| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance | ₹2.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.4 Cr+₹1.1 L (0.44%)Admitted-Finance | ₹2.4 Cr+₹1.1 L (0.44%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | srree senthil constructions L1 | Kanganam Construction L2 |
|---|---|---|---|---|---|
| 1.00 | Andipalayam to kuruchivalasu | 1 | nos | - | - |
| 2.00 | Clearing light Jungles including all labour charges for burrying and burning etc., complete., | 1 | sqm | - | - |
| 3.00 | Km 0/0-4/750 | 4,713.01 | sqm | - | - |
| 4.00 | Scarifying the old metalled surface | 1 | cum | - | - |
| 5.00 | Km 0/0-4/750 | 5,454.88 | nos | - | - |
| 6.00 | Excavation for road works in soil with excavators including cutting loading in tippers trimming bottom side slopes according with requirement of lines and gross section transporting to embankment location as per technical specification | 1 | cum | - | - |
| 7.00 | Km0/0-4/750 | 228.75 | cum | - | - |
| 8.00 | Filling using cut earth as per technical specification | 1 | cum | - | - |
| 9.00 | Km 0/0-4/750 | 228.75 | cum | - | - |
| 10.00 | Construction of subgrade and earthen shoulder with approved materials obtain from borrow pit as per technical specification-using borrow pit earth | 1 | nos | - | - |
Tender Value
₹2.4 Cr
EMD Value
₹4.9 L
Closing Date
11 Jun 2020, 3:00 pmClosed
PROJECT DIRECTOR
DRDA,TIRUPPUR
TIRUPPUR DISTRICT PMGSY III 2019-20 VELLAKOIL BLOCK PKG NO TN 31 162
2020_RDTN_92363_1
TN31162
Open Tender
Civil Works - Roads
Item Rate
270 days
VELLAKOIL
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4.9 L
Yes
DRDA,TIRUPPUR
7 Apr 2021
13 May 2020
11 Jun 2020
13 May 2020
11 Jun 2020
13 May 2020
28 May 2020
Amount
Andipalayam to kuruchivalasu
Clearing light Jungles including all labour charges for burrying and burning etc., complete.,
Scarifying the old metalled surface
Excavation for road works in soil with excavators including cutting loading in tippers trimming bottom side slopes according with requirement of lines and gross section transporting to embankment location as per technical specification
Filling using cut earth as per technical specification
Construction of subgrade and earthen shoulder with approved materials obtain from borrow pit as per technical specification-using borrow pit earth
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc., complete Shoulders
Wet mix macadam for road surface
Applying PRIME COAT over WMM surface at 0.85KG/sq.m including labour for spraying, hire charges for bitumen sprayer etc., complete
ApplyingTACK COAT over WMM surface at0.275KG/ sq.m including labour for spraying, hire charges for bitumen sprayer etc., complete
Providing, laying and rolling of open- graded premix carpet of 20 mm thick composed of 13.2 mm to 5.60 mm aggregates eithe using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity , finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical specification Clause 508.
Providing, laying SEAL COAT to be followed by seal coat of either Type A or Type B or Type C as per Technical specification Clause 508.
RUMBLE STRIPS
Construction of 6.0 m span slab Rcc culvert at chainage 2300m
Dismantling the existing structures like culvert retaining wall and bridges comprising of masonary ,cement concrete works as per technical specification
Dismantling the existing structures like culvert retaining wall and bridges comprising of Brick masonary ,as per technical specification
Removing all types of hume pipe and stacking with a lead of 1000m s per technical specification
Earthwork excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Supplying and filling foundation and basement with filling sand in layers not more than 15 cm thick well rammed , wateed and compacted complete complying with satndard specifications and as directed.
Cement concrete 1:2.5: 5 mix using 40 mm HBG metal for foundation including watering wherever necessary and laind in layes of not more than 15 cm thick compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:2:4 mix using 40 mm HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed.,
Below sill level
Above sill level
bed block and dirt wall
Cment concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges , centering and shuttering but including curing and shall be finished smooth with CM 1:3 , 12 mm thick and with kraft paper without claiming as extra as directed by the departmental officers complete complying with standard specifications.
Supplying and fabricating and placing in position MS steel or ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification( mS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate). the binding wire shall supplied by the contractor.
providing and fixing 20mm thick compressible fibre board
Providing and fixing Tar Paper for bearing Between Bed block and deck slab
Providing weepholes in brick masonry / stone masonry , plain/ reinforced concrete abutment , wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V) : 20 (H) towards drawing face complete as per drawing and technical specifiaction cluses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc., complete complying with satndard specification and as directed by the departmental officer.
Construction of 6.00m span slab culvert at chainage 2444m
Dismantling the existing structures like culvert retaining wall and bridges comprising of masonary ,cement concrete works as per technical specification
Dismantling the existing structures like culvert retaining wall and bridges comprising of Brick masonary ,as per technical specification
Removing all types of hume pipe and stacking with a lead of 1000m s per technical specification
Earthwork excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Supplying and filling foundation and basement with filling sand in layers not more than 15 cm thick well rammed , wateed and compacted complete complying with satndard specifications and as directed.
Cement concrete 1:2.5: 5 mix using 40 mm HBG metal for foundation including watering wherever necessary and laind in layes of not more than 15 cm thick compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:2:4 mix using 40 mm HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed.,
Below sill level
Above sill level
bed block and dirt wall
Cment concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges , centering and shuttering but including curing and shall be finished smooth with CM 1:3 , 12 mm thick and with kraft paper without claiming as extra as directed by the departmental officers complete complying with standard specifications.
Supplying and fabricating and placing in position MS steel or ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification( mS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate). the binding wire shall supplied by the contractor.
providing and fixing 20mm thick compressible fibre board
Providing and fixing Tar Paper for bearing Between Bed block and deck slab
Providing weepholes in brick masonry / stone masonry , plain/ reinforced concrete abutment , wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V) : 20 (H) towards drawing face complete as per drawing and technical specifiaction cluses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc., complete complying with satndard specification and as directed by the departmental officer.
Construction of 1.50m RCC Slab culvert at 2460m
Dismantling the existing structures like culvert retaining wall and bridges comprising of masonary ,cement concrete works as per technical specification
Dismantling the existing structures like culvert retaining wall and bridges comprising of Brick masonary ,as per technical specification
Removing all types of hume pipe and stacking with a lead of 1000m s per technical specification
Earthwork excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Supplying and filling foundation and basement with filling sand in layers not more than 15 cm thick well rammed , wateed and compacted complete complying with satndard specifications and as directed.
Cement concrete 1:2.5: 5 mix using 40 mm HBG metal for foundation including watering wherever necessary and laind in layes of not more than 15 cm thick compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:2:4 mix using 40 mm HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed.,
Below sill level
Above sill level
bed block and dirt wall
Cment concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges , centering and shuttering but including curing and shall be finished smooth with CM 1:3 , 12 mm thick and with kraft paper without claiming as extra as directed by the departmental officers complete complying with standard specifications.
Supplying and fabricating and placing in position MS steel or ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification( mS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate). the binding wire shall supplied by the contractor.
providing and fixing 20mm thick compressible fibre board
Providing and fixing Tar Paper for bearing Between Bed block and deck slab
Providing weepholes in brick masonry / stone masonry , plain/ reinforced concrete abutment , wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V) : 20 (H) towards drawing face complete as per drawing and technical specifiaction cluses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc., complete complying with satndard specification and as directed by the departmental officer.
Construction of 1.50m RCC Slab culvert at 4430 m
Earthwork excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Supplying and filling foundation and basement with filling sand in layers not more than 15 cm thick well rammed , wateed and compacted complete complying with satndard specifications and as directed.
Cement concrete 1:2.5: 5 mix using 40 mm HBG metal for foundation including watering wherever necessary and laind in layes of not more than 15 cm thick compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:2:4 mix using 40 mm HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed.,
Below sill level
Above sill level
bed block and dirt wall
Cment concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges , centering and shuttering but including curing and shall be finished smooth with CM 1:3 , 12 mm thick and with kraft paper without claiming as extra as directed by the departmental officers complete complying with standard specifications.
Supplying and fabricating and placing in position MS steel or ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification( mS rod or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate). the binding wire shall supplied by the contractor.
providing and fixing 20mm thick compressible fibre board
Providing and fixing Tar Paper for bearing Between Bed block and deck slab
Providing weepholes in brick masonry / stone masonry , plain/ reinforced concrete abutment , wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V) : 20 (H) towards drawing face complete as per drawing and technical specifiaction cluses 614,709,1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc., complete complying with satndard specification and as directed by the departmental officer.
Construction of hard bed at 2470m
Earthwork excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Cement concrete 1:2.5: 5 mix using 40 mm HBG metal for foundation including watering wherever necessary and laind in layes of not more than 15 cm thick compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:2:4 mix using 40 mm HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed.,
Construction of GSB BY PROVIDING WELL GRADED MATERIALS LAYING IN UNIFORM LAYER AS PER TECHNICAL SPECIFICATION
Providing and laying WMM AS PER TECHNICAL SPECIFICATION
wearing coat 75mm thick in CC 1:1.5:3 mix using 65% 25mm 25% 12mm and 10% 6mm IRC HBG Metal including all cost
Construction of hard bed at 4210m
Earthwork excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Cement concrete 1:2.5: 5 mix using 40 mm HBG metal for foundation including watering wherever necessary and laind in layes of not more than 15 cm thick compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:2:4 mix using 40 mm HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed.,
Construction of GSB BY PROVIDING WELL GRADED MATERIALS LAYING IN UNIFORM LAYER AS PER TECHNICAL SPECIFICATION
Providing and laying WMM AS PER TECHNICAL SPECIFICATION
wearing coat 75mm thick in CC 1:1.5:3 mix using 65% 25mm 25% 12mm and 10% 6mm IRC HBG Metal including all cost
Construction of Retaining wall 1800m
Earthwork excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Supplying and filling foundation and basement with filling sand in layers not more than 15 cm thick well rammed , wateed and compacted complete complying with satndard specifications and as directed.
Cement concrete 1:2.5: 5 mix using 40 mm HBG metal for foundation including watering wherever necessary and laind in layes of not more than 15 cm thick compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:2:4 mix using 40 mm HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed., below sill
Cement concrete 1:2:4 mix using 40 mm HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm thick, compacting etc., complete complying with satndard specifications and as directed., Above sill
providing weep holes
providing filter media behind abutement wall
proviiding and fixing name board
Fixing PMGSY Logo
Fixing citizen information board
Fixing Maintenance information board
Providing and fixing cautionary ,mandatory and information sign board
90cm Equilateral triangle sign board
60cm circular sign board
chevron signs90cm octagon
Reflector
Road marking with hot applied hermoplast compound with reflector glass beads
ordinary KM stone
200m stone
Guard stone
Maintenanace I year
Maintenanace II year
Maintenanace III year
Maintenanace IV year
Maintenanace V year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Kanganam Construction
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
pkg162.pdf
Tender Documents • 0.96 MB
BOQ_158406.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .