Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24,786.69Admitted-Finance 208 L MODEL TOWN LUDHIANA | LUDHIANA | LUDHIANA | PUNJAB | -1.91% | ₹24,786.69 | L1 | Admitted-Finance |
| 2 | L2₹28,799.46+₹4,012.77 (16.2%)Admitted-Finance | +13.97% | ₹28,799.46+₹4,012.77 (16.2%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 1849 JUGRAJPUR SACHENDI KANPUR KANPUR NAGAR UTTAR PRADESH 208023 UDYAM UP 43 0012110 | KANPUR NAGAR | UTTAR PRADESH | 208023 | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹11.8 L
EMD Value
₹23,620
Closing Date
25 Jul 2026, 6:00 pmClosed
Commissioner,
Nagar Nigam Bikaner.
Construction work of jungla at ward no. 52 and repair work of room inside nigam office.
2026_DLB_575199_1
E-NIT No. 46/2026-27/Nirman w52
Open Tender
Civil Works
Percentage
60 days
Bikaner
as per tender
2 documents required · 2 mandatory
₹1,000
MDRISL Jaipur and Commissioner NNB
₹23,620
Yes
17 Aug 2026
15 Jul 2026
27 Jul 2026
15 Jul 2026
25 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Earth Lead 5 KM | 1 | Cum | 254.76 | ₹254.76 |
| 2 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Sand, bazri, ballast, kankar for lead 5KM | 1 | Cum | 203.81 | ₹203.81 |
| 3 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Stone, Bouldrs, gravelly matarials | 1 | Cum | 239.78 | ₹239.78 |
| 4 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Bricks | 1 | Per 1000 Nos. | 543.49 | ₹543.49 |
| 5 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Bricks Tiles | 1 | Per 1000 Nos | 326.09 | ₹326.09 |
| 6 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Lime Concrete, cement concrete grade M-10 (1:5:10) and below | 1 | Cum | 393.5 | ₹393.5 |
| 7 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Cement Concrete Grade M-15 and above and PCC blocks | 1 | Cum | 678 | ₹678 |
| 8 | Dismantling Brick/Tile work in Lime mortar | 1 | Cum | 275.5 | ₹275.5 |
| 9 | Dismantling Brick/Tile work in Cement mortar | 1 | Cum | 394.5 | ₹394.5 |
| 10 | Dismantling Stone Masonry Rubble stone masonry in Lime Mortar | 1 | Cum | 327 | ₹327 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.65 MB
nit46golpark.pdf
Tender Documents • 4.64 MB
BOQ_1022940.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .