Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance R O BAGHJOGI LANKER RAINAWARI SRINAGAR | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
22 Apr 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineert CDC
Samander Bagh Srinagar
Construction of Pipe drain from House of Fayaz Ahmad Ganai upto outfall drain at Alamdar Colony Extension Baghati Shura
2021_HAUDD_122429_1
e_NIT_02_CDC_2021_2022
Open Tender
Civil Works
Item Rate
30 days
Baghati Shura
Please refer Tender documents.
5 documents required · 5 mandatory
₹750
Executive Engineer CDC
Exempted
24 Apr 2021
15 Apr 2021
24 Apr 2021
17 Apr 2021
22 Apr 2021
17 Apr 2021
90 days
Amount
Dismantling including stacking of serviceable material & disposal of un-serviceable material within 50M. lead. i)- Bituminous road
Earth work in excavation by manual means in drains pipes, cables etc. (not exceeding 1.5m.in width) and for shafts, wells, cesspits and the like not exceeding 10sqm. on plan ,depth upto 1.5m including disposal of excavated earth upto 1 meter from cutting edge disposed earth to be leveled and neatly dressed in:- All kinds of soil.
Earth work in excavation by Mechanical means (Hydraulic excavator) in foundation trenches, drains, pipes and cables (not exceeding 1.5m.in width or 10sqm. on plan) ) including dressing of sides and ramming of bottoms lift upto 1.5m. including getting out the excavated soil and disposal of surplus soil as directed within a leaf of 50 meters. All kinds of soil.
Filling available excavated earth (excld. Rock) in trenches plinth slides of foundation etc. layers not exceeding 20cm in depth consolidating each deposited layer by ramming & watering lead upto 50m. & lift upto 1.5m.
Providing and laying of stone soling
Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level:- 1:4:8 (1cement: fine sand: 8graded stone aggregate 40mm nominal size) Crushed.
Centring & shuttering including strutting propping etc. & removal of form work for:- Walls (any thickness) incld. Attached pilasters buttresses plinth and string courses etc.
Suspended floors,roofs landings balconies and access plate form.
Edges of slabs & breaks in floors & walls above 20cms wide.
Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level:- 1:3:6 (1cement: 3coarse sand: 6graded stone aggregate 20mm nominal size)Crushed.
Providing & laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing & reinforcement All work upto Plinth level 1:2:4 (1cement: 2coarse sand: 4graded stone aggregate 20mm nominal size)
Providing & laying in position Cement concrete of specified grade excluding the cost of centring shuttering, finishing & reinforcement All work upto plinth level:-1:1½:3(1cement:1½ coarse sand:3graded stone aggregate 20mm nominal size).
Reinforcement for R.C.C. work including straightening cutting bending, placing in position and binding all complete -Thermo mechanically treated Bars.
Fixing of manhole covers including all safe carriage upto site of work (Labour only).
Clearance of open, covered drain/ sewer manholes, silt Chamber , sump wells etc. by way of removal of silt ,garbage , sewage, mud, slush, organic / inorganic matters and other solids, cleaning of sewer pipes by rodding or by any means from manholes and well flushing after cleaning including all leads lifts and its disposal upto final dumping site as directed by Engineer Incharge at site by Mechanical transport including construction of Ring bund dewatering by deploying dewatering pumps (complete job). Shrinkage will be deducted @25%as water content.
Providing and laying nallah muck (G.S.B)in trenches in layers not exceeding 20cm in depth consolidating each layer by ramming/watering and compacting including all carriages upto site of work. (Complete Job).
Laying to level and slope with proper grade pipes of class NP3 of 300mm internal dia and grouting the pipe joints with cement slurry 1:2 mix (1cement:2fine sand)and also sealing the pipe joints with rubber gaskets including cost of cement, sand and rubber gasket but excluding RCC pipes including testing of joints and all safe carriages of pipes from departmental store upto site of work including loading and unloading. (Complete Job)All told.
600mm dia =do=
Carriage of materials by mechanical transport including loading, unloading & stacking from approved source to site of work:- Stone soling from Athwajan for 18 Kms.
40mm N.S. stone agg. –do-
Below 40mm N/S -do-
Sand from Ganderbal Kms
Surplus excavated earth for 10 Kms
ARSHID AHMAD TANTRAY
IMRAN AMIN MIR
MEHRAJUDIN BHAT
M/S BASHIR AHMAD CHACHOO
ZUBAIR ABBAS MIR
M/S TARIQ AHMAD BHAT
BILAL AHMAD BHAT
FAROOQ AHMAD DAR
M/s SB-CONSTRUCTIONS
Abdul Hamid Dendroo
stage.html
html • 0.04 MB
finance_236803.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .