| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC | ₹9.0 L | L1 | Accepted-AOC AOC |
| 2 | L2₹9.8 L+₹82,489.68 (9.19%)Rejected-Finance | ₹9.8 L+₹82,489.68 (9.19%) | L2 | Rejected-Finance higher rate |
Tender Value
₹9.4 L
EMD Value
₹22,000
Closing Date
1 Jan 2026, 10:00 amClosed
NARENDER TANEJA
Municipal Committee Beri
development work in khatik dharamshala
2025_HRY_492968_1
2025FFF6C554 DDC1 48A0 BF6C 0CDA9A6A2B54324ULB
Open Tender
Civil Works
Works
250 days
Beri
2 documents required · 2 mandatory
₹1,000
₹22,000
Yes
27 Feb 2026
24 Dec 2025
1 Jan 2026
24 Dec 2025
1 Jan 2026
24 Dec 2025
24 Dec 2025 - 26 Dec 2025
Pointing on tile brick work with cement mortar 1 :3 (1 cement : 3 fine sand): Flush/ Ruled/ Struck or weathered pointing
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level: 1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 cum graded stone aggregate 20 mm nominal size)
Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth
Providing and laying brick tiles over mumty roofs, grouted with cement mortar 1 :3 (1 cement : 3 fine sand) mixed with 2% of integral water proofingcompound by weight of cement, over 12 mm layer of cement mortar 1 :3 (1 cement : 3 fine sand) and finished neat: With common burnt clay non-modular brick tiles of class designation 1 O
Centering and shuttering including strutting, propping etc. And removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. And removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Providing gola 75x75 mm in cement concrete 1: 2:4 (1 cement : 2 coarse sand: 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1 :3 (1 cement : 3 fine sand) as per standard design : In 75x75 mm deep chase
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1 :4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete Size of Tile 600x600 mm
Providing and laying of conglomerate floor 40mm thick cement concrete topping 1 :2:4
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level. Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, over1aps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement Thermo-Mechanically Treated bars of grade Fe-500D kg or more
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1: 1.5:3 (1 cement : 1.5 coarse sand(zone-111) : 3 graded stone aggregate 20 mm nominal size).
Centering and shuttering including strutting, propping etc. And removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-111) : 3 cum graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. And removal of form for Suspended floors, roofs, landings, balconies and
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_571304.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .