No 7.00:- (a) All T&P tools i.e. plier, screw driver, ring/DE spanner, test lamp with bulb, Allen Key, Tester, Adjustable wrench, Pipe wrench, Rubber Hand gloves, Safety belt etc shall be provide by the contractor. (b) 02 sets of uniform approved by GE and name plate shall be provided by the contractor indicating the name of individual and firm. (c) All stationary i.e. printed daily log sheet, attendance register etc shall be provided and maintained by the contractor. Log sheet shall be maintained per shift with proper handing/taking over of installation and no individual will leave the installation without arrival of reliever or as directed by Enge-in- Charge. (d) Log sheet and attendance register shall be put up to JE E/M/ AGE E/M for verification on daily basis. (e) Consumable Material required for day to day maintenance of installation shall be provided by department. (f) Tradesman shall be ITI/Diploma qualified with 3 years experience in trade shall be permitted and contractor must produce all qualification certificate/ experience certificates, photos and police verification, uniform mentioned as above before taking over site of all manpower deployed in this contract. (g) Daily cleaning of installation of inside/ outside area shall be carried out by the tradesman of installation and material like dasuti/yellow cloth, broom, axis pic, spade, grass cutter etc shall be provided by the contractor.
NOTE Contd/--- (h) In the event of absence of any tradesmen penalty shall be imposed at Rs 1000/- per shift in addition to non payment of that shift. (i) For any damaged /burnt our to switchgears due to negligence of operator such that loose connections, improper routine check up/maintenance etc; contractor shall held fully responsible to replace the same damaged/burnt out switchgear or any equipment on his own cost all as directed by Engineer-in-charge. (j) Contractor shall arrange mobile (without touch screen and camera) set with authenticated mobile number at each installation and deployed tradesman shall remain in contact with JE E/M and Engr-in-Charge at all the duty hours. (k) Contractor shall arrange proper insurance for the tradesman and department shall not be held responsible for paying any compensation in case of any fatal accident. Any dispute with tradesman under labour act shall be dealt with by the contractor with labour commissioner/ appropriate authority.
NOTE for Payment of Wages of Labour :- (i) The contractor shall not pay less than the fair wages or minimum wages fixed under minimum wages Act 1948 by Govt of India or State Govt which ever is more. All wages shall be paid by cheque or by crediting the wages in the bank into AADHAAR linked bank account of the employee. (ii) Contractor/firm shall submit the certificate with the undertaking on Rs 100/-Stamp paper alongwith RARs certifying that full payment of the employees have been credited in the account as per minimum fair wages. The details of wages of concerned workmen including Bonus, ESI, EPF, GST & Labour cess etc as applicable shall be provided by the contractor before claiming the RARs. These documents and wages details shall be verified by the Engr-in-charge from the labour persionally and Engr-in-charge shall render the certificate for the same alongwith RARs. (iii) If any shortcoming noticed in payment of wages to workers Deptt. shall have the right to deduct from the payment due to the Contractor, any sum required or estimated to be required for making good the loss suffered by a worker or workers by reason of non-fulfilment of the Conditions of the Contract for the benefit of the workers, non-payment of wages or of deductions made from his or their wages, which are not justified by the terms of the Contract or non-observance of the Regulations. The mater will be reported to local Labour commissioner office for further action as deemed at their end.
PARKASH ENTERPRISES
M/S Parshant Associates
SHAMMI ENTERPRISES
Saini Enterprises
Ridhi engineers and builders
M/s Adhikari construction co.
M/S Anand Enterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .