Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.9 LAccepted-AOC | ₹80.9 L | L1 | Accepted-AOC Most Responsive Bidder |
| 2 | L2₹87.3 L+₹6.4 L (7.93%)Rejected-Finance | ₹87.3 L+₹6.4 L (7.93%) | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹91.9 L+₹11.0 L (13.6%)Rejected-Finance UDOY BHABAN DEUDUAR PO DEUDUAR PS CHANGSARI KAMRUP DISTRICT PIN 781101 | KAMRUP | KAMRUP | ASSAM | 781101 | ₹91.9 L+₹11.0 L (13.6%) | L3 | Rejected-Finance L3 Bidder |
| 4 | L4₹93.5 L+₹12.6 L (15.6%)Rejected-Finance RATANPUR WARD NO 5 HOUSE NO 0 DHEMAJI DIBRUGARH ASSAM 787057 | DHEMAJI | ASSAM | 787057 | ₹93.5 L+₹12.6 L (15.6%) | L4 | Rejected-Finance L4 Bidder |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically not qualified |
Tender Value
₹92.0 L
EMD Value
₹1.8 L
Closing Date
7 Jan 2025, 12:30 pmClosed
Director of Fisheries Guwahati Assam
Meen Bhawan Assam Guwahati
17 nos of Fish Farms Projects in 11 districts of Assam under RIDF XXIX Development of Bokajan Fish Seed Farm Karbi Anglong District
2024_FD_41231_1
AF(S)184/RIDF/2023-24/6002-04. Dt.13.12.2024
Open Tender
Civil Works
Works
300 days
Karbi Anglong
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
₹1.8 L
Yes
9 Jun 2025
17 Dec 2024
8 Jan 2025
17 Dec 2024
7 Jan 2025
17 Dec 2024
Amount
Construction of new Pond
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes,in accordance with requirements of lines, grades and cross sections,loading and disposal of cut road with in all lifts and leads upto 1000 metres)
Repairing of existing rearing pond with embankment protection
Bailing out accumulated water from the tanks /ponds/ beels/ swampy and marshy areas with the help of power pump machines to expose the beds to sunshine till suitable for excavation in the form of earth as per direction and requirement of the deptt etc. complete including cost of transportation for power pump machine.
Excavation in Marshy Soil(Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket capacity including cutting and loading in tippers and disposal with in all lifts and leads upto 1000 metres, trimming of bottom and side slopes in accordance with requirements of lines,grades and cross sections). ( The excavated earth may be used in filling low lying margnal area and in construction of peripherial demarcation and for embedding hume pipe etc. if required). The excavated earth is utilized in renovation of embankment AB,BC,HI,CF & DE.
Supplying, filling and laying in loose with Geo-textile bags of Type-A (1.30m x 0.70m) made of Geo textile non woven fabric sheets of 400 GSM manufactured from polyster/ polypropylene conforming to relevant ISO standard filled with specified sand/ silt from flood plain or adjacent char within a distance of 90 m of the work site including excavation, filling Geo bags with sand weighing 126.00 kg after filling, stitching the mouth of the filled bags with polypropylene or polyster complete as per technical specifications and as directed.
Supplying of appropriate loose earth from private land beyond 90 m distance for filling in Geo-textile bags as mentioned in item no. 2 above complete as per technical specifications and as directed. (Annexure-1)
Repairing of existing stocking pond with embankment protection
Bailing out accumulated water from the tanks /ponds/ beels/ swampy and marshy areas with the help of power pump machines to expose the beds to sunshine till suitable for excavation in the form of earth as per direction and requirement of the deptt etc. complete including cost of transportation for power pump machine.
Excavation in Marshy Soil(Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket capacity including cutting and loading in tippers and disposal with in all lifts and leads upto 1000 metres, trimming of bottom and side slopes in accordance with requirements of lines,grades and cross sections). ( The excavated earth may be used in filling low lying margnal area and in construction of peripherial demarcation and for embedding hume pipe etc. if required). The excavated earth is utilized in renovation of embankment AB,BC,HI,CF & DE.
Supplying, filling and laying in loose with Geo-textile bags of Type-A (1.30m x 0.70m) made of Geo textile non woven fabric sheets of 400 GSM manufactured from polyster/ polypropylene conforming to relevant ISO standard filled with specified sand/ silt from flood plain or adjacent char within a distance of 90 m of the work site including excavation, filling Geo bags with sand weighing 126.00 kg after filling, stitching the mouth of the filled bags with polypropylene or polyster complete as per technical specifications and as directed.
Supplying of appropriate loose earth from private land beyond 90 m distance for filling in Geo-textile bags as mentioned in item no. 2 above complete as per technical specifications and as directed. (Annexure-1)
repairing and rennovation of fish seed Hatchery
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 15.2.1 Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks.
62 mm thick cement concrete flooring with concrete hardener topping, under layer 50 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) and top layer 12mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate, 6mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacture’s specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete.
18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster 1:3 (1 cement : 3 coarse sand) finished rough with sponge.
Extra for providing and mixing water proofing material in cement per bag of plaster work in proportion recommended by the manufacturers. 50kg cement used in the mix
(Rate Analysis)/Providing drain with cement concrete (1:3:6) 10cm thick sides 10cm thick bed over brick flat soling including 15mm thick cement plastering in prop. 1:3 finished with a floating coat of cement slurry as directed with necessary shttering for sides and earth work in excavation of foundation trenches and refilling the sides after completion of work etc. as specified.
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.
15mm nominal dia pipes
25mm nominal dia pipes
20mm nominal dia pipes
50mm nominal dia pipes
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end)
25mm nominal dia bore
50mm nominal dia bore
Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete
15mm nominal dia bore
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Market PriceHavells Hi-Flow MP1-1.0HP 1PH Centrifugal Pump.
Providing and fixing C.P. brass shower rose with 15 or 20 mm inlet : 150 mm dia
Installation of Hand Tube Well
Boring with 100 mm diameter casing pipe for hand pump / tubewell, in all soils except ordinary hard rocks requiring blasting, including removing the casing pipe after the hand pump / tube well is lowered and tested : 18.42.3 Beyond 12 m and up to 18 m depth
Providing and placing in position filters of 40 mm diameter G.I. pipe with brass strainer of approved quality.
Providing and fixing to filter and lowering to proper levels 40 mm G.I. pipe for tube well including cleaning and priming the tube well.
Providing and placing in position hand pump of approved quality for 40 mm diameter G.I. pipe complete with all accessories . (iii) 40mm dia
Providing and fixing gun metal non- return valve of approved quality (screwed end) : 18.19.3 40 mm nominal bore 18.19.3.2 Vertical
REDUCER Providing and fixing required Stainless Steel Fitting of press fit design of grade 316L as per IS 6911:2017 and conforming to EN-10312 standards with V-profile and with O-ring sealing gasket of EPDM material of required dia as per dirction of Engineer-in-charge. 18.88A.7 For 42 mm x 28 mm outer dia pipe
REDUCING TEE Providing and fixing required Stainless Steel Fitting of press fit design of grade AISI 304 conforming to JWWA G116 standard with V-profile or M-profile and with O-ring sealing gasket of EPDM material of required dia as per direction of Engineer-in-charge. 18.93.2 For 28.58 mm x 15.88 mm outer dia pipe
Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and making long screws etc. complete (New work) :aggregate 20 mm nominal size derived from natural sources) 20 mm nominal bore
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge All kinds of soil
Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.3A 1:2:4 (1 cement : 2 coarse sand (zone-III) including manufactured sand derived from Recycled Concrete Aggregate (RCA) upto 25% : 4 graded stone aggregate 20 mm nominal size Recycled Concrete Aggregate (RCA) upto 25%)
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in : 6.12.2 cement mortar 1:4 (1 cement : 4 coarse sand)
Cement plaster skirting up to 30 cm height, with cement mortar 1:3 (1 cement : 3 coarse sand), finished with a floating coat of neat cement. 11.6.1 18 mm thick
Construction of Boundary Fencing
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. 2.6.1 All kinds of soil
Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more
8mm/10mm/12mm/16mm tor
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. 5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more.
8mm/12mm tor
Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size de rived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge. Made of G.I. wire of dia 4 mm4 coarse sand)
Finishing walls with water proofing cement paint of required shade New work (Two or more coats applied @ 3.84 kg/10 sqm)
Sampri Bey (BID ID -254107)
Y NOT SOLUTIONS (BID ID -254497)
DONY GOHAIN (BID ID -254510)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .