Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
3 Aug 2026, 4:00 pm
Executive Engineer PWD R and B Division Kathua
Executive Engineer PWD R and B Division Kathua
Refer to BOQ
2026_PWDJK_316969_1
E-NIT No 59/2026-27/4251-55/G Dated 20.07.2026
Open Tender
Civil Works
Percentage
30 days
Kathua
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer PWD R and B Division Kathua
₹3,000
Executive Engineer PWD R and B Division Kathua
21 Jul 2026
21 Jul 2026
4 Aug 2026
21 Jul 2026
3 Aug 2026
21 Jul 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete in 1:3:6 or richer mix (i.e.equivalent design mix) manually/by mechanical means including disposal of material , all leads and lifts as per direction of Engineer-incharge: | 0.16 | Cum | 1,725.2 | ₹276.03 |
| 2 | Providing and laying in position cement concrete of specified grade incl.curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1.86 | Cum | 5,733.6 | ₹10,664.5 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete inclu. curing but excluding the cost of centering, shuttering, finishing & reinforcement. All works upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone agg. 20 mm nominal size) | 0.84 | Cum | 7,788.4 | ₹6,542.26 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level Thermo-Mechanically Treated bars of grade Fe-500D or more incl. all leads, lifts and carriage of material by M.T. / H.L. | 68 | Kg | 123.2 | ₹8,377.6 |
| 5Centring & shuttering incl.strutting propping etc and removal of form work for | |||||
| 5.01 | Foundations, footings, bases of columns etc. for mass concrete. | 16.35 | Sqm | 286.35 | ₹4,681.82 |
| 5.02 | Suspended floors, roofs, landings, balconies and access platfoMetres. | 3 | Sqm | 718.2 | ₹2,154.6 |
| 6 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 180 | Kg | 181.6 | ₹32,688 |
| 7 | Engaging Earth excavator 75 H.P. for removal of slips in all kinds of soils, clerarance of side drain and disposal of same outside the periphery of the area cleared by engaging of tractor trolly wherever required ( all inclusive incl. POL) as per the directions of the Engineer-in - Charge. | 35 | Hrs. | 1,000 | ₹35,000 |
| 8 | Engaging labour for Clearance of site, removal of mulba and choked drains from site before execution of work | 67 | No. | 553 | ₹37,051 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
BOQ_1036515.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].