| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAccepted-AOC NO 4 745 5 FIRST FLOOR 3RD STREET 6TH CROSS STREET MAHALAKSHMI NAGAR K PUDUR MADURAI 02 | MADURAI | MADURAI | TAMIL NADU | ₹3.6 Cr Quoted ₹3.5 Cr | L1 | Accepted-AOC L1 CONTRACTOR |
| 2 | L2₹3.5 Cr+₹1.2 L (0.35%)Rejected-Finance | ₹3.5 Cr+₹1.2 L (0.35%) | L2 | Rejected-Finance L2 CONTRACTOR |
Tender Value
Refer Docs
EMD Value
₹3.6 L
Closing Date
10 Jan 2025, 3:00 pmClosed
Additional collector DRDA Madurai
o/o Additional collector DRDA Madurai
Strengthening and Black Toppingof Ayyar pudur road- Koolapandi road Km 0/00 -1/955 (R409) in Madurai West Block in Madurai district under NABARD XXX (2024-25)
2024_RDTN_514730_13
DIPR/5603/Tender/2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Madurai west
Refer Tender documents
5 documents required · 5 mandatory
₹0
₹3.6 L
o/o Additional collector DRDA Madurai
6 Mar 2025
31 Dec 2024
10 Jan 2025
31 Dec 2024
10 Jan 2025
3 Jan 2025
3 Jan 2025
Amount
Part-1:- Strengthening of the Road From Ayyar pudur road- Koolapandi road Km 0/00 -1/955
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A achieve the desired density, complete as per Technical Specification Clause 401 Grading III.
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying Primecoat over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete.
Applying Tackcoat over Primed WMM surface at 2.5Kg / 10 sq.m RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete.
Bituminous Macadam 50 MM thick including hire and Labour charges etc., complete.(using plastic waste)
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying U.S. gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.
Road Marking with Hot Applied Thermoplastic compound with reflectorising Glass beads on Bituminous surface
Supply and fixing of KM stone SI No.43 C.
Supply and fixing of HM stone SI No.44 C.
Provision for CIB & Name Board.
Road Marker / Road Stud with lens reflector
60cm Equilateral triangle cautionary sign board
Contruction of Retaining wall ch@0/0-0/120 left
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A achieve the desired density, complete as per Technical Specification Clause 401 Grading III.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Towards the centring charges for Drainage works., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m2
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m
Provision for Weep holes 63mm PVC Pipe
Contruction of Retaining wall ch@0/315-0/356 left
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A achieve the desired density, complete as per Technical Specification Clause 401 Grading III.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Towards the centring charges for Drainage works., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m2
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m
Provision for Weep holes 63mm PVC Pipe
Contruction of Retaining wall ch-0/467-0/586 left
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A achieve the desired density, complete as per Technical Specification Clause 401 Grading III.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Towards the centring charges for Drainage works., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m2
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m
Provision for Weep holes 63mm PVC Pipe
Contruction of Retaining wall ch-0/706-0/771 left
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A achieve the desired density, complete as per Technical Specification Clause 401 Grading III.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Towards the centring charges for Drainage works., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m2
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m
Provision for Weep holes 63mm PVC Pipe
Contruction of Retaining wall ch-0/586-0/706 right
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A achieve the desired density, complete as per Technical Specification Clause 401 Grading III.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Towards the centring charges for Drainage works., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m2
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m
Provision for Weep holes 63mm PVC Pipe
Contruction of Retaining wallch-0/833-0/913 right
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A achieve the desired density, complete as per Technical Specification Clause 401 Grading III.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Towards the centring charges for Drainage works., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m2
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m
Provision for Weep holes 63mm PVC Pipe
Contruction of Retaining wall ch@0/356-0/416 left
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A achieve the desired density, complete as per Technical Specification Clause 401 Grading III.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Towards the centring charges for Drainage works., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m2
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m
Provision for Weep holes 63mm PVC Pipe
Contruction of Retaining wall ch-@ 0/416-0/476 right
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A achieve the desired density, complete as per Technical Specification Clause 401 Grading III.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Towards the centring charges for Drainage works., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m2
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m
Provision for Weep holes 63mm PVC Pipe
Contruction of Retaining wall ch-@ 1/035-1/093 left
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A achieve the desired density, complete as per Technical Specification Clause 401 Grading III.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Towards the centring charges for Drainage works., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m2
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m
Provision for Weep holes 63mm PVC Pipe
construction of culvert 6m span @ ch-1070m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A achieve the desired density, complete as per Technical Specification Clause 401 Grading III.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Towards the centring charges for Drainage works., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m2
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing tar paper for bearing between bed block & deck slab
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Weep holes 63mm PVC Pipe
Part-B:- Maintenance work
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SHARVAA ASSOCIATES (BID ID -1229567)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .