| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹134.0 CrAccepted-AOC | ₹134.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹148.9 Cr+₹14.9 Cr (11.2%)Rejected-AOC | ₹148.9 Cr+₹14.9 Cr (11.2%) | L2 | Rejected-AOC L2 |
| 3 | L3₹162.0 Cr+₹28.0 Cr (20.9%)Rejected-AOC | ₹162.0 Cr+₹28.0 Cr (20.9%) | L3 | Rejected-AOC L3 |
| 4 | Techno Electric Engineering Co Ltd L4₹166.0 Cr+₹32.0 Cr (23.9%)Rejected-AOC | ₹166.0 Cr+₹32.0 Cr (23.9%) | L4 | Rejected-AOC L4 |
| 5 | L5₹167.1 Cr+₹33.1 Cr (24.7%)Rejected-AOC 8TH FLOOR BUILDING NO 9A DLF CYBER CITY PHASE III GURGAON 122002 | GURGAON | GURGAON | HARYANA | 122002 | ₹167.1 Cr+₹33.1 Cr (24.7%) | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹5 Cr
Closing Date
13 Aug 2020, 1:00 pmClosed
PROJECT DIRECTOR AIIB
AEGCL, 1ST FLOOR, BIJULEE BHAWAN, GUWAHATI 781001
CONSTRUCTION OF 220 by 33KV, 2X100 MVA GIS AT TWO LOCATIONS (NAGAON-2 and CHAYGAON) AND ASSOCIATED TRANSMISSION LINES - PACKAGE B
2020_AEGEF_17332_2
AEGCL/MD/AIIB/Package B/2020/02-B
Open Tender
Electrical Works
Works
1080 days
ASSAM
AS PER BID
6 documents required · 6 mandatory
₹30,000
AEGCL
₹5 Cr
Yes
16 Feb 2021
4 Aug 2020
14 Aug 2020
4 Aug 2020
13 Aug 2020
4 Aug 2020
Supply_Sub_CHAYGAON
Supply_Sub_Nagaon 2
Supply_line_Chaygaon
Supply_line_Nagaon2
Erec_Sub_CHAYGAON
Erec_Sub_Nagaon2
Erec_Line_Chaygaon
Erec_Line_Nagaon 2
Neccon Power and Infra Limited
Kanti Prashad Mittal
Techno Electric Engineering Co Ltd
Shyama Power India limited
KEC INTERNATIONAL LIMITED
LARSEN AND TOUBRO LIMITED
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .