Tender Value
₹69 L
EMD Value
₹5.5 L
Closing Date
1 Oct 2026, 12:00 pm2d left
SE, BSR CIRCLE, PWD, BULANDSHAHR
SE, BSR CIRCLE, PWD, BULANDSHAHR
Reconstruction work of Damaged and narrow Bridge Located at Km-2 of HSK to Aliabad Link Road
2026_CEMRT_1189719_1
8914/96M/E-TENDER/BSR CIRCLE/2026-27 Dated 05.09.2026
Open Tender
Civil Works - Bridges
Percentage
270 days
SE, BSR CIRCLE, PWD
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹5.5 L
SE, BSR CIRCLE, PWD, BULANDSHAHR
25 Sept 2026
25 Sept 2026
1 Oct 2026
25 Sept 2026
1 Oct 2026
25 Sept 2026
26 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres and including all Taxes T&P, labour etc complete but excluding GST. | 100 | Cum | 450 | ₹45,000 |
| - | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification and including all Taxes T&P, labour etc complete but excluding GST. | 12 | Cum | 1,100 | ₹13,200 |
| - | Excavation in foundation in ordinary soil including lift upto 1.50 M. and lead upto 30 M. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-Charge upto a distance of 30 M. from the foundation trenche and Including cost of all material, labour, T&P, royalty, labour cess, all taxes complete, but excluding cost GST. | 350 | Cum | 42.5 | ₹14,875 |
| - | Filling sand in Foundation Trenches as per Drawing & Technical Specification and including supply of all material, labour, T&P all taxes royalty,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge but excluding cost GST. | 54 | Cum | 2,350 | ₹1,26,900 |
| - | Providing concrete for Plain cement concrete (M-10) in open foundation complete as per drawing and technical specifications in leveling coarse and including supply of all material, labour, T&P all taxes royalty,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge but excluding cost GST. | - | Cum | 7,700 | - |
| - | Providing concrete for Reinforced cement concrete (M-25) in open foundation complete as per drawing and technical specifications and including necessary centering and shuttering etc.complete including supply of all material, labour, T&P, all taxes, labour cess etc. required for proper completion of work as per direction by the Engineer In-charge but excluding cost GST. | 65 | Cum | 8,600 | ₹5,59,000 |
| - | Providing concrete for Reinforced cement concrete (M-25) in sub-structure complete as per drawing and technical specifications and including necessary centering and shuttering etc.complete including supply of all material, labour, T&P, all taxes, labour cess etc. required for proper completion of work as per direction by the Engineer In-charge but excluding cost GST (Sub Structure). | 55 | Cum | 9,100 | ₹5,00,500 |
| - | Supplying, fitting and placing with MS bar Reinforcement (Fe 415) Bar in use substructure complete as per drawings and Technical Specification including bending for proper and necessary completion of the work and including supply of steel and wastages, bends, hook and authorised overlapping shall be measured as per direction of Engineer-in-Charge and Including cost of all material, labour, T&P, royalty, labour cess, all taxes complete, but excluding cost GST. (Sub Structure). | 14 | MT | 79,000 | ₹11,06,000 |
| - | Providing concrete for Reinforced cement concrete (M-25) in Super-structure complete as per drawing and technical specifications and including necessary centering and shuttering etc.complete including supply of all material, labour, T&P, all taxes, labour cess etc. required for proper completion of work as per direction by the Engineer In-charge but excluding cost GST (Super Structure). | 55 | Cum | 9,900 | ₹5,44,500 |
| - | Supplying, fitting and placing with MS bar Reinforcement (Fe 415) Bar in use substructure complete as per drawings and Technical Specification including bending for proper and necessary completion of the work and including supply of steel and wastages, bends, hook and authorised overlapping shall be measured as per direction of Engineer-in-Charge and Including cost of all material, labour, T&P, royalty, labour cess, all taxes complete, but excluding cost GST. (Super Structure). | 7 | MT | 80,000 | ₹5,60,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Tendernotice_2.pdf
PDF • 1.72 MB
BOQ_2241677.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .