Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.0 LAccepted-AOC | L1 | Accepted-AOC Due to L1 | |
| 2 | L2₹24.9 L+₹40,291 (1.64%)Rejected-Finance | L2 | Rejected-Finance Quoted rate more than L1 | |
| 3 | L3₹26.7 L+₹2.1 L (8.74%)Rejected-Finance | L3 | Rejected-Finance Quoted rate more than L1 | |
| 4 | L4₹26.7 L+₹2.2 L (8.86%)Rejected-Finance | L4 | Rejected-Finance Quoted rate more than L1 | |
| 5 | L5₹26.9 L+₹2.3 L (9.44%)Rejected-Finance | L5 | Rejected-Finance Quoted rate more than L1 |
| Sl No | Description | Qty | Unit | M/s Dimpy Enterprises L1 | M/S AK SINGH L6 | M/S SANTOSHI TRADERS L8 | M/S BARUA REFRIGERATION WORKS L9 | THE SUPPLY AGENCY L7 | A M CHOUDHURY AND CO L3 | Chief Builders &Consultants L2 | 4S ASSOCIATES L4 | M/S BARUAH ELECTRICALS L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00NOTE:- (i) The bidders/contractors are advised to read tender document & all corrigendum / amendments and General conditions of contracts before entrying/quoting the rates. (ii) It is highlighted that the certain condition of General Condition of Contracts (IAFW-2249) has been modified as per direction of MoD i.e. inclusssion of Performance Security, deletion of Risk & Cost Provisions and increase in defect liability period all as per tender documents. The tenderers should keep in mind while quoting their offer. (iii) (Applicable for all items/parts):- The bidders/contractors are advised to refer Notes on BOQ/SCH'A' before entry/quoting the rates. | ||||||||||||
| 1.00 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed. | 3.57 | Cum | 600 ₹2,142 Lowest | 1,250 ₹4,462.5 | 1,283 ₹4,580.31 | 1,260 ₹4,498.2 | 950 ₹3,391.5 | 1,200 ₹4,284 | 750 ₹2,677.5 | 750 ₹2,677.5 | 810 ₹2,891.7 |
| 2.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | 75.75 | Sqm | 200 ₹15,150 | 120 ₹9,090 | 128 ₹9,696 | 130 ₹9,847.5 | 125 ₹9,468.75 | 110 ₹8,332.5 | 75 ₹5,681.25 Lowest | 96 ₹7,272 | 88 ₹6,666 |
| 3.00 | Dismantling plain or corrugated steel sheeting, any gauge, thickness including Nainital or similar pattern roof covering complete all as specified and as directed. | 595 | Sqm | 40 ₹23,800 Lowest | 85 ₹50,575 | 82 ₹48,790 | 80 ₹47,600 | 80 ₹47,600 | 78 ₹46,410 | 65 ₹38,675 | 50 ₹29,750 | 70 ₹41,650 |
| 4.00 | Dismantling Wall and ceiling boards (fibre,pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness, including cover fillets complete all as specified and as directed. | 60.5 | Sqm | 50 ₹3,025 Lowest | 65 ₹3,932.5 | 65 ₹3,932.5 | 67 ₹4,053.5 | 65 ₹3,932.5 | 60 ₹3,630 | 65 ₹3,932.5 | 65 ₹3,932.5 | 73 ₹4,416.5 |
| 5.00 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for Key, scrubbing down with water etc. complete all as specified and as directed. | 388.85 | Sqm | 80 ₹31,108 | 65 ₹25,275.25 | 70 ₹27,219.5 | 75 ₹29,163.75 | 70 ₹27,219.5 | 85 ₹33,052.25 | 55 ₹21,386.75 Lowest | 73 ₹28,386.05 | 64 ₹24,886.4 |
| 6.00 | Demolition of cement concrete of (unreinforced) any description and any position not otherwise specifically provided for and removal of rubbish from the site complete all as specified and as directed. | 42.53 | Cum | 1,300 ₹55,289 | 1,500 ₹63,795 | 1,277 ₹54,310.81 | 1,300 ₹55,289 | 1,250 ₹53,162.5 | 1,200 ₹51,036 Lowest | 1,350 ₹57,415.5 | 1,280 ₹54,438.4 | 1,280 ₹54,438.4 |
| 7.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for and segregating serviceable materials and keeping for reuse at site and removing unserviceable materials from site of work complete all as specified and as directed. | 3.5 | Qtl | 500 ₹1,750 Lowest | 650 ₹2,275 | 705 ₹2,467.5 | 700 ₹2,450 | 700 ₹2,450 | 650 ₹2,275 | 651 ₹2,278.5 | 680 ₹2,380 | 745 ₹2,607.5 |
| 8.00 | Material and labour for plain cement concrete 1:2:4 type B0 (using 12.5mm graded crushed stone aggregate) as in roof kerb or mud stops, rounded or chamfered on edges complete all as specified and as directed. | 42.53 | Cum | 10,000 ₹4,25,300 Lowest | 12,000 ₹5,10,360 | 12,205 ₹5,19,078.65 | 12,000 ₹5,10,360 | 11,100 ₹4,72,083 | 11,000 ₹4,67,830 | 11,000 ₹4,67,830 | 12,000 ₹5,10,360 | 11,250 ₹4,78,462.5 |
| 9.00 | Material and labour for brick work with sub class `B` bricks, old size, straight or curved on plan exceeding 6m mean radius built in cement mortar (1:6) complete all as specified and as directed. | 3.57 | Cum | 9,000 ₹32,130 Lowest | 11,200 ₹39,984 | 11,309 ₹40,373.13 | 11,250 ₹40,162.5 | 11,050 ₹39,448.5 | 10,850 ₹38,734.5 | 10,700 ₹38,199 | 11,300 ₹40,341 | 10,950 ₹39,091.5 |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
17 Jun 2026, 6:00 pmClosed
GARRISON ENGINEER JORHAT
GARRISON ENGINEER JORHAT
REPAIR TO LEKAGE/SEEPAGE AND ASSOCIATED WORKS AT SARAIBARI UNDER GE JORHAT.
2026_MES_768329_1
8329/GE/E8
Open Tender
Civil Works
Item Rate
180 days
GE JORHAT
As Per NIT
7 documents required · 7 mandatory
₹500
Yes
GARRISON ENGINEER JORHAT
₹50,000
Yes
9 Aug 2026
27 May 2026
19 Jun 2026
27 May 2026
17 Jun 2026
10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed. | 3.57 | Cum | - | - |
| 2 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | 75.75 | Sqm | - | - |
| 3 | Dismantling plain or corrugated steel sheeting, any gauge, thickness including Nainital or similar pattern roof covering complete all as specified and as directed. | 595 | Sqm | - | - |
| 4 | Dismantling Wall and ceiling boards (fibre,pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness, including cover fillets complete all as specified and as directed. | 60.5 | Sqm | - | - |
| 5 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for Key, scrubbing down with water etc. complete all as specified and as directed. | 388.85 | Sqm | - | - |
| 6 | Demolition of cement concrete of (unreinforced) any description and any position not otherwise specifically provided for and removal of rubbish from the site complete all as specified and as directed. | 42.53 | Cum | - | - |
| 7 | Dismantling wrought iron or mild steel work of any description not otherwise provided for and segregating serviceable materials and keeping for reuse at site and removing unserviceable materials from site of work complete all as specified and as directed. | 3.5 | Qtl | - | - |
| 8 | Material and labour for plain cement concrete 1:2:4 type B0 (using 12.5mm graded crushed stone aggregate) as in roof kerb or mud stops, rounded or chamfered on edges complete all as specified and as directed. | 42.53 | Cum | - | - |
| 9 | Material and labour for brick work with sub class `B` bricks, old size, straight or curved on plan exceeding 6m mean radius built in cement mortar (1:6) complete all as specified and as directed. | 3.57 | Cum | - | - |
| 10 | Supply and fixing steel work in tubular trusses i.e truss bottom, top bend, sides, side supports, holding plates, posts and base plate etc. including special shaped washers etc complete using ERW or induction butt welded tubes conforming to IS 1161-1998 grade St-240 etc complete all as specified and as directed. | 350 | Kg | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Tender_8329_1_CONTENT_TO_NOTE_8329.pdf
Tender Documents • 0.69 MB
Tender_8329_2_General_Condition_8329.pdf
Tender Documents • 0.78 MB
Tender_8329_3_Spl_Con_8329.pdf
Tender Documents • 0.37 MB
Tender_8329_4_PS_8329.pdf
Tender Documents • 1.49 MB
BOQ_860425.xls
BOQ • 6.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .