Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.8 LAdmitted-Finance | ₹54.8 L | L1 | Admitted-Finance |
| 2 | L2₹67.7 LAdmitted-Finance | ₹67.7 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
| Sl No | Description | Qty | Unit | M/S Bhawani Electricals L1 | SOLAR WINGS TECHNOLOGIES L2 |
|---|---|---|---|---|---|
| 1.00 | Foundation for installation of 20 Mtr. High Mast- as per the foundation drawing furnished by original equipment manufacture (OEM) of high mast. | 1 | Job | 10,000 ₹10,000 Lowest | 45,000 ₹45,000 |
| 2.00 | Safety & Security,operation and maintenance of the street light system during DLP with O&M of 3 yrs of the whole system.if failed, the fixture must be repaired within 3 days of fault, failing which penalty i.e. two times of the maintenance charges estimated by the department for each fixture for the month shall be deducted & recovered from the agency. (Note- Min. Rs. 100/- per job will be held on account of O&M).Here 1 JOB is defined as per point per month | 3,816 | Job | 60 ₹2,28,960 Lowest | 100 ₹3,81,600 |
| 3.00 | Buy back of existing old poles,panels,lights etc | 40 | Job | 500 ₹-20,000 Lowest | 500 ₹-20,000 Lowest |
Tender Value
₹82.6 L
EMD Value
₹1.7 L
Closing Date
29 Apr 2026, 6:00 pmClosed
Unit Head
RIICO AJMER
Upgradation of street light system and providing and fixing of high mast light at industrial area Sarwar, amounting to Rs. 82.57 lakh
2026_RIICO_552517_1
2026/Ajmer/39100/1136
Open Tender
Electrical Works
Percentage
180 days
Sarwar
please refer tender documents
5 documents required · 5 mandatory
₹2,360
Through SSO ID of Contractor
₹1.7 L
13 May 2026
18 Apr 2026
30 Apr 2026
20 Apr 2026
29 Apr 2026
20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Foundation for installation of 20 Mtr. High Mast- as per the foundation drawing furnished by original equipment manufacture (OEM) of high mast. | - | Job | - | - |
| 2 | Safety & Security,operation and maintenance of the street light system during DLP with O&M of 3 yrs of the whole system.if failed, the fixture must be repaired within 3 days of fault, failing which penalty i.e. two times of the maintenance charges estimated by the department for each fixture for the month shall be deducted & recovered from the agency. (Note- Min. Rs. 100/- per job will be held on account of O&M).Here 1 JOB is defined as per point per month | - | Job | - | - |
| 3 | Buy back of existing old poles,panels,lights etc | - | Job | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
TDsarwar.pdf
Tender Documents • 0.19 MB
BOQ_984551.xls
BOQ • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].