| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC | ₹10.0 L Quoted ₹8.5 L | L1 | Accepted-AOC Work order issued |
| 2 | L2₹8.6 L+₹15,858.94 (1.87%)Rejected-Finance | ₹8.6 L+₹15,858.94 (1.87%) | L2 | Rejected-Finance L2 |
| 3 | L3₹9.2 L+₹67,705.47 (7.98%)Rejected-Finance | ₹9.2 L+₹67,705.47 (7.98%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹20,339
Closing Date
27 Jun 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Ward number 39 gaighat mein CC sadak se Vinod Gupta ke makanon Tak RCC nali vah CC sadak ka Nirman karya
2026_DOLBU_1161050_1
FFC Ward 39 sn 40
Open Tender
Civil Works
Percentage
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Nagar Nigam Gorakhpur
₹20,339
8 Sept 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
27 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Earth work in excavation in foul position soil lead 50mt.& lift 1.5 mt. incl. lab. T&P etc all complete. | 25.2 | Cum | 120 | ₹3,024 |
| 1.02 | P/L of base concrete in 1:6:12 with cement, L-Sand and 40mm S/B including mat. Lab. T&P,etc all complete. | 9.36 | Cum | 4,007 | ₹37,505.52 |
| 1.03 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I No-289) | 41.22 | Cum | 9,082 | ₹3,74,360.04 |
| 1.04 | M.S. (Tor steel or plain) in plain work such as R.C.C or R.B work Including bending for proper shape as necessary including bending for proper completion of the work and Including supply of all steel & wastage, bend, hooks, and authorised overlapping shall be measured. (S.I-504) | 22.52 | Qtl | 7,690 | ₹1,73,178.8 |
| 1.05 | P/L of 125 micron polythin sheet including etc. all complete of work. | 288 | Sqm | 24 | ₹6,912 |
| 1.06 | S/L of GSB 53-9.5mm thick S/B upto 10 cm loose layer including etc all complete of work. | 28.8 | Cum | 3,134.25 | ₹90,266.4 |
| 1.07 | Consolidation of GSB upto 10 cm loose layer including etc all complete of work. | 28.8 | Cum | 210 | ₹6,048 |
| 1.08 | P/F Baricating of road including supply of materials etc. all complete of work. | 20 | Rmt | 118 | ₹2,360 |
| 1.09 | P/L CC in 1:1.5:3 for road work with cement coarse sand 20mm & stone grit. Including supply of all material and labour etc. | 34.56 | Cum | 9,150 | ₹3,16,224 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
d.pdf
Tender Documents • 2.36 MB
BOQ_2176118.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .