Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC IST FLOOR TARUN ENCLAVE OPP KRISHNA MEDICITY BATALA ROAD AMRITSAR | ₹1.1 Cr | L1 | Accepted-AOC aoc |
| 2 | L2₹1.2 Cr+₹12.5 L (11.8%)Rejected-Finance 273 KRISHNA NAGAR AMRITSAR | AMRITSAR | PUNJAB | 143001 | ₹1.2 Cr+₹12.5 L (11.8%) | L2 | Rejected-Finance AS THE RATES QUOTED BY BIDDER ARE THE SECOUND LOWEST |
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
30 Apr 2026, 12:00 pmClosed
XEN JANDIALA UBDC ASR
XEN JANDIALA UBDC ASR
Estimate for Brick lining of Water Course of outlet RD 26900-L of Usma Minor
2026_WR_159623_2
9
Open Tender
Civil Works - Canal
Item Wise
90 days
XEN JANDIALA UBDC ASR
AS PER NIT CONDITION
3 documents required · 3 mandatory
₹1,000
₹2.0 L
Yes
11 May 2026
21 Apr 2026
30 Apr 2026
21 Apr 2026
30 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (6.2) Earth work excavation in ordinary soil, exclusive of compensation of earth:- ((a)) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods. | 335.1 | Cum | - | - |
| 2 | Earth work excavation in ordinary soil, exclusive of compensation of earth:- ((b)) Earth work undressed with a combined lead upto 15 metres including breaking of clods. | 4,703.65 | Cum | - | - |
| 3 | Dressing of earth work ((i)) New work or remodeling work. | 9,203.37 | Sq.Mtr | - | - |
| 4 | (6.8) Earth filling:- (b (i)) Earth work (exclusive of compensation for earth) in excavation in ordinary soil or soil containing gravel or kankar upto 40% and filling in 15 cm layers in foundation and plinth including ramming watering and consolidating under floors with earth brought from a distance not exceeding 30 metres | 980.06 | Cum | - | - |
| 5 | Dag belling single kassi stroke minimum 7.5 cm depth | 6.1 | km | - | - |
| 6 | (11.3 (i)) First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | 906.22 | Cum | - | - |
| 7 | (15.6) 10mm thick Cement Plaster 1:4 | 3,965.33 | Sq.Mtr | - | - |
| 8 | (15.38) 10mm thick cement plaster 1:4 on floors. | 312.99 | Sq.Mtr | - | - |
| 9 | (19.1) Dressing bed and preparation of sub grade for lining. | 5,329.26 | Sq.Mtr | - | - |
| 10 | (19.12) Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes | 5,329.27 | Sq.Mtr | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Tendernotice_2.pdf
PDF • 1.58 MB
BOQ9.xls
Additional Documents • 0.24 MB
co02.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .