| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAdmitted-Finance STATION ROAD DEOGHAR | ₹3.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.9 Cr+₹23.9 L (6.57%)Admitted-Finance PREM KUNJ APARTMENT FLAT NO 3C MPD ROAD JAGDISHPUR BHAGALPUR BIHAR | BHAGALPUR | BIHAR | 811211 | ₹3.9 Cr+₹23.9 L (6.57%) | L2 | Admitted-Finance |
| 3 | L3₹4.6 Cr+₹92.7 L (25.5%)Admitted-Finance | ₹4.6 Cr+₹92.7 L (25.5%) | L3 | Admitted-Finance |
| 4 | L3₹4.6 Cr+₹92.7 L (25.5%)Admitted-Finance BARHAIT SAHIBGANJ GODDA JHARKHAND 816102 | SAHEBGANJ | JHARKHAND | 816102 | ₹4.6 Cr+₹92.7 L (25.5%) | L3 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Sri Ram Enterprises L2 | RABBANI CONSTURCTION PRIVATE LIMITED L3 | M/s Hardev Construction Pvt. Ltd. L1 | BASUMATI CONSTRUCTION PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation, trenches in ordinary soil(vide classification of soil item-A) and disposal of excavated earth so obtained to a distance up to 50M and average lift 1.50M including levelling, ramming the foundation trenches, removing the roots or shrubs etc. All complete as per specification and direction of E/I.(SR Item no7.1.27) | 40,800 | M3 | 100 ₹40,80,000 | 120.75 ₹49,26,600 | 90 ₹36,72,000 Lowest | 120.75 ₹49,26,600 |
| 2.00 | Extra for wet earth, all complete as per specification and direction of E/I ( SR Item no 7.1.22) | 9,720 | M3 | 9 ₹87,480 Lowest | 10.5 ₹1,02,060 | 9 ₹87,480 Lowest | 10.5 ₹1,02,060 |
| 3.00 | Providing and laying of Geo-Textile filer between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment materials through the voids of the stone pitching / cement concrete block as well as to allow free movement of water without creating any uplift head on the pitching as per specification and direction of E/I.(SR Item no-M109) | 11,970 | M2 | 60 ₹7,18,200 | 72.72 ₹8,70,458.4 | 52 ₹6,22,440 Lowest | 72.72 ₹8,70,458.4 |
| 4.00 | Providingcompacted 150mm thick sand filter of required FM as per design on site slopes and in bed of canail with coarse sand including cost of water, ramming, leveling,and dressing etc all complete as per specification and direction of E/I SR Item no. 7.2.1.B | 11,250 | M2 | 125 ₹14,06,250 Lowest | 149.1 ₹16,77,375 | 370 ₹41,62,500 | 149.1 ₹16,77,375 |
| 5.00 | labour charge for pitching above water on apron and slope of bank with boulder in crates (of specified size) (materials within 150 meters lead and all lifts) including boxing and tying the crates with 12 to 14 gauge G.I wire including cost of G.I wire. All complete job as per specification and directionof E.I .(7.7.21) | 4,137.84 | M3 | 800 ₹33,10,272 | 943.95 ₹39,05,914.07 | 470 ₹19,44,784.8 Lowest | 943.95 ₹39,05,914.07 |
| 6.00 | Supply of boulder M003 | 13,173.48 | M3 | 378 ₹49,79,575.44 | 440.95 ₹58,08,846.01 | 350 ₹46,10,718 Lowest | 440.95 ₹58,08,846.01 |
| 7.00 | labour charge for pitching above water on apron and slope of bank with stone boulder duly packed (uncrated complete job & material within 150 M lead and all lifts) as per specification and direction of E/I. (7.7.18) | 9,035.64 | M3 | 650 ₹58,73,166 | 770.7 ₹69,63,767.75 | 420 ₹37,94,968.8 Lowest | 770.7 ₹69,63,767.75 |
| 8.00 | Supply of G.I wire of 8to 10 S.W.G All complete as per specification and direction of E/I.(SR Item no-M205) | 39,092.96 | KG | 70 ₹27,36,507.2 Lowest | 81.51 ₹31,86,467.17 | 90 ₹35,18,366.4 | 81.51 ₹31,86,467.17 |
| 9.00 | Labour charge for making crate box of size (1.5x1.5x0.60) including weaving of wire to make of taranga wire having 100 mm to 150 mm square mesh with double knot with 8 to 10 S.W.G wire as per specificitin and direction of E/I.(7.7.32.1) | 3,832 | Nos. | 430 ₹16,47,760 | 501.9 ₹19,23,280.8 | 240 ₹9,19,680 Lowest | 501.9 ₹19,23,280.8 |
| 10.00 | Carriage of materials by mechanical transport including loading unloading and stacking as per specification and direction of E/I. Stone boulder lead 33 Km. From Baskola | 13,173.48 | M3 | 680 ₹89,57,966.4 | 793.28 ₹1,04,50,258.21 | 640 ₹84,31,027.2 Lowest | 793.28 ₹1,04,50,258.21 |
Tender Value
Refer Docs
EMD Value
₹4.3 L
Closing Date
8 Apr 2021, 5:00 pmClosed
EE, Ganga Pump Canal Division, Sahibganj
Executive Engineer, Ganga Pump Canal Division, Sahibganj
Anti erosion work on the right bank of river Ganga at Kattitola to Bano tola in 400 M length under district Sahibganj.
2021_WRD_49034_1
WRD/GPCDIV/SBG/SBD 01/2020-21 Dt 19.03.2021
Open Tender
Civil Works
Item Rate
300 days
udhwa
Please Refer Tender Documents
3 documents required · 3 mandatory
₹10,000
EE, Ganga Pump Canal Division, Sahibganj
₹4.3 L
Yes
7 Jun 2021
30 Mar 2021
12 Apr 2021
30 Mar 2021
8 Apr 2021
30 Mar 2021
Amount
Earth work in excavation of foundation, trenches in ordinary soil(vide classification of soil item-A) and disposal of excavated earth so obtained to a distance up to 50M and average lift 1.50M including levelling, ramming the foundation trenches, removing the roots or shrubs etc. All complete as per specification and direction of E/I.(SR Item no7.1.27)
Extra for wet earth, all complete as per specification and direction of E/I ( SR Item no 7.1.22)
Providing and laying of Geo-Textile filer between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment materials through the voids of the stone pitching / cement concrete block as well as to allow free movement of water without creating any uplift head on the pitching as per specification and direction of E/I.(SR Item no-M109)
Providingcompacted 150mm thick sand filter of required FM as per design on site slopes and in bed of canail with coarse sand including cost of water, ramming, leveling,and dressing etc all complete as per specification and direction of E/I SR Item no. 7.2.1.B
labour charge for pitching above water on apron and slope of bank with boulder in crates (of specified size) (materials within 150 meters lead and all lifts) including boxing and tying the crates with 12 to 14 gauge G.I wire including cost of G.I wire. All complete job as per specification and directionof E.I .(7.7.21)
Supply of boulder M003
labour charge for pitching above water on apron and slope of bank with stone boulder duly packed (uncrated complete job & material within 150 M lead and all lifts) as per specification and direction of E/I. (7.7.18)
Supply of G.I wire of 8to 10 S.W.G All complete as per specification and direction of E/I.(SR Item no-M205)
Labour charge for making crate box of size (1.5x1.5x0.60) including weaving of wire to make of taranga wire having 100 mm to 150 mm square mesh with double knot with 8 to 10 S.W.G wire as per specificitin and direction of E/I.(7.7.32.1)
Carriage of materials by mechanical transport including loading unloading and stacking as per specification and direction of E/I. Stone boulder lead 33 Km. From Baskola
Carriage of G.I wire Lead 70 Km
Local sand Lead 03 Km.
GST @ 12% (system generated, hence no separate rate is to be quoted for this item)
Labour Cess @ 1% (system generated, hence no separate rate is to be quoted for this item)
Sri Ram Enterprises
BASUMATI CONSTRUCTION PRIVATE LIMITED
RABBANI CONSTURCTION PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .