Loading…
Loading…
Tender Value
₹415.7 Cr
EMD Value
₹8.3 Cr
Closing Date
18 Jun 2026, 3:00 pmClosed
Yes (up to 4 members)
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
No
Not Applicable
Lowest to Highest
180 days
Expenditure
Capital (Works)
GENERAL
14 conditions · 2 needing a document upload
The Bidder shall have a minimum Net Worth (the "Financial Capacity") of 5% of Estimated Project Cost at the close of the preceding Financial Year. (Refer clause No. 2.2.2.2 of RFP).
The Bidder shall have the Technical Capacity and Experience as mentioned in Clause No. 2.2.2.1, 2.2.2.3 to 2.2.2.9 of the RFP.
Defination of Similar Work :- Earthwork in Embankment and Blanketing in Railway Formation / Railway Minor Bridges/Railway Major Bridges/RUBs/ROBs/Track works in Railway
31 conditions · 14 needing a document upload
ANNEXURE I TO APPENDIX IA-(DETAILS OF BIDDER) The Bidder shall ensure that all the details are updated as on the due date of submission of this Bid.
APPENDIX IA (LETTER COMPRISING THE TECHNICAL BID) Clause 2.1.4, 2.11 and 3.1.6 of RFP.
APPENDIX IB (LETTER COMPRISING THE FINANCIAL BID) (Para 2.1.4, 2.11 and 3.1.6 of RFP)-The Bid shall be furnished in the format exactly as per Appendix-IA & IB i.e. Technical Bid as per Appendix IA and Financial Bid as per Appendix IB and it shall be signed by the Bidder's authorized signatory. The Bidder shall first upload all the project details as mentioned in Para No. 2.11.1 of RFP document.
APPENDIX-II (FORMAT FOR POWER OF ATTORNEY FOR SIGNING OF BID) Clause No. 2.1.5 of RFP.
ANNEXURE II TO APPENDIX IA(TECHNICAL CAPACITY OF THE BIDDER): Refer CLAUSE 2.2.2.1, 2.2.2.4 and 2.2.2.6 of RFP.
APPENDIX III- Format for power of attorney for lead member of Consortium/Joint venture CLAUSE 2.1.6 of RFP.
ANNEXURE III TO APPENDIX IA- (FINANCIAL CAPACITY OF THE BIDDER) (Refer clause 2.2.2.2, 2.2.2.8(i), 2.2.2.7(iii) of RFP) The Bidder must establish the minimum Net Worth specified in Clause 2.2.2.2 and provide details as per format at Annex-III of Appendix-IA.
APPENDIX IV (FORMAT FOR JOINT BIDDING AGREEMENT FOR (CONSORTIUM/ JOINT VENTURE) Clause 2.1.11 of RFP.
ANNEXURE IV TO APPENDIX IA (DETAILS OF ELIGIBLE PROJECTS) Refer Clause 2.2.2.1, 2.2.2.4 and 2.2.2.6 of RFP.
ANNEXURE V TO APPENDIX IA- (STATEMENT OF LEGAL CAPACITY).
ANNEXURE-VII (BID SECURITY)/EMD (REFER Para 1.2.4 of RFP)The Bidder shall furnish as part of its Bid, a Bid Security, referred to in Clause 1.2.4 here in above through [e-payment Gateway of Authority OR in form of Bank Guarantee from a Bank as per format at Annexure-VII].
ANNEXURE VI TO APPENDIX IA-(Guidelines of the Department of Disinvestment) The Bidder shall ensure that all the details are updated as on the due date of submission of this Bid.
Department of Expenditure, Ministry of Finance, Government of India letter F.No.6/18/2019-PPD dated:23/07/2020 shall be referred. The Bidder shall ensure that all the details are updated as on the due date of submission of this Bid along with Annexure-VII.
APPENDIX IC (Contractor's Work Plan) Clause 2.11.1 and 3.1.6.1 of RFP shall be submitted through online towards Contractor's Work Plan with full details of manpower, machinery, equipment, number of simultaneous sites listing all the activities from mobilization to completion along with S curves for all major activities like Earthwork, Concreting, Steel work etc.
APPENDIX ID (Supporting Documents) Clause 2.11.1.1 of RFP, shall be submitted the details through online i.e 1) Detailed break up of all the cost components forming part of PVC formula as per para of bidding document along with rate analysis of each component. 2) Expected billing based on milestones and physical progress, 3) S Curves of cash flow.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
STUDY OF DRAWINGS AND LOCAL CONDITIONS: The drawings for the works can be seen in the office of the Chief Administrative Officer, Construction, S.C.Railway, Secunderabad - 500071 or in the office of the concerned field Deputy Chief Engineer / Construction / S.C.Railway . It should be noted that these drawings are meant for general guidance only and Railway may suitably modify them during the execution of work according to the circumstances without making the Railways liable for any claims on account of such changes. If there is any variation between the description in the tender and the detailed plans, the Engineer-in-Charge will operate the correct description and his decision is final and binding on the tenderer/ Contractor. The Tenderer/Contractor is required to inspect the sites of works and acquaint himself with the site conditions, availability of approaches for transporting of men and materials, space and other factors relating to the works, availability of labour, electricity and water, etc., before quoting his rates. The extent of lead and lift involved in the execution of works and any difficulties involved in the execution of work should also be examined before formulating the rates for complete items of works described in the schedule. The Tender submitted will be deemed to have been made after such inspection.
CORRIGENDUM NOTICE ON IREPS: [I]Railway may modify the tender document by issuing online corrigendum through "www.ireps.gov.in" 15 days prior to the tender closing date. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer.
Applicable for the tenders with eligibility criteria: The offer of Tenderer(s) who do not enclose Work Experience Certificate & Financial eligibility Certificate with requisite details, and supporting documents along with their Tender to establish their credentials shall be summarily rejected, even though they are working contractors or contractors on approved list.
The offer shall be evaluated only from the certificates/documents submitted along with the tender offer.
Any Certificate /Documents offered / submitted / received after the tender opening shall not be given any credit and shall not be considered.
Railway reserves the right to verify the authenticity of the documents/information furnished.
Tenderer(s) shall note that conditional/alternate offer will not be considered and will summarily be rejected, even though such condition makes them as the lowest tenderer.
South Central Railway (Construction Organization)- Guntur Division - Engineering, Procurement and Construction (EPC) contract for Construction of New BG line between Errupalem (Excl.) and Kothapalli Halt (Excl.) stations from Km 3.525 to Km 24.800 (21.275 km) in connection with New BG line between Errupalem - Namburu Via Amaravati in Guntur Division of South Central Railway in the State of Andhra Pradesh
EPC-08-CAO-C-SC-2026
EPC-08-CAO-C-SC-2026
Open
Works - General
30 Months
Unknown (Unspecified Location)
₹0
₹8.3 Cr
17 Apr 2026
17 Apr 2026
4 Jun 2026
2 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 8 | ||
| Central Railway Construction (EPC) Halt (Excl.) stations between Errupalem - of Andhra Pradesh | :- South and Kothapalli line State | (Construction contract from Namburu | Engineering, Errupalem connection South Central |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
2.PeddapuramESPYP-NBR_V6_APPROVE_P57.pdf
ATTACHMENT
3.ChennaraopalemhaltESPYP-NBR_V4_APPROVE_P52.pdf
ATTACHMENT
4.GottumukkalaHaltESPYP-NBR_V3_APPROVE_P53.pdf
ATTACHMENT
5.ParitalaESPYP-NBR_V7_APPROVE_P77.pdf
ATTACHMENT
WorkingPlanandSectionKm0toKm26.pdf
ATTACHMENT
CrossingStationRBGBuilding-Sample.pdf
ATTACHMENT
RDSO-B-10402Series1.pdf
ATTACHMENT
RA-10526-10535.pdf
ATTACHMENT
SITEOFFICEPLANSample.pdf
ATTACHMENT
EPCYP-NBRNLFromKm3_525toKm24_800.pdf
ATTACHMENT
RFPYP-NBRNLFromKm3_525toKm24_800.pdf
ATTACHMENT
Guidelines_TypeofFoundation_BS-127R1.pdf
ATTACHMENT
18.30mwith5150deckwidthB-10273158-2020_1.pdf
ATTACHMENT
7.0mCOPRDSODrawings10531to10534.pdf
ATTACHMENT
LowlevelShelteroverPassengersbenchesonPlatformofWayside-RDSO-B-1758.pdf
ATTACHMENT
Policycircular22.12.2021.pdf
ATTACHMENT
ProvisionofTransitionSystem-RDSOlr.mo.GEGEN112-TranitionVol-IIIDt19-05-20251.pdf
ATTACHMENT
9.15mPSCSlabPostTen_10272R.PDF
ATTACHMENT
12.20mPSCSlab_10271R_10271-1R_compressed.pdf
ATTACHMENT
18.30mPSCGirder_10273SERIES_compressed.pdf
ATTACHMENT
26.02.2026_RevisedApprovedlistofBrandsandMakes2026withallenclosures.pdf
ATTACHMENT
ATWeld_Manual-2022.pdf
ATTACHMENT
BRfor9.1512.20mPSCslab.pdf
ATTACHMENT
Concretebridgecode.pdf
ATTACHMENT
IRSOD_INCORPORATED_New.pdf
ATTACHMENT
INSPPLATFORMBEARING_CBS0016.pdf
ATTACHMENT
HighLevelPFwalldrg70-2022.pdf
ATTACHMENT
HighLevelPFVDCFlooring71_2022.pdf
ATTACHMENT
HALTSTATIONBUILDINGGAD.pdf
ATTACHMENT
HshapeFPforallPSCslabs148-2020.pdf
ATTACHMENT
Guidelines_TypeofFoundation_BS-127R1_1.pdf
ATTACHMENT
GuidelinesonRSIAnalysis_BS-114.pdf
ATTACHMENT
FoundationSubstructureCode.pdf
ATTACHMENT
FlashbuttweldingManual-Reprint2022-IncorporateduptoCS4.pdf
ATTACHMENT
Divyangjanfacilitiesprovision_11_2023.pdf
ATTACHMENT
MJB_Ch-25039.311X18.30mPSCGB_Canal.pdf
ATTACHMENT
MJB_Ch-29241.831x12.20mPSCSlab.pdf
ATTACHMENT
MJB.No_Ch-29712.021X18.30mPSCGB.pdf
ATTACHMENT
PileWellfoundation_ManualUpdatedason20.5.16.pdf
ATTACHMENT
Platformcompundwall.pdf
ATTACHMENT
QAQCLABDrawing.pdf
ATTACHMENT
RCCBOX_25t_SingleLine_10152-Rseries_compressed_1.pdf
ATTACHMENT
SpecificationsforTrackBallastuptoACS-1.pdf
ATTACHMENT
TWSwitch_SEJRDSO_T_8822_ALT_4.pdf
ATTACHMENT
TypicalPlanforTrolleyRefugeForBankingandCutting.pdf
ATTACHMENT
BrandsandMakes2026.pdf
ATTACHMENT
ProcessinspectionofPSCSleeperstrackfittings.pdf
ATTACHMENT
InspectionchecklistforSteelBridgeGirderBearings.pdf
ATTACHMENT
ACS-06toIRSOD22dated23-03-2026.pdf
ATTACHMENT
errupalem-kothapalli_3.525kmto24.80_corrigendumtoRFP.pdf
CORRIGENDUM
EPC-08-2026CorrigendumtoRFPandEPCdocuments-Corr-R1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .