Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.0 LAccepted-AOC BLOCK NO 7 BEHIND MALTI APTS NEAR SHIV DAIRY WANOWARI PUNE 411040 | PUNE | MAHARASHTRA | 411040 | L1 | Accepted-AOC The lowest e-tenderer | |
| 2 | L2₹23.6 L+₹1.6 L (7.09%)Rejected-Finance | L2 | Rejected-Finance Not the lowest e-tenderer |
Tender Value
Refer Docs
EMD Value
₹40,500
Closing Date
21 Jan 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Commander Works Engineer (Army) Mumbai
Commander Works Engineer (Army) 24 Assaye Building, Colaba Mumbai-400 005
PROVISION OF ENERGY MONITORING SYSTEM AT MAIN RECEIVING STATION AT GE DEHU ROAD
2021_MES_410540_1
83975/DR/E8
Open Tender
Miscellaneous Works
Item Rate
1185 days
GE Dehu Road
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE Dehu Road
₹40,500
15 Feb 2021
7 Jan 2021
22 Jan 2021
7 Jan 2021
21 Jan 2021
9 Jan 2021
7 Jan 2021 - 14 Jan 2021
60 days
Amount
PHASE I ; ( Item No 1 to 10) Supply, installation, Testing, Commissioning of Multifunction Meters L&T MFM 5010 cls.1.0 with RS485 communication or Equivalent at required feeder as directed by Engineer in charge
S & F, testing & commsissioning RS 485 to Ethernet converter & wireless 1 /port RS485 Serial to Modbus TCP MQTT GPRS Communication Gateway Make : Moxa, Robustell, Advantech or any reputed make suitable for software Provision of signaling antena whenever & wherever required.
S & F GPRS/GSM sim card with 3 years internet recharge. Provider: Idea/Airtel/Vodaphone
S & F Router Switch for server communication.
S & F Patch Cord
Supply & fix Control panel weather proof outdoor type sdouble door with canopy, fabricated out of 2.00 mm thick CRCA sheet dimensions : 400L x 500H x 200D with epoxy power coating of RAL-7035 (Siemens Gray) shade with matt finish with seven tank pre treatment process. The panel shall be fabricated by CPRI approved manufacturere only. Panel shall have base frame made out of steel, The Panel shall be dust and vermin proof, conforming to degree of protection IP-54, Gaskets between all adjacent units and beneath all covers shall be provided to render shall be fully gasketed with neoprene rubber and shall be lockable. The panel shall be provided with Wire Harness and connecting accessories for control system. The overall size of the panel shall adequate to house all the accessories and shall consists of following :- (a) MCB 6A, 3Pole C curve - 1qty (b) Power terminals for MCB connection. (c) Control Wiring of panel with1 sqmm standed copper cable PVC unsheathed.
Supply and layiing of Shielded twisted pair data cable, copper with low impedance, 1.5mm capable to transmit the data of energy meter's serial port RS485 Make : Belden/Lapp
Supply & Fix 230Vac UPS supply backup (Model : UPS LEGEND 650, Capacity : 650VA/360W) Input Voltage Range 140 V ~ 300 V AC Frequency 50 Hz ± 10% Type Sealed Maintenance Free Charging Time 6 Hours recover to 90% capacity Battery Rating SMF 12V /7AH Output Voltage 230 V ± 10% Transfer Time Typical 4~8ms Waveform (Battery Mode) Modified Sine Wave Operating Temperature 0°C-40°C; Relative Humidity 0 to 90% Non-Condensing Noise Level < 40dB Make : Microtek With one year warranty
Supply & Fix Server PC with Minimum i5 Processor with 4GB RAM (8GB is better),500GB HDD,18.5" Monitor minimum USB port (min 2 No.)DVD ROM Keyboard and mouse,MS Office 2010,Windows 8/8.1/10, 32 or 64 bit,Anti-Virus Makes : Lenovo, Dell, HP, ASUS, Mac book
PHASE II : Annual Maintenanace Contract ( Phase II starts after completion of Phase I ) AMC charges for EMS system for 3 years AMC shall innclude System connectivity check Meters communication check Sim recharge Any customer issue Per quarterly visit of technician Note : Annual Maintenance Contract (AMC) ClauseThe following AMC clause will form part of the contract placed on successful Bidder - (a) The contractor would provide comprehensive AMC for a period of 3 years. The AMC services should cover the repair and maintenance of all the equipment and systems purchased under the present Contract. The Buyer Furnished Equipment which is not covered under the purview of the AMC should be separately listed by the contractor. The AMC services would be provided in two distinct ways: (i) Preventive Maintenance Service: The contractor will provide a minimum of four Preventive Maintenance Service visits during a year to the operating base to carry out functional check ups and minor adjustments/ tuning as may be required. The rate quoted shall be deemed to be included. (ii) Breakdown maintenance Service: In case of any breakdown of the equipment/system, on receiving a call from the Engineer in charge, the contractor is to provide maintenance service to make the equipment/system serviceable. (b) Response time: The response time of the contractor should not exceed 24 hours from the time the breakdown intimation is provided by the Engineer in charge. (c) Serviceability of 100% per year is to be ensured. This amounts to total maximum downtime of 5 days per year. Also unserviceability should not exceed 6 days at one time. Required spares to attain this serviceability may be stored at site by the contractor at his own cost. Total down time would be calculated at the end of the year. If downtime exceeds permitted downtime, Penalty @ rate of Rs.100/Day would be applicable for the delayed period. (d) Maximum repair turnaround time for equipment/system would be 6 days. However, the spares should be maintained in a serviceable condition to avoid complete breakdown of the equipment/system. (e) Technical Documentation: All necessary changes in the documentation (Technical and Operators manual) for changes carried out on hardware and software of the equipment will be provided. (f) During the AMC period, the contractor shall carry out all necessary servicing/repairs to the equipment/system under AMC at the current location of the equipment/system. Prior permission of the Engineer in charge would be required in case certain components/sub systems are to be shifted out of location. On such occasions, before taking over the goods or components, the contractor will give suitable bank guarantee to the Buyer to cover the estimated current value of item being taken. (g) The rate quoted by contractor shall deemed to be included the cost of material of work shown in above from Sr (a) to (f).
PHASE III : Annual Maintenanace Contract (Phase III Starts after Completion of Phase II) :- Descripion of Item is All as per Item No 11
PHASE IV : Annual Maintenanace Contract (Phase IV Starts after Completion of Phase III) :- Descripion of Item is All as per Item No 11
PHASE V : Annual Maintenanace Contract (Phase V Starts after Completion of Phase IV) :- Descripion of Item is All as per Item No 11 NOTES: 1. Work order will be issued seperately for each phase by GE. 2. Completion certificate will be issued seperately for each phase by GE. 3. Defect liability period shall be applicable to each phase. 4. Final Bills will be paid seperately for each phase.
S.M.Sales Corporation
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .