Loading…
Loading…
Tender Value
₹13.0 L
EMD Value
₹25,905
Closing Date
15 Jun 2026, 6:00 pm
EE ,WS
4, MG ROAD
Improvement of water supply by New Laying of 110 mm dia and 160 mm dia HDPE pipes by providing Valves and allied works with Road restoration at 93/6, Khetra Banerjee Lane
2026_MAD_1025646_3
WB-HMC/TN/ED/WS/01/26-27
Open Tender
CIVIL WORKS
30 days
HMC AREA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹25,905
Yes
29 May 2026
29 May 2026
18 Jun 2026
29 May 2026
15 Jun 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of trial pit (3.0 m x 1.0 m x (upto) 3.0 m) for fixing of pumping main, washout line raking every detection against damage of S.W. pipe line electrical cable etc. as underground obstruction including 37.5 mm timber shuttering, earth cutting, dewatering, barricading and back filling etc. as per directionj of E-I-C
Ref:- UD & MAD (Schedule) 2018, P-2, it. No. - 1.4 | 5 | Each | 1,867 | ₹9,335 |
| 2 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
In ground floor including roof.
a) upto 150 mm. Thick
Ref: P.W.D (Bldg) Sch. -2017, page -10 It- 2(a) | 53 | Cu.M. | 939 | ₹49,767 |
| 3 | Hire and labour charges for 75 mm dia bamboo railing on Jhau/Eucalyptus or other approved timber\bamboo posts 1.4 m above G.L and 0.60 m below G.L including tying strongly with coir ropes and boring holes for posts in any soil/ concrete surface/Bituminious surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer in charge after removing the barricade.(Cost of restoration would be paid seperately.)
(a)75mm. dia bamboo railing & 125mm. Dia Jhau/Eucalyptus/other
approved timber posts @ 1.60m apart
(ii) Railing with 3 rows.
Ref:- UD & MAD (Schedule) 2018, P-3, it - 1.8(a)(ii) | 100 | M | 49 | ₹4,900 |
| 4 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).
(a) Depth upto 1.5 m.
Ref:- UD & MAD (Schedule) 2018, P-3, it - 1.6(a). | 100 | Sq. M | 386 | ₹38,600 |
| 5 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (Payment to be made on measurement of finished quantity)
Ref:-[Page:2; Item No:4(A) of PWD-SOR(Bld) 2017] | 58 | % Cu.M. | 711.81 | ₹41,284.98 |
| 6 | Supplying HDPE (Materials grade PE-100) pipes conforming to IS 4984- 1995 with latest revision & amendments if any with necessary HDPE specials (excluding cost of CIDF valves) including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder,road sub-grade and aits flank but excluding moorum laterite or sand stone / hard rock cutting with chisel required including cutting road flank/ brick pavement etc. without damaging the exisiting telephone/electrical cable line etc.(in case of damage of any type of cable line by the agency at the time of execution necessary damage charge as applicable by the respective authority will have to be brone by the agency at his own cost)upto the depth (av.) so as to maintain 1.10m.earth cushion from top of the pipe upto G.L. including loading unloading carrying lowering laying fitting fixing carefully pipes, valves and specials with the all types of jointing materials in trenches maintaining proper levels and alignment jointing the pipes and specials by butt welding/ adopting suitable method (But weld jointing with help of hydraulic tack and trimming machines, Hitter etc. for reaching at necessary melting point of HDPE pipe so that joint can be monolithic) so as to facilitate the maintenance of pipe line locally as per conventionalmethod in future.
(B) Pressure Rating : PN 10
(ii) Laying of pipe line including cost of pipe & fittings/specials but
excluding cost of valves.
(a) 110 mm (OD)
Ref:- PHE (SOR ) w.e.f. 03.11.2021, P- L14, IT-4,(B)(ii) ( C) | 60 | M | 654 | ₹39,240 |
| 7 | (b) 160 mm (OD)
Ref:- PHE (SOR ) w.e.f. 03.11.2021, P- L14, IT-4,(B)(ii) (f) | 410 | M | 1,341 | ₹5,49,810 |
| 8 | Lowering, fitting and fixing of all types of valves in proper position and
alignment using chain pully block or crane (for diameter above 250 mm) by providing temporary support, as required, gaskets, nuts & bolts etc. all cornplete as per specification and direction of the Engineer-in-charge. [The rate Includes cost of flange joints]
(a) 100 mm dia.
Ref:-UD & MAD (Schedule) 2018, P-18, IT-2.4.1 | 1 | Each | 986 | ₹986 |
| 9 | (a) 150 mm dia.
Ref:-UD & MAD (Schedule) 2018, P-18, IT-2.4.1 | 3 | Each | 1,510 | ₹4,530 |
| 10 | Cast iron double flanged manually operated sluice valves generally conforming to IS 14846 : 2000, having four faces and spindle nut inside screw non- rising spindle type gunmetal/AISI 410 suitable for PN 1.0 rating complete with ball thrust bearing and enclosed gearbox (EN-8 with hardened by nitriding pinions of EN-19), flanges flat faced
and drilled to IS.: 1538 : 1993. Valves tested by closed end method.
(b) 100 mm dia.
Ref:-UD & MAD (Schedule) 2018, P-46 , IT-8.6. | 1 | Each | 5,067 | ₹5,067 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 5.95 MB
BOQ_2520217.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid