| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹14.9 LAccepted-Finance | L-1 | Accepted-Finance L-1 | |
| 2 | L-2₹16.3 L+₹1.3 L (8.97%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹17.1 L+₹2.2 L (14.7%)Rejected-Finance A 25 NEW COLONY KALAGARH DIST PAURI GARHWAL | L-3 | Rejected-Finance L-3 | |
| 4 | L-4₹18.3 L+₹3.4 L (22.7%)Rejected-Finance ANWALKHEDA MR | CHHINDWARA | MADHYA PRADESH | 460663 | L-4 | Rejected-Finance L-4 | |
| 5 | L-5₹20.4 L+₹5.4 L (36.3%)Rejected-Finance | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | M/s Virendra Singh Contractor L2 | ASHISH CHOUHAN L6 | PAWAN KUMAR L3 | HARVIR CHAUHAN L5 | M/S PRABHAT CONTRACTOR AND ENGINEERS L1 | M/S SHIVAM SINGH CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in cutting in all type of soil in in foundation with ramming and dressing. | 237.8 | Cum | 75 ₹17,835 | 98 ₹23,304.4 | 40 ₹9,512 Lowest | 80 ₹19,024 | 50 ₹11,890 | 60 ₹14,268 |
| 2.00 | Laying C.C. 1:3:6 in foundation with cement, coarse sand & stone grit 25 to 37.25 mm. size including all cost of material, labour and T&P etc. complete. | 50 | Cum | 4,490 ₹2,24,500 | 5,975 ₹2,98,750 | 2,800 ₹1,40,000 Lowest | 5,900 ₹2,95,000 | 3,900 ₹1,95,000 | 5,700 ₹2,85,000 |
| 3.00 | M-150 brick work in 1:4 cement and coarse sand mortar including all cost of material, labour and T&P etc. complete. | 151 | Cum | 4,350 ₹6,56,850 Lowest | 5,780 ₹8,72,780 | 5,300 ₹8,00,300 | 5,725 ₹8,64,475 | 4,800 ₹7,24,800 | 5,500 ₹8,30,500 |
| 4.00 | Laying R.C.C. in 1:1.5:3cement, coarse sand and stone grit 10 to 25 mm. size.all cost of material, labour and T&P etc. complete. | 26 | Cum | 5,720 ₹1,48,720 Lowest | 7,625 ₹1,98,250 | 7,637 ₹1,98,562 | 7,600 ₹1,97,600 | 5,900 ₹1,53,400 | 7,400 ₹1,92,400 |
| 5.00 | Laying C.C. in 1:1.5:3cement, coarse sand and stone grit 10 to 25 mm. size.all cost of material, labour and T&P etc. complete | 17 | Cum | 5,200 ₹88,400 Lowest | 6,980 ₹1,18,660 | 6,993 ₹1,18,881 | 6,500 ₹1,10,500 | 5,900 ₹1,00,300 | 6,700 ₹1,13,900 |
| 6.00 | P/Laying of steel Reinforcement in slab & Lintel i/c cost of all material ,labour and T&P etc | 1.8 | MT | 56,000 ₹1,00,800 Lowest | 74,100 ₹1,33,380 | 74,266 ₹1,33,678.8 | 73,000 ₹1,31,400 | 69,000 ₹1,24,200 | 72,000 ₹1,29,600 |
| 7.00 | P/LCentering & Shuttering for R. C. C. work i/c all cost of material, labour and T&P etc. complete.. | 113.3 | Sqm | 700 ₹79,310 | 850 ₹96,305 | 860 ₹97,438 | 750 ₹84,975 | 450 ₹50,985 Lowest | 700 ₹79,310 |
| 8.00 | P/L cement Struck deep pointing in 1:2 cement sand mortar i/c all cost of material, labour and T&P etc. complete. | 148.7 | Sqm | 105 ₹15,613.5 | 135 ₹20,074.5 | 139 ₹20,669.3 | 120 ₹17,844 | 100 ₹14,870 | 80 ₹11,896 Lowest |
| 9.00 | P/F of PVC Pipe 75mm dia including all cost of material, labour and T&P etc. complete.! | 1.6 | RM | 115 ₹184 | 145 ₹232 | 150 ₹240 | 100 ₹160 Lowest | 100 ₹160 Lowest | 130 ₹208 |
| 10.00 | Earth work in filling in all type of soil i/c ramming, dressing with lead upto 1.00 Km. | 756 | Cum | 120 ₹90,720 | 175 ₹1,32,300 | 50 ₹37,800 | 140 ₹1,05,840 | 40 ₹30,240 Lowest | 80 ₹60,480 |
Tender Value
₹21.8 L
EMD Value
₹43,600
Closing Date
6 May 2026, 2:00 pmClosed
EE BDGC BSR
EE BDGC BSR
Construction of V. R. B. At km 19.250 of Hasanpur Drain
2026_UPIDC_1143810_1
01/EE/2026-27
Open Tender
Civil Works
Item Rate
90 days
Gautam Buddha Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹43,600
20 May 2026
30 Apr 2026
6 May 2026
30 Apr 2026
6 May 2026
30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting in all type of soil in in foundation with ramming and dressing. | 237.8 | Cum | - | - |
| 2 | Laying C.C. 1:3:6 in foundation with cement, coarse sand & stone grit 25 to 37.25 mm. size including all cost of material, labour and T&P etc. complete. | 50 | Cum | - | - |
| 3 | M-150 brick work in 1:4 cement and coarse sand mortar including all cost of material, labour and T&P etc. complete. | 151 | Cum | - | - |
| 4 | Laying R.C.C. in 1:1.5:3cement, coarse sand and stone grit 10 to 25 mm. size.all cost of material, labour and T&P etc. complete. | 26 | Cum | - | - |
| 5 | Laying C.C. in 1:1.5:3cement, coarse sand and stone grit 10 to 25 mm. size.all cost of material, labour and T&P etc. complete | 17 | Cum | - | - |
| 6 | P/Laying of steel Reinforcement in slab & Lintel i/c cost of all material ,labour and T&P etc | 1.8 | MT | - | - |
| 7 | P/LCentering & Shuttering for R. C. C. work i/c all cost of material, labour and T&P etc. complete.. | 113.3 | Sqm | - | - |
| 8 | P/L cement Struck deep pointing in 1:2 cement sand mortar i/c all cost of material, labour and T&P etc. complete. | 148.7 | Sqm | - | - |
| 9 | P/F of PVC Pipe 75mm dia including all cost of material, labour and T&P etc. complete.! | 1.6 | RM | - | - |
| 10 | Earth work in filling in all type of soil i/c ramming, dressing with lead upto 1.00 Km. | 756 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.08 MB
BOQ_2136821.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .