| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹19.4 L+₹38,082.26 (2.00%)Rejected-Finance VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | L2 | Rejected-Finance L2 | |
| 3 | L3₹19.6 L+₹57,123.39 (3.00%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹19.0 L
EMD Value
₹23,900
Closing Date
3 Nov 2023, 11:00 amClosed
GENERAL MANAGER, JHANJRA AREA
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Transportation, installation, necessary fabrication commissioning Trail Run including extension of one no 1000mm width 2x150KW Belt Conveyor along 48L from OXD to 8D in panel T4 at RVII seam, 3n4 Incline JPC
2023_ECL_291651_1
ECL/GM/JNR/EnM/A2/23-24/45 dated 17.10.2023
Open Tender
Miscellaneous Works
Item Rate
90 days
JHANJRA UNDERGROUND
Please refer Tender documents.
4 documents required · 4 mandatory
₹23,900
4 Jun 2024
18 Oct 2023
4 Nov 2023
18 Oct 2023
3 Nov 2023
19 Oct 2023
18 Oct 2023 - 26 Oct 2023
Amount
Part A
Dismantling of the 1000mm width, 2X150kW, 6.6kV, double Drive Head unit Complete with 1 Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, baseplate, fencing etc. of 1XD tandem belt conveyor from 301/1XD (R-VIIA).
Dismantling of the complete discharge unit with strike plate & chute plate of 1000mm width 1XD tandem belt conveyor from 29L/1XD (R-VIIA).
Dismantling of the complete loop take up unit of 1000mm width 1XD tandem belt conveyor from (30L-31)L/1XD (R-VIIA).
Dismantling of the complete tail end unit with fencing of 1000mm width 1XD tandem belt conveyor from 35L/1XD (R-VIIA).
Dismantling of 171 mtr. 1000mm width 1XD tandem belt conveyor structure complete with stringer, foot stool, top Bracket, top roller, bottom roller, decking plate, scrapper etc from 29L/1XD to 35L/1XD in R-VIIA seam.
Unlapping & pulling out of 370mtr. 1000mm width PVC belting of 1XD tandem belt conveyor from 29L/1XD to 35L/1XD in R-VIIA seam.
Dismantling of pull cords with cable, communication devices with cable, signalling wire for a length of 171mtr.belt conveyor of 1XD tandem belt from 29L/1XD to 35L/1XD in R-VIIA
Part B
Loading of 1000mm width, 2X150kW, 6.6kV Drive Head complete including base frame, drive drum, driven drum, gear, motor, equilising gear, girders etc on MUV at 30L/1XD(R-VIIA) manually.
Loading of Discharge Unit complete including discharge drum, girders, strike plate, chute plates etc on MUV at 29L/1XD(R-VIIA) manually,
Loading of Loop take up Unit complete including loop drum, fixed drum, loop take up trolley, winch, loop take up structure etc on MUV at 30L/1XD(R-VIIA) manually.
Loading of Tail end Unit complete including tail end drum, base frame etc on MUV at 35L/1XD(R-VIIA) manually.
Loading of 171mtr 1000mm belt structure complete including bracket, foot stools, channel, rollers etc on MUV at IXD tandem belt dismantling site manually.
Loading of 370mtr 1000mm PVC belting on MUV at IXD tandem belt dismantling site manually
Loading of 6.6kV starter, 6.6kV VCB, Winch starter, LS unit on MUV at 30L/1XD(R-VILA) manually
Loading of pull cords with cable, communication devices with cable, signalling wire for a length of 171mtr. on MUV at 1XD tandem belt dismantling site manually
Loading of 700mtr. 6.6kV 70sqmm cable on MUV at 3&4 incline surface with help of crane.
Loading of 750mtr. Sequence cable, 130mtr. Pull cord cable, 130mtr. Communication cable & signalling system for 130mtr on MUV at 3&4 incline surface manually.
Loading of 126mtr 1000mm belt structure complete including bracket, foot stools, channel, rollers etc on MUV at 3&4 incline surface manually.
Loading of 260mtr 1000mm PVC belting on MUV at 3&4 incline surface manually.
Unloading of 1000mm width, 2X150kW, 6.6kV Drive Head complete including base frame, drive drum, driven drum, gear, motor, equilising gear, girders etc from MUV at 52BL/-1XD(R-VA) and approx. 30mtr, manual transport to 52AL belt installation site..
Unloading of Discharge Unit complete including discharge drum, girders, strike 14 plate, chute plates etc from MUV at 528L/0XD(R-VIIA) and approx. 30mtr. manual transport to 52AL belt installation site.
Unloading of Loop take up Unit complete including loop drum, fixed drum, loop take up trolley, winch, loop take up structure etc from MUV at 52BL-1XD(R- VILA) and approx. 30mtr. manual transport to 52AL belt installation site.
Unloading of Tail end Unit complete including tail end drum, base frame etc from MUV at 52BL/2D(R-VIIA) and approx. 30mtr, manual transport to 52AL belt installation site.
Unloading of 171mtr 1000mm belt structure complete including bracket, foot stools, channel, rollers etc from MUV at T4 panel and approx. 30mtr, manual transport to 52AL to belt installation site.
Unloading of 370mtr 1000mm PVC belting from MUV at T4 panel and approx. 30mtr. manual transport to 52AL belt installation site.
Unloading of 6.6kV starter, 6.6kV VCB, Winch starter, LS unit from MUV at 52BL/-1XD(R-VIIA) and approx. 30mtr. manual transport & placing them at 52AL/-1XD(R-VIIA).
Unloading of pull cords with cable, communication devices with cable, signalling wire for a length of 171mtr, from MUV at T4 panel and approx. 30mtr, manual transport to 52AL belt installation site.
Unloading of 700mtr. 6.6kV 70sqmm cable from MUV at 32L/2XD sub-station, T3 panel, (R-VIIA)
Unloading of 750mtr. Sequence cable, 130mtr. Pull cord cable, 130mtr. Communication cable & signalling system for 130mtr from MUV at T4 panel and approx. 30mtr, manual transport to 52AL belt installation site.
Unloading of 126mtr 1000mm belt structure complete including bracket, foot stools, channel,rollers etc from MUV at T4 panel and approx. 30mtr. manual transport to 52AL belt installation
Part c
Installation of 1000mm width, 2X150kW, 6.6kV Drive Head complete at 52AL/-1XD in R- VIIA seam.
Installation of Discharge Unit complete at 52AL/0XD(R-VIIA)
Installation of Loop take up Unit complete at 52AL/((-1XD)-ID](R-VIIA)
Installation of Tail End Unit complete at 52AL/2D(R-VIIA)
Installation of 90mtr. 1000mm belt conveyor structure complete from 52AL/OXD to 52AL/2D(R-VIIA)
Laying-lapping-jointing-tensioning of 210mtr. 1000mm wide PVC belting from 52AL/0XD to 52AL/2D(R-VIIA).
Laying-hanging 700mtr 70sqmm 6.6kV grade cable from 32L/2XD-3XD) VCB to 52AL/-1XD VCB manually.
Laying-hanging-placing-fitting of 750mtr. sequence cable from 30L/0XD starter to 52AL/-1XD starter in (R-VIIA)
Laying-hanging-placing-fitting of pull cords with its 90mtr. cable, belt communication devices with its 90mtr. cable, 90mtr. signalling system (8-SWG) Gl wire, bobbin insulators & 3/8" X 3" MS Bolt-nut) from 52AL/0XD to 52AL/2D in R-VIIA seam.
Testing, trial run, rectification of alignment, tuning of this proposed 52AL belt conveyor from 52AL/0XD to 52AL/2D in R-VIIA seam.
Supply of DA Cylinder
Supply of oxygen cylinder
Supply of 5 tonne turn buckle
Part D
Six times dismantling of tail end unit complete for six times belt extension of proposed 52AL belt.
Six times transportation and installation of tail end unit complete for six times belt extension of proposed 52AL belt from 52AL/2D (R-VIIA) to 52AL/8D (R-VIIA).
Installation of 207mtr. 1000mm belt conveyor structure complete from 52AL/2D to 52AL/8D during six times belt extension.Each time extension will be for 34.5mtr.
Laying, Lapping. Jointing & Tensioning of 414mtr. 1000mm belting from 52AL/2D to 52AL/8D in R-VIIA seam during six times belt extension and trial run Each time extension will be for 34.5mtr.
Laying-hanging-placing-fitting of pull cords with its 207mtr. cable, belt communication devices with its 207mtr. cable, 207mtr. signalling system (8-SWG GI wire, bobbin insulators & 3/8" X 3" MS Bolt-nut) from 53AL/2D to 53AL/8D in R-VIIA seam during six times belt extension and trial run.Each time belt extension will be for 34.5mtr
PartE
Civil foundation works for installation of 2X150kW, 6.6kV, 1000mm wide belt conveyer drive head, discharge unit, loop take-up unit and platform for VCB,Starter for proposed 52AL belt conveyor of 3&4 Incline, JPC. (with GST)
PartF
Roof heightening by drilling blasting in stone, cleaning, roof bolting including cost of drill rod, drill bit for installation of proposed 52AL belt conveyor in R- VIIA seam of 3&4 incline under JPC. (with GST)
Total impact of GST for the purpose of CTC
F.R. ENTERPRISE
N.K. ENTERPRISE
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .