| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC | ₹7.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.3 LRejected-AOC | ₹7.3 L | L2 | Rejected-AOC L2 |
| 3 | L3₹7.3 LRejected-AOC | ₹7.3 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | KARUPPAIAH P L2 | Thillainatarajan M L3 | M VIJEYARAMAN L1 |
|---|---|---|---|---|---|---|
| 1.01 | Charges for putting bore hole of size 23 cm of pile foundation up to hard stage of sand clay other bulb rate to fix all labour charges for boxing hire charges for boring set and all other T&P employed etc, complete. | 18 | m | 413.6 ₹7,444.80 | 440 ₹7,920 | 396.1 ₹7,129.80 |
| 2.01 | Earth work excavation for foundation in Hard stiffclay, stiff black cotton, hard red earth, shales murram,gravel,stoney earth and earth mixed with small sizeboulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil,sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc., complete 10 cum. The Rate inclusive of all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications. | 1.91 | M3 | 272.75 ₹520.95 | 290.16 ₹554.21 | 261.2 ₹498.89 |
| 3.01 | Sand filling for fountations & basement in layers of not more than15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 2.97 | M3 | 635.2 ₹1,886.54 | 675.75 ₹2,006.98 | 608.3 ₹1,806.65 |
| 4.01 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. | 1.97 | M3 | 6,104.97 ₹12,026.79 | 6,444.65 ₹12,695.96 | 5,846.5 ₹11,517.60 |
| 5.01 | Brick work in CM 1:3 (one cement & five sand) using III class country bricks of size 8 3/4"X41/4"X 2 1/4 " including finishing, curing, etc., complete complyingwith standard specification - 100CFT (For foundation & basement) | 2.87 | M3 | 8,049.41 ₹23,101.81 | 8,563.21 ₹24,576.41 | 7,708.6 ₹22,123.68 |
| 6.01 | Brick work in CM 1:5 (one cement & five sand) using II class ground moulded bricks of size 9"X43/8"X23/4" including finishing, curing, etc.,complete complying with standard specification - 100CFT (For G.F.) | 12.25 | M3 | 8,145.44 ₹99,781.64 | 8,665.37 ₹1.1 L | 7,800.6 ₹95,557.35 |
| 7.01 | Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides) Si No.82 | 5.71 | M2 | 106.04 ₹605.49 | 112.81 ₹644.15 | 101.6 ₹580.14 |
| 8.01 | Supplying, erecting with necessary supports for plain surface such as RCC Boxing side slab and silmilar RCC slab with all cross bracing etc., complete in all floors of any height ( the retrived materials ) should be taken back by the contractor the payment for cenetering shall be given after the concrete is laid ( Vertical portion ) 10m² etc., complete..Si No.325 | 17 | M2 | 1,115.62 ₹18,965.54 | 1,186.83 ₹20,176.11 | 1,068.4 ₹18,162.80 |
| 9.01 | Supplying, erecting STEEL CENTERING for sides and
soffits inc supports and strutting for plain surface such
an reinforced cement concrete slasp rectangualar
beams tee or el beams lintels , bed blocks staircase in
all floors of any height (the retrived materials should
be taken back by the contractor) the payment for
cenetering shall be given by the concrete is laid .SI No.307 | 28.85 | M2 | 1,088.27 ₹31,396.59 | 1,157.74 ₹33,400.80 | 1,042.2 ₹30,067.47 |
| 10.01 | Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete in F&B | 13.06 | M3 | 9,375.09 ₹1.2 L | 9,973.5 ₹1.3 L | 8,978.1 ₹1.2 L |
Tender Value
₹7.7 L
EMD Value
₹7,749
Closing Date
29 Jan 2026, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai , Thallakulam , Madurai
Construction of New Ration Shop Building at Kajimar Street in Ward No.54.
2026_MAWS_645134_1
Z3 / E7 / Est.309 / 25-26 (MP)
Open Tender
Civil Works
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹7,749
17 Feb 2026
22 Jan 2026
29 Jan 2026
22 Jan 2026
29 Jan 2026
22 Jan 2026
Charges for putting bore hole of size 23 cm of pile foundation up to hard stage of sand clay other bulb rate to fix all labour charges for boxing hire charges for boring set and all other T&P employed etc, complete.
Earth work excavation for foundation in Hard stiffclay, stiff black cotton, hard red earth, shales murram,gravel,stoney earth and earth mixed with small sizeboulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil,sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc., complete 10 cum. The Rate inclusive of all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications.
Sand filling for fountations & basement in layers of not more than15cm.thick well rammed watered and compacted etc., complete complying with standard specification.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete.
Brick work in CM 1:3 (one cement & five sand) using III class country bricks of size 8 3/4"X41/4"X 2 1/4 " including finishing, curing, etc., complete complyingwith standard specification - 100CFT (For foundation & basement)
Brick work in CM 1:5 (one cement & five sand) using II class ground moulded bricks of size 9"X43/8"X23/4" including finishing, curing, etc.,complete complying with standard specification - 100CFT (For G.F.)
Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides) Si No.82
Supplying, erecting with necessary supports for plain surface such as RCC Boxing side slab and silmilar RCC slab with all cross bracing etc., complete in all floors of any height ( the retrived materials ) should be taken back by the contractor the payment for cenetering shall be given after the concrete is laid ( Vertical portion ) 10m² etc., complete..Si No.325
Supplying, erecting STEEL CENTERING for sides and soffits inc supports and strutting for plain surface such an reinforced cement concrete slasp rectangualar beams tee or el beams lintels , bed blocks staircase in all floors of any height (the retrived materials should be taken back by the contractor) the payment for cenetering shall be given by the concrete is laid .SI No.307
Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete in F&B
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia
Plastering with CM1:5(one cement and five sand)12mm thick10m2. SI.NO.27
Plastering with CM1:3(one cement and three sand) 10mm thick10m2.SI.NO.51
Finishing the top of floor with Granolithic Finish with CC 1: 2: 4 (one cement, two sand & four HBG jelly) using chips of grade 10 mm and below for 25mm thickness and rubbed smooth etc, complete as per standard specification (20 mm Thick)
Supply andand Delivery Fabrication of MS doors and windows with outer frame and shutter frame in MS angle of size 40mm x 40mm x 6mm with MS flat 25mm x 25mm x 6mm and MS sheet of 18 gauge including ventilating arrangemets using 20mm squre MS rods with locking arrangements including two coats of approved enamel paint over coat of red oxide including cost of angles,plates,sheets,fabrication charges, cost of hold fast and transportation charges etc.,complete
Labour charges for over head wiring from EB pole to pumproom by fixing 32mm dia GI pipe to the required height over roof slab of pumproom and as directed by EB authorities including fixing M.S. clamp set, U.Kondi, 7/20 GI wire, 7/20 PVC insulated copper wire reels, T.W. meter board, aerial board, earth plate GI Bolt of nuts, PVC Hose fuse wiring etc. complete
Wiring with 2x1.50 sq.mm PVC unheated SC Aluminium cable of 1100 V grade in suitable PVC rigid pipes in wall or ceiling with PVC accessories with TW switch box in flush with wall covered by hylum sheet3mm thick and painting with suitable colour of 14 SWG TC wire for light point.
Supplying and fixing of 48” AC ceiling fan with 300mm down rod on the existing clamp with regulator with complete set TWAD-DATA-P- 56" Ceiling Fan High Speed (Without regulator) Higher End Each
Supply and Fixing for 20W 4 Feet LED fitting with LED including labour Charges Etc Complete
White washing two coats with best lime stone including gum and cungee water etc. complete 10m2 SI No.338 rate for 10m2.
Painting two coats with ready mixed Plastic Emulsion Paint approved quality and colour over a priming coat , including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc,complete as per standard specification. - 10 sq.m
Letter writing for Name Boards on Wall Surface Rates including of Paints and Labour Charges etc., complete
Add GST 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Doc.pdf
Tender Documents • 0.83 MB
BOQ_773122.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid