Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical AT DILAWARPUR PO PS DIST KENDRAPARA | KENDRAPARA | KENDRAPARA | ODISHA | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical WARD NO 21 BUXIBAZAR MANGALABAG CUTTACK 753001 | CUTTACK | CUTTACK | ODISHA | 753001 | Admitted-Fee/PreQual/Technical |
Tender Value
₹4.4 Cr
EMD Value
₹4.4 L
Closing Date
7 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Construction Engineer,R.W Circle,KPD-JJP
O/o CCE,Rural Works Circle,KPD-JJP
Construction of staff Quarter 4 nos E Type at Aul Court in the district of Kendrapara for the year 2024-25_Building
2026_CERWI_144170_1
Tender Online RCK-19/26
National Competitive Bid
Civil Works - Buildings
Percentage
456 days
Kendrapara
2 documents required · 2 mandatory
₹10,000
₹4.4 L
Yes
9 Nov 2026
22 Oct 2026
9 Nov 2026
22 Oct 2026
7 Nov 2026
22 Oct 2026
22 Oct 2026 - 7 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in exavation of foundation in hard soil within initial leads of 50m & lifts of 1.5m including dressing and levelling of bed etc. and adding contractor's profit and over head charges, etc. complete in all respect | 167.18 | cum | 311.5 | ₹52,076.57 |
| 2 | Supplying & filling of foundation with course sand well watered and rammed including cost, cost of all labour, carriage, royalty complete in all respect. | 559.39 | cum | 1,455.83 | ₹8,14,376.74 |
| 3 | C.C. of proportion (1:3:6) in foundation and floors using 4cm (3/2) size Clean hard black crusher broken granite metal of approved quality from approved quarry including hosting lowering and laying in layers not exceeding 15cm (6) thick to the required level, ramming watering and curing etc complete including all cost, conveyance, taxes and royalties of materials and labour with T&P required for the work, but excluding cost of Centering and Shuttering for Mass Concrete etc complete. | 41.91 | cum | 7,360.22 | ₹3,08,466.82 |
| 4 | Providing & erecting necessary plants, equipments and labour for boring holes and casting of 375 mm dia bored cast-in-situ Double under reammed RCC piles of 15.0 mtr length below the finished Stilt level as per drawing or as directed by the Engineer-in-charge for all piles with RCC M30 grade desgin mix concrete and rate shall include supply and cost of all materials such as stone chips, sand, cement and bentonite with all leads and lifts of materials but excluding the cost of reinforcement and the cost of boring holes for piles shall be included in the unit rate of piles. | 2,250 | rm | 1,768.26 | ₹39,78,573.98 |
| 5 | Providing fly ash brick masonary using fly ash.bricks in cement mortar(1:6) after immersing bricks for six hours in water before use in superstructure using fly ash bricks of 9" size having a crushing strength of not less than 50kg/sqm including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curring etc.complete including cost and conveyance of all materials and labour and T&P required for the work etc.complete. In Foundation | 14.97 | cum | 5,862.31 | ₹87,758.78 |
| 6 | In Super Structure
Stilt Floor | 41.28 | cum | 5,900.63 | ₹2,43,578.01 |
| 7 | First Floor | 223.43 | cum | 6,286.6 | ₹14,04,614.21 |
| 8 | R.C.C. M-25 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, centering shuttering etc complete but excluding cost of reinforcement. Rcc in Footing or Pile Cap | 89.67 | cum | 8,077.3 | ₹7,24,291.49 |
| 9 | Rcc in Plinth Beam | 30.96 | cum | 9,163.13 | ₹2,83,690.5 |
| 10 | Rcc in Column Stilt Floor | 19.73 | cum | 20,110.97 | ₹3,96,789.44 |
stage.html
html • 0.04 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 5.22 MB
Tendernotice_1.pdf
PDF • 3.91 MB
BOQ_615248.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .