Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.5 L
Closing Date
16 Dec 2021, 4:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of the Executive Engineer Mechanical Division Hatli Morh Kathua Jammu and Kashmir
Recapitalization/Over hauling of DRR-2007- 505 Wilson of Mechanical Division, Kathua
2021_PWDJK_150178_1
MDK/TECH/e-NIT/2021-22/20
Open Tender
Machineries/ Mechanical Engg Items
Lump-sum
25 days
Kathua Jammu and Kashmir
As per e-NIT document
2 documents required · 2 mandatory
₹500
Executive Engineer Mechanical Division Kathua
Exempted
24 Dec 2021
26 Nov 2021
17 Dec 2021
26 Nov 2021
16 Dec 2021
26 Nov 2021
180 days
Amount
General overhauling of S4 engine by way of its extraction from the chassis of the DRR with the help of crane and allied tools/tackles. Dismantling all its parts and then cleaning of all the parts with diesel. Grinding of crankshaft to next suitable size then honing and polishing of cylinder block. P/F of engine parts which includes Piston complete with pin & circlip - 4 No., Cylinder liners – 04 No., Piston ring - 4 set, Connecting rod – 04 No., Connecting rod big end bearing – 8 No., Main bearing – 1 set, Connecting rod small end bush – 4 No., Main oil seal – 1 No., Thrust washer – 1 set, Gear cam shaft – 1 No., Washer cam shaft 1 No., Banjo bolt-01 no., Washer banjo bolt-01 no., Timing oil seal – 1 No. Job also includes repairs to head assembly by P/f of Valve guides 08 No., Valve inlet 04 No., Valve exhaust 4 No., Valve seal – 04 No., P/F of rocker shaft 1 No., Rocker R.H - 4 No., Rocker spring – 08 No., Rocker LH with bush 04 No. General overhauling head gasket – 01 No., studs and nuts for engine block - 10 no’s APS for assembling of engine, Shellac tubes - 03 Nos., Fuel pipe from tank to lift pump - 01 no., Feed pump to filter-01 no., filter to F.I.P-01 no., Return pipe-01 no, Hose pipe – 01 set, Oil pressure gauge- 01 No. Temperature gauge -01 no., Ammeter-01 no., Starter Switch-01 no. and engine foundation studs- 04 no’s. Assembling and mounting of S4 engine over the chassis of DRR with the help of crane and allied tools/tackles and thereafter testing it by means of running the engine in idle/no load condition for 01 hour. Complete job includes cost of all material including old dhoti cloth-5 kg and labour charges (skilled and unskilled) including of all taxes.
Complete overhauling Fuel Injection pump (F.I.P) assembly by way of dismantling it and then cleaning of all parts with diesel. Job includes P/F of Joint kit - 01 No., Element - 04 Nos., Delivery valve - 04 Nos., Bearing - 02 Nos., Tooth pin, Tooth sleeve, Tooth quadrant assembly - 04 set, Injectors -04 Nos., with copper washer, feed pump kit-01 no. Job also includes Calibration of fuel pump injectors on fuel pump bench machine for maximum output. Assembling of all the parts of F.I.P assembly and thereafter testing it. Complete job includes cost of material and labour charges (skilled and unskilled) including of all taxes.
Repair to Gear Box assembly by way of dismantling it and of cleaning all the parts with diesel. Job includes P/F of Drain Plug (306-1-26) - 2 No., Oil thrower for gear box (306-1-1) - 1 No., Plug (306-1-3) - 1 No., Stud (S-3-005) - 10 Nos., Stud (S-3-011) - 20 Nos., Packing (306-1-27) - 1 No., Cover (306-1-4) – 1 No, Joint (306-1-5) – 1 No, Speed pinion fast (306-5-1) - 01 No., Speed pinion 2nd (306-5-2) - 1 No, Speed pinion slow (306-5-3) – 1 No, Bush (306-5-5) APS – 02 No, Bolt (306-5-6) – 06 No. (To be provided by divisional store), Wire (306-5-8) – 01 No, Castle nut (N-4-014) – 06 no, plain washer (PW-6-003)-06no, end cover (306-5-7)-02no, bush (306-6-7) APS -01no, bush (306-6-8) APS -01no. (To be provided by divisional store), bolt (B-1-008) – 02 No, tab washer (306-6-24) 02no, split pin (SP-7-010) 01 No. Assembling of all the parts of complete gear box assembly after completion of job and thereafter testing it. Complete job includes cost of all material and labour charges (skilled and unskilled) including of all taxes.
Repair to differential system assembly of DRR by way of dismantling it and removing of old damaged parts. Job includes P/F of Drive pinion (306-7-11) APS - 02 no., Bush (306-7-2) APS - 02 no., pin (306-7-9)- 01 no., washer (306-7-17)- 02 no., Tab Washer (306-7-33)- 02 no., Bolt (B-1-010)- 04 no., Shaft (306-7-23)-01 no. (To be provided by divisional store), Shaft (306-7-22)-01 no. (To be provided by divisional store), Bevel Pinion (306-7-24) - 02 No. (To be provided by divisional store), Washer (306-7-27) - 04 No. (To be provided by divisional store), Bush (306-7-29) APS -02 No. (To be provided by divisional store), Bolt (B-1-017A)-12no, spring washer (sw-5-005)-12no, nut (N-4-007)-12no. Assembling of all the parts of complete differential system assembly after completion of job and thereafter testing it. Complete job includes cost of all material and labour charges (skilled and unskilled) including of all taxes.
Repair to Hind roll and axle assembly by way of dismantling it, removing of grease and then cleaning of all the parts with diesel. Job includes P/F of pin dowel (308-1-8) – 02 No, Stud (S-3-014) – 20 No, Nut (N-4-023) – 20 No, Sp. Washer (SW-5-009)- 20 No, Set screw (SS-2-011)-08 No, SP. Washer (SW-5-005) – 10 No. Job also includes rebuilding of teeth of both spur rings by way of welding, grinding and then finishing it to the reqd. shape and size including extraction of broken/worn-out studs from spur ring by way of gas cutting without causing damage to the body. Assembling and greasing of all parts of complete rear roll assembly (Both wheels) after completion of job and thereafter testing it. Complete job includes the cost of parts, labour and other tools and tackles required for job with all taxes.
Repair to the direct drive engine to gear box assembly by way of dismantling it completely and cleaning parts with diesel. Job includes P/F of flange splined (306-15-3) - 1no, bolt (306-15-1) - 4no’s, Tab washer (306-15-8) – 04 Nos, adapter plate (306-15-2) -1no, coupling shaft (306-15-4)-1no., bolt (B-1-011)-6 no’s, bolt (B-1-010)-6 Nos, slotted nut (N-4-012)-12 no’s, Split pin (SP-7-004) – 12 Nos. Assembling of all parts of complete direct drive engine to gear box assembly after completion of job and thereafter testing it. Complete job includes the cost of parts, labour and other tools and tackles required for job with all taxes.
Repair to the Bevel Pinion Drive assembly of DRR by way of dismantling it and removing of old damaged parts. Job includes P/F of Washer (306-2-8) - 01no. (To be provided by divisional store), Cover (306-2-2) – 01 no, Bolt (B-1-007) - 04no, Spring washer (SW-5-004)-04no, ball bearing (306-2-14) APS -01no. (To be provided by divisional store), ball bearing (306-2-15) APS -01no. (To be provided by divisional store), split pin (SP-7-006)-01no., slotted nut (N-4-013)-01no, oil seal (306-2-13)-01no. (To be provided by divisional store), reverse bevel pinion (306-2-3)-01no. (To be provided by divisional store) Assembling of all the parts of complete Bevel Pinion Drive assembly after completion of job and thereafter testing it. Complete job includes cost of all material and labour charges (skilled and unskilled) including of all taxes.
Allied Repairs a) Repair to the fuel tank by way of dismantling it and washing it with solvent, plugging of leakages by gas welding and removal of scales and rust. Complete job includes cost of material and labour charges (skilled and unskilled) including of all taxes. b) Repair to operator seat with electrical/gas welding and then P/F of cushioning material to seat and backrest with cover along with angle frame and plywood. Complete job includes cost of material and labour charges (skilled and unskilled) including of all taxes.
Shifting of machine to service station and removing dust, rust, oil, etc. using diesel and caustic soda. Painting of machine by way of preparing the surface by scrape off old worn-out paint with hand scrapes/emery paper, then complete painting of the machine using 2 coats of enameled paint after applying one coat of primer. Job also includes letter writing on the machine as per requirement. Complete job includes cost of material and labour charges (skilled and unskilled) including of all taxes.
Shifting of machine in a truck From MED workshop to working site Bani local, loading of machine in a truck to workshop of firm for repairs works and then back to workshop Mechanical Division Kathua. From MED workshop to firm workshop, loading of machine in a truck after repairs and then back to MED workshop Kathua. Complete job includes hire charges of truck, HSD charges, ramp making at working site Bani with the help of backhoe loader and allied tools/tackles.
HSD for cleaning of parts & testing of machine for idle running
M/S SHUBAM SALE AND REPAIRS
M/S MUNNA MOTORS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .