Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.5 CrAccepted-AOC 20 SC BOSE COLONY GALI NO 02 DEFENCE LAB ROAD RATNADA JODHPUR 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | L-1 | Accepted-AOC Being lowest tenderer | |
| 2 | L-2₹2.7 Cr+₹14.2 L (5.56%)Rejected-Finance B XXIII 56 A PREM NAGAR SAINGARGH PATHANKOT 145001 PUNJAB | PATHANKOT | PATHANKOT | PUNJAB | 145001 | L-2 | Rejected-Finance being other than lowest tenderer | |
| 3 | L-3₹2.8 Cr+₹23.9 L (9.37%)Rejected-Finance 2 EVEREST VIHAR PT T N MISHRA MARG NIRMAN NAGAR JAIPUR 302019 | JAIPUR | RAJASTHAN | 302019 | L-3 | Rejected-Finance being other than lowest tenderer | |
| 4 | L-4₹3.0 Cr+₹44.7 L (17.5%)Rejected-Finance 04 L BLOCK MARKET SECTOR 11 NOIDA 201301 UP GAUTAM BUDHA NAGAR | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | L-4 | Rejected-Finance being other than lowest tenderer | |
| 5 | L-5₹3.2 Cr+₹60.8 L (23.9%)Rejected-Finance 5037 5038 URBAN ESTATE PH 1 PATIALA 147001 PUNJAB | PATIALA | PATIALA | PUNJAB | 147001 | L-5 | Rejected-Finance being other than lowest tenderer |
| Sl No | Description | Qty | Unit | RISING ELECTRICALS L7 | M K ENGINEERS CO. L1 | Rasam Engg Co. L3 | Leo Air and Power Solution pvt Ltd. L10 | SATISH AND CO L2 | GEPS PROJECTS L4 | Sant Construction Co. L5 | MAHESH KUMAR SINGLA CONTRACTOR L11 | BHARATSHAH CONSTRUCTION CO L8 | Pioneer Enterprises L6 | M/s godara infratech and power industries L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in all kind of soil complete all as specified and directed. | 4,686 | CUM | 200 ₹9,37,200 | 140 ₹6,56,040 | 120 ₹5,62,320 | 300 ₹14,05,800 | 100 ₹4,68,600 Lowest | 135 ₹6,32,610 | 300 ₹14,05,800 | 150 ₹7,02,900 | 250 ₹11,71,500 | 405 ₹18,97,830 | 175 ₹8,20,050 |
| 2.00 | Earth work excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in ordinary rock complete all as specified and directed. | 1,806 | CUM | 500 ₹9,03,000 | 243 ₹4,38,858 | 275 ₹4,96,650 | 450 ₹8,12,700 | 120 ₹2,16,720 Lowest | 135 ₹2,43,810 | 450 ₹8,12,700 | 240 ₹4,33,440 | 600 ₹10,83,600 | 805 ₹14,53,830 | 875 ₹15,80,250 |
| 3.00 | Earth work excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in Hard rock complete all as specified and directed.
Note for Item Ser No 1 to 3 :- Excavation will be started after procurement of cable and cable will be laid with protection accessories within 15 days excavation. | 300 | CUM | 1,500 ₹4,50,000 | 900 ₹2,70,000 | 600 ₹1,80,000 | 700 ₹2,10,000 | 200 ₹60,000 | 150 ₹45,000 Lowest | 700 ₹2,10,000 | 800 ₹2,40,000 | 1,500 ₹4,50,000 | 1,480 ₹4,44,000 | 2,075 ₹6,22,500 |
| 4.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift exceeding 1.5 m and upto 3.0 m deep, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in ordinary rock complete all as specified and directed. | 1.5 | CUM | 2,000 ₹3,000 | 450 ₹675 | 1,000 ₹1,500 | 1,000 ₹1,500 | 200 ₹300 | 135 ₹202.5 Lowest | 800 ₹1,200 | 300 ₹450 | 600 ₹900 | 2,000 ₹3,000 | 2,500 ₹3,750 |
| 5.00 | Returning, filling in, including, spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick in any type of soil complete all as specified and directed. | 3,672 | CUM | 60 ₹2,20,320 | 40 ₹1,46,880 | 60 ₹2,20,320 | 125 ₹4,59,000 | 40 ₹1,46,880 | 45 ₹1,65,240 | 100 ₹3,67,200 | 70 ₹2,57,040 | 100 ₹3,67,200 | 32 ₹1,17,504 Lowest | 50 ₹1,83,600 |
| 6.00 | Returning, filling in, including, spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick in rock complete all as specified and directed. | 1,742 | CUM | 65 ₹1,13,230 | 75 ₹1,30,650 | 60 ₹1,04,520 | 200 ₹3,48,400 | 40 ₹69,680 | 45 ₹78,390 | 100 ₹1,74,200 | 100 ₹1,74,200 | 100 ₹1,74,200 | 38 ₹66,196 Lowest | 50 ₹87,100 |
| 7.00 | M&L for sand cushioning to underground PVC/XLPE cable with tibba sand and punning down to provide required cover complete all as specified and directed.
(Note:- For the purpose of payment only punned thickness will be measured). | 1,292 | CUM | 800 ₹10,33,600 | 300 ₹3,87,600 | 180 ₹2,32,560 Lowest | 750 ₹9,69,000 | 200 ₹2,58,400 | 900 ₹11,62,800 | 800 ₹10,33,600 | 650 ₹8,39,800 | 400 ₹5,16,800 | 305 ₹3,94,060 | 300 ₹3,87,600 |
| 8.00 | Supply & laying 40 to 50 mm thick roughly hammer dressed Jodhpur stone patti, 25 cm to 30 cm wide and not exceeding 60 cm long each as in under ground cable cover, laid dry abutting with each other with maximum gap between adjacent slabs not exceeding 10 mm complete all as specified and directed. | 3,538 | SQM | 250 ₹8,84,500 | 280 ₹9,90,640 | 200 ₹7,07,600 | 450 ₹15,92,100 | 175 ₹6,19,150 Lowest | 570 ₹20,16,660 | 600 ₹21,22,800 | 680 ₹24,05,840 | 250 ₹8,84,500 | 410 ₹14,50,580 | 230 ₹8,13,740 |
| 9.00 | Labour only Jodhpur stone patti as in under ground cable cover, laid dry abutting with each other with maximum gap between adjacent slabs not exceeding 10 mm complete all as specified and directed. | 400 | SQM | 30 ₹12,000 | 65 ₹26,000 | 30 ₹12,000 | 80 ₹32,000 | 20 ₹8,000 Lowest | 60 ₹24,000 | 100 ₹40,000 | 200 ₹80,000 | 25 ₹10,000 | 95 ₹38,000 | 45 ₹18,000 |
| 10.00 | Supply, laying & testing cable XLPE insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) with stranded aluminium conductor, 11000 volts earth grade of cross sectional area 95 sqmm, 3 core complete all as specified and directed. | 3,900 | RM | 1,070 ₹41,73,000 | 765 ₹29,83,500 Lowest | 890 ₹34,71,000 | 957 ₹37,32,300 | 892 ₹34,78,800 | 906 ₹35,33,400 | 830 ₹32,37,000 | 1,010 ₹39,39,000 | 1,100 ₹42,90,000 | 852 ₹33,22,800 | 1,100 ₹42,90,000 |
Tender Value
₹4.6 Cr
EMD Value
₹5.3 L
Closing Date
1 Jan 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
HQ CE Jodhpur Zone
HQ CE Jodhpur Zone-342001
PROVN OF RING MAIN UNIT AND UG HT CABLE AGAINST OVER HEAD CONDUCTOR FROM MAIN RECEIVING STN TO SUB STN AT JAISALMER MIL STN
2024_MES_654753_2
800607/JSLR/E8
Open Tender
Civil Works
Item Rate
365 days
Jaislmer
All as Per NIT
8 documents required · 8 mandatory
₹2,000
Yes
GE (A) JAISALMER
₹5.3 L
Yes
28 Feb 2025
7 Dec 2024
8 Jan 2025
7 Dec 2024
1 Jan 2025
25 Dec 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in all kind of soil complete all as specified and directed. | 4,686 | CUM | - | - |
| 2 | Earth work excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in ordinary rock complete all as specified and directed. | 1,806 | CUM | - | - |
| 3 | Earth work excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in Hard rock complete all as specified and directed. | 300 | CUM | - | - |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift exceeding 1.5 m and upto 3.0 m deep, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in ordinary rock complete all as specified and directed. | 1.5 | CUM | - | - |
| 5 | Returning, filling in, including, spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick in any type of soil complete all as specified and directed. | 3,672 | CUM | - | - |
| 6 | Returning, filling in, including, spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick in rock complete all as specified and directed. | 1,742 | CUM | - | - |
| 7 | M&L for sand cushioning to underground PVC/XLPE cable with tibba sand and punning down to provide required cover complete all as specified and directed.
(Note:- For the purpose of payment only punned thickness will be measured). | 1,292 | CUM | - | - |
| 8 | Supply & laying 40 to 50 mm thick roughly hammer dressed Jodhpur stone patti, 25 cm to 30 cm wide and not exceeding 60 cm long each as in under ground cable cover, laid dry abutting with each other with maximum gap between adjacent slabs not exceeding 10 mm complete all as specified and directed. | 3,538 | SQM | - | - |
| 9 | Labour only Jodhpur stone patti as in under ground cable cover, laid dry abutting with each other with maximum gap between adjacent slabs not exceeding 10 mm complete all as specified and directed. | 400 | SQM | - | - |
| 10 | Supply, laying & testing cable XLPE insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) with stranded aluminium conductor, 11000 volts earth grade of cross sectional area 95 sqmm, 3 core complete all as specified and directed. | 3,900 | RM | - | - |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.37 MB
Tenderdocument.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .