| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.0 LAdmitted-Finance | ₹49.0 L | L1 | Admitted-Finance |
| 2 | L2₹50.1 L+₹1.1 L (2.21%)Admitted-Finance | ₹50.1 L+₹1.1 L (2.21%) | L2 | Admitted-Finance |
| 3 | L3₹52.5 L+₹3.5 L (7.06%)Admitted-Finance | ₹52.5 L+₹3.5 L (7.06%) | L3 | Admitted-Finance |
| 4 | L4₹53.3 L+₹4.3 L (8.72%)Admitted-Finance | ₹53.3 L+₹4.3 L (8.72%) | L4 | Admitted-Finance |
| 5 | L5₹53.7 L+₹4.7 L (9.62%)Admitted-Finance | ₹53.7 L+₹4.7 L (9.62%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S ABHILASHA CONSTRUCTION L3 | DEVI SINGH THEKEDAR L4 | M/S MAHESH SAMADHIYA L6 | Hari Construction L1 | M/s SINGH BROTHERS L5 | M/S SURYANSH ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|---|---|
| 0.00ITEMS | |||||||||
| 1.00 | Excavation in Earthwork in Mar, kabar, Ranker and Kankar mixed soil in digging including lead up to 30 M and lift upto 1.5M including dressing making profile and manual compaction but excluding mechanical compaction. U.P.I.D. S.I no. 4.15+4.22 | 10,936.28 | m³ | 56 ₹6,12,431.68 | 50 ₹5,46,814 | 63 ₹6,88,985.64 | 67 ₹7,32,730.76 | 68 ₹7,43,667.04 | 46 ₹5,03,068.88 Lowest |
| 2.00 | Earth work excavation by Machine (Lift as above) | 61,972.25 | m³ | 52 ₹32,22,557 | 46 ₹28,50,723.5 Lowest | 56 ₹34,70,446 | 49 ₹30,36,640.25 | 52 ₹32,22,557 | 50 ₹30,98,612.5 |
| 3.00 | Earth work in manual Dressing & profile making of Bund Embankment | 43,559.24 | m³ | 21 ₹9,14,744.04 | 30 ₹13,06,777.2 | 18 ₹7,84,066.32 | 11 ₹4,79,151.64 Lowest | 19 ₹8,27,625.56 | 18 ₹7,84,066.32 |
| 4.00 | Excavation in Earthwork in Mar, kabar, Ranker and Kankar mixed soil in (Inlet,Ramp) S.I. no 4.15 | 202.74 | m³ | 60 ₹12,164.4 | 60 ₹12,164.4 | 50 ₹10,137 Lowest | 55 ₹11,150.7 | 60 ₹12,164.4 | 50 ₹10,137 Lowest |
| 5.00 | Supply and filling sand in foundation of Inlet,Ramp,Ghat | 21.34 | m³ | 1,200 ₹25,608 | 1,000 ₹21,340 Lowest | 1,300 ₹27,742 | 1,420 ₹30,302.8 | 1,340 ₹28,595.6 | 1,000 ₹21,340 Lowest |
| 6.00 | C.C.in 1:3:6 Cement, Sand and 20 to 40 mm gauge Stone ballast including the cost of materials labours and etc. required for proper completion of work.(Inlet,Ramp,) | 32.56 | m³ | 2,500 ₹81,400 Lowest | 3,400 ₹1,10,704 | 3,600 ₹1,17,216 | 3,540 ₹1,15,262.4 | 3,311 ₹1,07,806.16 | 3,600 ₹1,17,216 |
| 7.00 | R.C.R Stone massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work.(Inlet,Outlet,Ramp,Ghat.) | 65.33 | m³ | 3,200 ₹2,09,056 Lowest | 3,600 ₹2,35,188 | 3,600 ₹2,35,188 | 3,550 ₹2,31,921.5 | 3,250 ₹2,12,322.5 | 3,700 ₹2,41,721 |
| 8.00 | Supply and fixing of 1000mm dia NP3hume pipe with coller (Inlet,Outlet,) | 25 | rm | 3,500 ₹87,500 Lowest | 5,300 ₹1,32,500 | 5,001 ₹1,25,025 | 5,490 ₹1,37,250 | 4,896 ₹1,22,400 | 5,300 ₹1,32,500 |
| 9.00 | C.C.in 1:2:4 Cement, Sand and 10 to 20 mm grit including the cost of materials labours and etc.to required for proper completion of work.(Inlet,Outlet,Ramp,Ghat.) | 10.59 | m³ | 3,300 ₹34,947 Lowest | 4,200 ₹44,478 | 4,550 ₹48,184.5 | 4,120 ₹43,630.8 | 3,780 ₹40,030.2 | 4,200 ₹44,478 |
Tender Value
Refer Docs
EMD Value
₹6.4 L
Closing Date
17 Jun 2021, 5:00 pmClosed
EEMI JHANSI
RISHALA CHUNGI KANPUR ROAD JHANSI
MODERNIZATION OF POND BENDA TALAB VILLAGE BENDA BLOCK BAMAUR
2021_UPMID_593079_2
03/MODERNIZATION OF POND/2021-22
Open Tender
Civil Works
Fixed-rate
120 days
JHANSI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,348
EEMI DIVISION JHANSI
₹6.4 L
Yes
21 Jun 2021
10 Jun 2021
18 Jun 2021
10 Jun 2021
17 Jun 2021
10 Jun 2021
Amount
ITEMS
Excavation in Earthwork in Mar, kabar, Ranker and Kankar mixed soil in digging including lead up to 30 M and lift upto 1.5M including dressing making profile and manual compaction but excluding mechanical compaction. U.P.I.D. S.I no. 4.15+4.22
Earth work excavation by Machine (Lift as above)
Earth work in manual Dressing & profile making of Bund Embankment
Excavation in Earthwork in Mar, kabar, Ranker and Kankar mixed soil in (Inlet,Ramp) S.I. no 4.15
Supply and filling sand in foundation of Inlet,Ramp,Ghat
C.C.in 1:3:6 Cement, Sand and 20 to 40 mm gauge Stone ballast including the cost of materials labours and etc. required for proper completion of work.(Inlet,Ramp,)
R.C.R Stone massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work.(Inlet,Outlet,Ramp,Ghat.)
Supply and fixing of 1000mm dia NP3hume pipe with coller (Inlet,Outlet,)
C.C.in 1:2:4 Cement, Sand and 10 to 20 mm grit including the cost of materials labours and etc.to required for proper completion of work.(Inlet,Outlet,Ramp,Ghat.)
Raised struck pointing in 1:2 Cement sand mortar including the cost of material labour etc.to required for proper completion of work.(Inlet,Ramp,)
Dry stone boulder filling in chamber
Dewatering during the work by 8 HP Diesel pumping set.
M/S SURYANSH ENTERPRISES
M/S ABHILASHA CONSTRUCTION
DEVI SINGH THEKEDAR
M/s SINGH BROTHERS
M/S MAHESH SAMADHIYA
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .