| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC | L1 | Accepted-AOC Award of contractor | |
| 2 | L2₹1.4 L+₹25,109.52 (21.5%)Rejected-AOC NO 6 76 EAST STREET THOPPUR MADURAI 625008 | MADURAI | MADURAI | TAMIL NADU | 625008 | L2 | Rejected-AOC L2 bidder | |
| 3 | L3₹1.4 L+₹27,594.18 (23.6%)Rejected-AOC | L3 | Rejected-AOC L3 bidder |
| Sl No | Description | Qty | Unit | C RAJASEKARAN L2 | GANDHI LATHA L3 | KARUNAKARAN L1 |
|---|---|---|---|---|---|---|
| 1.00Civil works | ||||||
| 1.01 | Dismantling of PCC under 3m high including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete. | 0.2 | cum | 540 ₹108 | 200 ₹40 Lowest | 500 ₹100 |
| 1.02 | Earth work excavating for foundation ( HGS 20 B ) and depositing on bank with an initial lead of 10 m & lift of 2 m in Hard stiff clay , stiff black cotton, hard red earth , shales murram. gravel, stoney earth and earth mixed with small size boulders SS 20 B, including cost of tools and plants etc, complete. | 0.45 | cum | 144 ₹64.8 | 100 ₹45 Lowest | 180 ₹81 |
| 1.03 | Supplying and filling M sand for foundation, with well watering and consolidation as per the standard specification etc., complete. | 0.19 | cum | 1,998 ₹379.62 | 1,000 ₹190 Lowest | 1,800 ₹342 |
| 1.04 | Providing Plain Cement Concrete 1:3:6 using 40mm HBG metal for foundation and basement including cost of all materials, lead, lift, labour for laying concrete etc., | 0.15 | cum | 6,282 ₹942.3 | 4,000 ₹600 Lowest | 6,010 ₹901.5 |
| 1.05 | Providing Plain Cement Concrete 1:2:4 using 20mm HBG metal for foundation and basement including cost of all materials, lead, lift, labour for laying concrete etc., | 0.24 | cum | 7,200 ₹1,728 | 6,000 ₹1,440 Lowest | 7,000 ₹1,680 |
| 1.06 | Provision for wooden centering including cost of all materials, lead, lift, labour etc., complete. | 0.26 | sqm | 1,494 ₹388.44 | 1,000 ₹260 | 800 ₹208 Lowest |
| 1.07 | Providing 'Brick work in Cement Mortar 1:5 using II-Class burnt Bricks of size 9” x 4 3/8 x 2 3/4” including cost of all materials, leads, lifts, labour etc., complete. | 0.13 | cum | 6,750 ₹877.5 | 5,000 ₹650 Lowest | 6,000 ₹780 |
| 1.08 | Plastering with cement mortar 1:3, 10mm thick over slab area at all levels, including cost of all materials, lead, lift, labour, T&P, curing, etc., complete. | 1.15 | sqm | 3,006 ₹3,456.9 | 500 ₹575 | 280 ₹322 Lowest |
| 1.09 | Plastering with cement mortar 1:5, 12mm thick for inner & outer wall surface at all levels, including cost of all materials, lead, lift, labour, T&P, curing, etc., complete. | 0.93 | sqm | 3,006 ₹2,795.58 | 500 ₹465 | 320 ₹297.6 Lowest |
Tender Value
Refer Docs
EMD Value
₹1,354
Closing Date
23 Feb 2026, 2:00 pmClosed
SE/MEDC/METRO/MADURAI
TNEB Complex, Race Course Road, K.Pudur, Madurai - 625007
Estimate for Supplying and fixing of additional 1 No new 5HP compressor motor with construction of New Motor bed, 2 Nos PVC water tank and wiring works at TNPDCL Regional office premises, K.Pudur, Madurai.
2026_EB_652944_1
SE/MEDC/METRO/MDU - 016/2025 - 26
Open Tender
Civil Works
Works
Madurai
as in specification
2 documents required · 2 mandatory
₹0
₹1,354
Yes
3 Oct 2026
9 Feb 2026
24 Feb 2026
9 Feb 2026
23 Feb 2026
9 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil works | |||||
| 1.01 | Dismantling of PCC under 3m high including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete. | 0.2 | cum | - | - |
| 1.02 | Earth work excavating for foundation ( HGS 20 B ) and depositing on bank with an initial lead of 10 m & lift of 2 m in Hard stiff clay , stiff black cotton, hard red earth , shales murram. gravel, stoney earth and earth mixed with small size boulders SS 20 B, including cost of tools and plants etc, complete. | 0.45 | cum | - | - |
| 1.03 | Supplying and filling M sand for foundation, with well watering and consolidation as per the standard specification etc., complete. | 0.19 | cum | - | - |
| 1.04 | Providing Plain Cement Concrete 1:3:6 using 40mm HBG metal for foundation and basement including cost of all materials, lead, lift, labour for laying concrete etc., | 0.15 | cum | - | - |
| 1.05 | Providing Plain Cement Concrete 1:2:4 using 20mm HBG metal for foundation and basement including cost of all materials, lead, lift, labour for laying concrete etc., | 0.24 | cum | - | - |
| 1.06 | Provision for wooden centering including cost of all materials, lead, lift, labour etc., complete. | 0.26 | sqm | - | - |
| 1.07 | Providing 'Brick work in Cement Mortar 1:5 using II-Class burnt Bricks of size 9” x 4 3/8 x 2 3/4” including cost of all materials, leads, lifts, labour etc., complete. | 0.13 | cum | - | - |
| 1.08 | Plastering with cement mortar 1:3, 10mm thick over slab area at all levels, including cost of all materials, lead, lift, labour, T&P, curing, etc., complete. | 1.15 | sqm | - | - |
| 1.09 | Plastering with cement mortar 1:5, 12mm thick for inner & outer wall surface at all levels, including cost of all materials, lead, lift, labour, T&P, curing, etc., complete. | 0.93 | sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_782936.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .