| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Successful₹52.1 LAccepted-AOC ITAMATI NAYAGARH NAYAGARH | NAYAGARH | ODISHA | 752024 | ₹52.1 L | Successful | Accepted-AOC Successful bidder Debasish Mohanty B Class Contractor Stands is 1st Lowest. |
| 2 | Unccessful₹52.1 LRejected-Finance AT GIRANS PO KUWAD PS NALCO NASAAR DIST ANGEL PIN 759145 ODISHA | ANUGUL | ODISHA | 759145 | ₹52.1 L | Unccessful | Rejected-Finance Unccessful bidder |
| 3 | Unccessful₹52.1 LRejected-Finance | ₹52.1 L | Unccessful | Rejected-Finance Unccessful bidder |
| 4 | Unccessful₹52.1 LRejected-Finance C O SUKANTA PATRA AT GHOTAKPADAR PO MUNDIGARH PS TUMUDIBANDHA DIST KANDHAMAL ODISHA PIN 762107 | MUNDIGARH | KANDHAMAL | ODISHA | 762107 | ₹52.1 L | Unccessful | Rejected-Finance Unccessful bidder |
| 5 | Unccessful₹52.1 LRejected-Finance AT WARD NO 11 PO GOSANINUAGAON P S GOSANINUAGAON DIST GANJAM ODISHA PIN 760002 | GOSANINUAGAON | GANJAM | ODISHA | 760002 | ₹52.1 L | Unccessful | Rejected-Finance Unccessful bidder |
Updated dates
Tender Value
₹61.3 L
EMD Value
₹61,250
Closing Date
11 Dec 2025, 5:00 pmClosed
Executive Engineer, Rural Works Division, Balligu
Executive Engineer, Rural Works Division, Balliguda
Construction of road from RD Road to Sindiponkal under CRPF Camp in the District of Kandhamal for the year 2025-26
2025_CERWI_122311_2
Online Tender- 13/EERWDBLG/2025-26
National Competitive Bid
Civil Works - Roads
120 days
EE RWD Balliguda, Kandhamal
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹61,250
Yes
21 Feb 2026
2 Dec 2025
12 Dec 2025
2 Dec 2025
11 Dec 2025
2 Dec 2025
2 Dec 2025 - 10 Dec 2025
Clearing and grubbing the road land including uprooting Rank vegetationgras bushes shrubs etc. Complete
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechancial means within a lead of 5Kms, spreading, grading to required slope and compaction to meet requirement of table 300-2 & Clause 305 of MOSRT&H Specifications for road & Bridges work etc. Complete
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (Excluding cost of excavation and transportion to site).
Providing & laying Granular Sub-Base in layers not excding 225 mm watering and compactin ot required density in OMC with Vibratory Roller including hire and running charges of VRR etc. complete.
Providing laying spreading and compacting stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheeled steel roller 8-10 tonnes in stages to proper grade and chamber, applying and brooming requisite type of screening/binding aggregate, watering and compacting to the required density as per clause 404 of MoSRT&H specificarions for road & Bridge works etc. complete.
Construction of un-reinforced, plain cement concrete pavement over a prepared sub-base with 43 grade cement @400kg per cum, coarse and fine aggregate conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in abatching and mixing plant as per approved mix design, transported to site, laid with afixed form or slip form paver, spread compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint debonding strip, dowl bar, tie rod, admixtures, as per drawing and as per clause 602 of MOSRT&H Specifications for Road & Bridges work etc. complete
Road Signage
Fixing of road cautionary Sign
600mm equilateral triangle
600mm Circular
Protection Work With Tow Wall
Filling sand supplying & filling good clean river sand of approvaed qulity including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Eingineer in charge.
Plain cement concrete M-15 grade in Foundation complete as per drawing and technical as per specification & direction of Eingineer in charge.
Providing weep holes is Brick Masonry/Paln/Rainforced concrete abutment, wing wall/ return wall with 100mm dia AC pipe, extending through the full width of the structure wirh slope of IV:2H towards force etc. complete as per specification & direction of Eingineer in charge.
Concretet Drain
Earth work in excavation of foundation in hard soil within the initial lead & lift including dressing & levelling the bed & depositiong the excatated earth away from the site etc. all complete as per the direction of Engineer in Charge.
Filling san supplying & filling good clean river sand of approvaed qulity including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Eingineer in charge.
Plain cement concrete M-15 grade in Foundation complete as per drawing and technical as per specification & direction of Eingineer in charge.
Plain cement concrete M-15 grade in Sub-Structure complete as per drawing and technical as per specification & direction of Eingineer in charge.
Plain Cement Concret PCC M20 nominal mix in levelling course bwlow open foundation of Head walls as per drawings & Technical Specification as per specification & direction of Eingineer in charge.
Cross Drainage Work
Earth work in excavation of fondation in hard soil within the initial lead & lift including dressing & levelling the bed & depositiong the excavated earth away from the site etc. all complete as per the direction of Engineer in Charge.
Filling sand- supplying & filling good clean river sand of approvaed qulity including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Eingineer in charge.
Plain cement concrete M-15 grade in Foundation complete as per drawing and technical as per specification & direction of Eingineer in charge.
Plain cement concrete M-15 grade in Sub-Structure complete as per drawing and technical as per specification & direction of Eingineer in charge.
Maintenance Of Road
Restoration of rain cuts with soil, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MORD technical specifications Clause 1902 by manual means as per direction of the Engineer in charge (Quantity /Km 2x1000x1.125x0.30=675.00Cum)
1st year Take 0.6% of the area
2nd year 33% excess over 1st year
3rd year 67% excess over 1st year
4th year 100% excess over 1st year
5th year 133% excess over 1st year
1st year Take 0.6% of the area
2nd year 33% excess over 1st year
3rd year 67% excess over 1st year
4th year 100% excess over 1st year
5th year 133% excess over 1st year
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903. (Area/Km 2x1000x1.125=2250.00Sqm)
1st year Take 0.6% of the area
2nd year 33% excess over 1st year
3rd year 67% excess over 1st year
4th year 100% excess over 1st year
5th year 133% excess over 1st year
Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908 of MORD and as per direction of the Engineer in charge.
1st year
2nd year
3rd year
4th year
5th year
Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 of MORD as per direction of the Engineer in charge.
1st year
2nd year
3rd year
4th year
5th year
Maintatenace of 200m km stone by way of refting of tilted stones repairs with cement mortar cleaning repairing and lettering on 200m km stone and 5th km stone as per drawing and technical specification clause 1912
1st year
2nd year
3rd year
4th year
5th year
Cutting of branches of trees from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in
1st year
2nd year
3rd year
4th year
5th year
Cutting of shurb from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.
1st year
2nd year
3rd year
4th year
5th year
Triming of grass and weeds from the shoulder/berms and disposal the same to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge
1st year
2nd year
3rd year
4th year
5th year
White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per MORD technical specifications Clause 1915 as per direction of the Engineer in charge.
1st year
2nd year
3rd year
4th year
5th year
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.53 MB
BOQ_568575.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid