| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 CrAccepted-AOC | ₹9.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹9.7 Cr+₹46.0 L (4.99%)Rejected-AOC | ₹9.7 Cr+₹46.0 L (4.99%) | L2 | Rejected-AOC L2 |
| 3 | L3₹9.8 Cr+₹61.8 L (6.70%)Rejected-AOC PLOT NO 63 PAHADIYAN DISTRICT VARANASI UTTAR PRADESH | VARANASI | UTTAR PRADESH | 221001 | ₹9.8 Cr+₹61.8 L (6.70%) | L3 | Rejected-AOC L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹11.5 Cr
EMD Value
₹22.9 L
Closing Date
10 Jun 2020, 2:00 pmClosed
Superintending Engineer ICC Varanasi
Superintending Engineer ICC Varanasi
Construction of anti errosion work from outfall of Eknaiya drain to Kankarahwaghat, on right bank of river Ganga, in Zamania, District-Ghazipur
2020_UPIDC_478876_2
03/SE/2020-21
Open Tender
Civil Works
Item Rate
360 days
Ghazipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
E E Irrigation Construction Division Varanasi
₹22.9 L
23 Sept 2020
4 Jun 2020
10 Jun 2020
4 Jun 2020
10 Jun 2020
4 Jun 2020
Amount
Earth work in slope cutting/filling and making base for boulder pitching, launching appron etc. in all type of soil . including all lead and lift and T&P etc. required
Supplying, placing and dumping in position new E.C. bag50kg> 72 gm wt. filled with R.B.M. tying and sewing with machine by synthetic thread, in nylon crate of size 1x1x1 m. for making plateform& L.A.
Supply and laying 4 mm diaG.I.wire double knotted crate of size 2.00 X 1.500 X 1.00 m and mesh size 0.20 x 0.20 m including all cost of material, labour and T&P etc.
Supplying and dumping stone boulder in G.I. wire crate of size 2.00X1.500X 1.00 m including all cost of material, labour and T&P. but excluding cost of G.I.wire crate for making Launching apron work .
Supplying and laying dry stone boulder pitching on slope upto 25 to 40 kg weight including all cost of material, labour and T&P.
Supplying and laying of Geo textile sheet made of 240 GSM woven multifilament polypropylene yarn behind boulder stepping as filter including preparation of surface, all cost of material, labourand T&P complete.
Supplying and laying local sand cushion over Geo Textile sheet & below boulder pitching including cost of all material, labour, all lead & lift and T&P but excluding cost of G.I.wire crate.
Providing and laying C.C. 1:3:6 with Hard stone grit 20-40 mm size and coarse sand including all cost of material, labour and T&P.
Providing and laying R.R. stone masonary in C.M. 1:3 with coarse sand including cost of all material, labour and T&P.
Earth work in filling/ embankment in all type of cartage earth including all lift and lead up to 01 km distance including procurement of earth, royalty etc complete.
Construction and placing in position, R.C.C. 1:1½:3 Purcupine consist of 06 no. arm, each of 3.0m length of 100x100 mm size. each arm having 4no. 10 mm dia main bar and 6 mm dia bar ring @ 300 c/c.in each. Including 8 No. 25 mm dia CPVC pipe &13 mm dia 450 mm long Nut-bolt and 5.49 kg G.I. wirwcazing. including filling 0.77 m³ brick rora filled in new E.C. bags and 0.77 m³ Jankhar, Complete in all respect and as directed by E.I.
MSA CONSTRUCTION PRIVATE LIMITED
S.P.R.U INFRATECH PRIVATE LIMITED
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .