Loading…
Loading…
Tender Value
₹4.9 L
EMD Value
₹9,800
Closing Date
27 Jul 2026, 4:00 pm2d left
Xen REW Kathua
xen
Constt of Shiv Baba Community Hall in Karroh Panchayat Karroh Block Keerian Gandyal
2026_RDPR_316131_4
116/REW/K of 2026-27 Dated 15/07/2026
Open Tender
Civil Works
Percentage
Keerian Gandyal
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹9,800
15 Jul 2026
15 Jul 2026
28 Jul 2026
15 Jul 2026
27 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth: All kinds of soil | 13.5 | cum | 479.3 | ₹6,470.55 |
| 2 | Providing and laying in position dry stone aggregarte. All work upto plinth level with (stone aggregate of 40mm nominal size ) including spreading, compacting, and consolidation in all respect | 2.35 | cum | 2,290 | ₹5,381.5 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level in 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) | 9 | cum | 4,294.89 | ₹38,654.01 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 infoundation and plinth including curing in | 8.29 | cum | - | - |
| 5 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 8.29 | cum | 1,455.65 | ₹12,067.34 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.09 | cum | 7,788.4 | ₹8,489.36 |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. | 4.5 | cum | 9,821.85 | ₹44,198.33 |
| 8 | Reinforcement of R.C.C work, incl. straightening, cutting, bending, placing in position and binding all complete | 486 | kg | 123.15 | ₹59,850.9 |
| 9 | Foundations, footings bases of columns etc. | 20.7 | sqm | 286.35 | ₹5,927.45 |
| 10 | Lintel, beams, plinth beams, girders, bressumers and cantilevers | 14.22 | sqm | 577.55 | ₹8,212.76 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.88 MB
BOQ_1029529.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].