Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹42,000
Closing Date
12 Jul 2023, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (VP) MELUR
PANCHAYAT UNION OFFICE MELUR
Madurai Distirct_Melur Block_ KURUCHIAPTTI Panchayat_Package no-AGAMT/P06
2023_RDTN_338715_1
MEL/AGAMT23-24/06
Open Tender
Civil Works
Item Rate
60 days
Melur
Refer Tender document
3 documents required · 3 mandatory
₹0
₹42,000
13 Jul 2023
8 Jul 2023
13 Jul 2023
8 Jul 2023
12 Jul 2023
9 Jul 2023
Amount
MAIN POND
Clearing and removing Light jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
RETAINING WALL
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and erection centering for sides and soffits including necessary supports and for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
BATHING GHAT
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and as per SS20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as Slab,Lintel,Beam colum,sunshade etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
MAIN POND
Clearing and removing Light jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
RETAINING WALL
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and erection centering for sides and soffits including necessary supports and for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
BATHING GHAT
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and as per SS20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as Slab,Lintel,Beam colum,sunshade etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Earthwork excavation in all clauses of soil except hard which recurring blastering with initial lead and lift including shorring struttion Baling out water etc., complete for Foundation.
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Centering and Shuttering charges including all labour charges etc., complete.
Cement concrete in cm 1:3:6 mix using 20 mm ISS HGB including cost and conveyance of material at site and all labour charges including curring etc., compelled.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete250mm thick with pavers in SubBase/Base course and all other incidental charges etc., complete.
Earthwork excavation in all clauses of soil except hard which recurring blastering with initial lead and lift including shorring struttion Baling out water etc., complete for Foundation.
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Centering and Shuttering charges including all labour charges etc., complete.
Cement concrete in cm 1:3:6 mix using 20 mm ISS HGB including cost and conveyance of material at site and all labour charges including curring etc., compelled.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete250mm thick with pavers in SubBase/Base course and all other incidental charges etc., complete.
Earthwork excavation in all clauses of soil except hard which recurring blastering with initial lead and lift including shorring struttion Baling out water etc., complete for Foundation.
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Centering and Shuttering charges including all labour charges etc., complete.
Cement concrete in cm 1:3:6 mix using 20 mm ISS HGB including cost and conveyance of material at site and all labour charges including curring etc., compelled.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete250mm thick with pavers in SubBase/Base course and all other incidental charges etc., complete.
Earthwork excavation in all clauses of soil except hard which recurring blastering with initial lead and lift including shorring struttion Baling out water etc., complete for Foundation.
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Centering and Shuttering charges including all labour charges etc., complete.
Cement concrete in cm 1:3:6 mix using 20 mm ISS HGB including cost and conveyance of material at site and all labour charges including curring etc., compelled.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete250mm thick with pavers in SubBase/Base course and all other incidental charges etc., complete.
Earthwork excavation in all clauses of soil except hard which recurring blastering with initial lead and lift including shorring struttion Baling out water etc., complete for Foundation.
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Centering and Shuttering charges including all labour charges etc., complete.
Cement concrete in cm 1:3:6 mix using 20 mm ISS HGB including cost and conveyance of material at site and all labour charges including curring etc., compelled.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course and all other incidental charges etc., complete.
Supplying and laying inter locking paver block of 80 mm thick of required shap in cement mortar 1:1:2 using 10-12 mm size HBG stone jelly including cost of centering shuttering laying vibrating ( with mechnical vibrating ) finishing curing land the cost include transporting charges etc ., complete250mm thick with pavers in SubBase/Base course and all other incidental charges etc., complete.
Earth work excavation in all clauses of soil except hard rock with initial lead and lift for Foundation etc., complete as per SS 20 B
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Brick work in CM1:5 mix using country bricks including cost and conveyance of all materials at site and labour charges etc. complete.
Plastering in CM 1:5 mix to 12mm including cost and conveyance of etc. complete.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thickcomplete.
Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2 -10Sqm
Supplying and painting the walls with two coats of Distembering over one coat of Cement primer as instructed by the department officers including preparation of surface curing For basic one coat of primer with CEMENT PAINT
Supplying and fixing colour galvalume sheet roof of 0.47mm
Weathering course concrete using 20mm broken brick jelly in pure slacked lime complete.
Finishing the top of roof with one course of Machine pressed tiles of size 23x23x2cm in 1:3 12mm thick complete.
Cost and Supply of hand Rail for Ramp 40mm GI
Cost and Supply of New Steel Door size of (0.75 x 1.80)
Cost and Supply of New Steel Door size of (0.90 x 2.10)
wash Basin arrangements
Cost and Supply of RCC Ring (min 25mm tk) with cover slab 50mm tk
Cost and Supply of IWSC
500 Litr Sintex
Cost and Supply of RCC Jolly
Cost and Supply of Water supply
Cost and Supply of sanitary arrangements
Earth work excavation in all clauses of soil except hard rock with initial lead and lift for Foundation etc., complete as per SS 20 B
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. completei
Plain cement concrete 1 : 4 : 8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Plain cement concrete 1 : 3 :6 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. complying with standard specifications.
Supplying and erection centering for sides and soffits inculding necessary etc complete.,
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Collcetion and laying well gravel from the Nearest aavailble source to the rod side including cost and conveyance etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K RANJITHKUMAR
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .