Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Parimala.S L1 |
|---|---|---|---|---|
| 1.00 | Labour charges for the removal of submersible pumpset in borewell/openwell for attending repair.including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days-For repairing of pumpset. 50% Rate from The TWAD SOR 25-26 UPTO 5HP | 1 | No | 6,850 ₹6,850 Lowest |
| 1.01 | Above 5 HP to 10.00 HP | 1 | No | 7,860 ₹7,860 Lowest |
| 1.02 | Above 10 HP to 20.00 HP | 2 | No | 8,700 ₹17,400 Lowest |
| 1.03 | Above 20 HP to 30.00 HP | 2 | No | 9,450 ₹18,900 Lowest |
| 2.00 | Labour charges for the Re-erection of submersible pumpset in borewell/openwell. including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days-For repaired pumpset. 50% Rate from The TWAD SOR 25-26 Upto 3HP | 1 | No | 5,040 ₹5,040 Lowest |
| 2.01 | Upto 3HP to 7.5HP | 1 | No | 6,490 ₹6,490 Lowest |
| 2.02 | Beyond 7.5 HP upto 20 HP | 2 | No | 7,600 ₹15,200 Lowest |
| 2.03 | Above 20 HP to 30.00 HP | 2 | No | 8,500 ₹17,000 Lowest |
| 3.00 | Attending and repairing of Rewinding the burnt out coil to the following HP borewell type submersible motor with suitable insulated submersible copper induction wire and count including cost of coil wire and 10 days trail run (The retrived burnt out coil should be taken back by contractor) (Q) For borewell type-25HP | 1 | No | 20,500 ₹20,500 Lowest |
| 3.01 | For borewell type-20HP | 1 | No | 19,500 ₹19,500 Lowest |
Tender Value
₹4.5 L
EMD Value
₹4,500
Closing Date
22 Jul 2026, 3:00 pmClosed
COMMISSIONER
NELLIKUPPAM MUNICIPALITY
Attending and Repairing of Rewinding Submersible Motor Different type of pumpsets at Ward 16 To 30 Nellikuppam municipality.
2026_MAWS_684101_4
1206/2026/E1
Open Tender
Maintenance Works
Works
180 days
WORK
NOTICE
1 document required · 1 mandatory
₹0
₹4,500
Yes
9 Oct 2026
6 Jul 2026
22 Jul 2026
6 Jul 2026
22 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for the removal of submersible pumpset in borewell/openwell for attending repair.including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days-For repairing of pumpset. 50% Rate from The TWAD SOR 25-26 UPTO 5HP | 1 | No | - | - |
| 1.01 | Above 5 HP to 10.00 HP | 1 | No | - | - |
| 1.02 | Above 10 HP to 20.00 HP | 2 | No | - | - |
| 1.03 | Above 20 HP to 30.00 HP | 2 | No | - | - |
| 2 | Labour charges for the Re-erection of submersible pumpset in borewell/openwell. including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days-For repaired pumpset. 50% Rate from The TWAD SOR 25-26 Upto 3HP | 1 | No | - | - |
| 2.01 | Upto 3HP to 7.5HP | 1 | No | - | - |
| 2.02 | Beyond 7.5 HP upto 20 HP | 2 | No | - | - |
| 2.03 | Above 20 HP to 30.00 HP | 2 | No | - | - |
| 3 | Attending and repairing of Rewinding the burnt out coil to the following HP borewell type submersible motor with suitable insulated submersible copper induction wire and count including cost of coil wire and 10 days trail run (The retrived burnt out coil should be taken back by contractor) (Q) For borewell type-25HP | 1 | No | - | - |
| 3.01 | For borewell type-20HP | 1 | No | - | - |
stage.html
html • 0.02 MB
finance_822363.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_822363.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .