| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.0 LAccepted-AOC | 1 | Accepted-AOC The lowest rate quoted by the contractor SRK ENTERPRISES | |
| 2 | 2₹15.1 L+₹6,406.18 (0.43%)Rejected-Finance | 2 | Rejected-Finance Admitted | |
| 3 | 3₹15.8 L+₹72,866.26 (4.85%)Rejected-Finance | 3 | Rejected-Finance Admitted | |
| 4 | 4₹16.7 L+₹1.7 L (11.1%)Rejected-Finance | 4 | Rejected-Finance Admitted | |
| 5 | 5₹16.9 L+₹1.8 L (12.2%)Rejected-Finance | 5 | Rejected-Finance Admitted |
| Sl No | Description | Qty | Unit | M.MURUGAN L3 | SRK ENTERPRISES L1 | JHAS ENTERPRISES L5 | SAKTHI PRABAKARAN L2 | M/S.REVATHY CONSTRUCTIONS L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earht work excavation in all clauses of soil and subsoil to full depth as may be directed except hard rock including all materials to site etc complete. As Per SS 2B | 52.63 | cum | 250 ₹13,157.5 | 237.4 ₹12,494.36 Lowest | 266.42 ₹14,021.68 | 250 ₹13,157.5 | 264 ₹13,894.32 |
| 2.00 | Cement concrete 1:4:8 mix using 40mm HBG metal including cost and convenyance all materials to site etc complete. | 12.71 | cum | 4,000 ₹50,840 Lowest | 4,810.34 ₹61,139.42 | 5,398.27 ₹68,612.01 | 4,000 ₹50,840 Lowest | 5,345 ₹67,934.95 |
| 3.00 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal including cost and convenyance all materials to site etc complete | 22.25 | cum | 8,500 ₹1,89,125 | 8,159.87 ₹1,81,557.11 | 9,157.19 ₹2,03,747.48 | 8,000 ₹1,78,000 Lowest | 9,065 ₹2,01,696.25 |
| 4.00Supplying and Erecting centering for Rcc itmes of works as per design including cost of shutting and labour chargers etc complete | ||||||||
| 5.00 | Belove Ground Level | 32.07 | sqm | 500 ₹16,035 | 492.75 ₹15,802.49 Lowest | 552.98 ₹17,734.07 | 500 ₹16,035 | 548 ₹17,574.36 |
| 6.00 | Above Ground Level | 133.74 | sqm | 950 ₹1,27,053 | 985.5 ₹1,31,800.77 | 1,105.95 ₹1,47,909.75 | 800 ₹1,06,992 Lowest | 1,095 ₹1,46,445.3 |
| 7.00 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement 5 concrete works as per the design given jncluding cost of steel and binding wire in all floors ete, Complete complying with stanard specification. | 2.25 | Mt | 85,000 ₹1,91,250 | 82,672.65 ₹1,86,013.46 Lowest | 92,777.09 ₹2,08,748.45 | 83,000 ₹1,86,750 | 91,859 ₹2,06,682.75 |
| 8.00Brick work in CM 1 :5mix using country bricks including cost and convenyance all materials to site etc complete. | ||||||||
| 9.00 | Belove Basement | 13.55 | cum | 6,000 ₹81,300 | 5,491.01 ₹74,403.19 Lowest | 6,162.13 ₹83,496.86 | 5,500 ₹74,525 | 6,101 ₹82,668.55 |
| 10.00 | Above Basement | 20.83 | cum | 6,000 ₹1,24,980 | 5,574.59 ₹1,16,118.71 Lowest | 6,255.93 ₹1,30,311.02 | 5,800 ₹1,20,814 | 6,194 ₹1,29,021.02 |
Tender Value
₹17.3 L
EMD Value
₹17,250
Closing Date
24 Feb 2026, 3:00 pmClosed
Block Development Officer VP Acharapakkam
Block Development Office VP Acharapakkam
Construction of Anganwadi Building near Panchayat office Building Elapakkam Panchayat at Acharapakkam panchayat Union in Chengalpattu District under AGAMT
2026_RDTN_660469_1
DIPR/4846/A10/2024
Open Tender
Civil Works
Item Rate
90 days
Elapakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,250
Yes
10 Mar 2026
18 Feb 2026
24 Feb 2026
18 Feb 2026
24 Feb 2026
18 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earht work excavation in all clauses of soil and subsoil to full depth as may be directed except hard rock including all materials to site etc complete. As Per SS 2B | - | cum | - | - |
| 2 | Cement concrete 1:4:8 mix using 40mm HBG metal including cost and convenyance all materials to site etc complete. | - | cum | - | - |
| 3 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal including cost and convenyance all materials to site etc complete | - | cum | - | - |
| 4 | Supplying and Erecting centering for Rcc itmes of works as per design including cost of shutting and labour chargers etc complete | - | - | - | - |
| 5 | Belove Ground Level | - | sqm | - | - |
| 6 | Above Ground Level | - | sqm | - | - |
| 7 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement 5 concrete works as per the design given jncluding cost of steel and binding wire in all floors ete, Complete complying with stanard specification. | - | Mt | - | - |
| 8 | Brick work in CM 1 :5mix using country bricks including cost and convenyance all materials to site etc complete. | - | - | - | - |
| 9 | Belove Basement | - | cum | - | - |
| 10 | Above Basement | 1 | cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_792418.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Technical.pdf
Tender Documents • 1.19 MB
BOQ_792418.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .