| 1 | 1₹6.8 CrAccepted-AOC 8 1 B PAHARPUR HOUSE DIAMOND HARBOUR ROAD ALIPORE KOLKATA WEST BENGAL 700027 | KOLKATA | WEST BENGAL | 700027 | ₹6.8 Cr | 1 | Accepted-AOC L1 Bidder |
| 2 | 2₹10.4 Cr+₹3.6 Cr (52.9%)Rejected-Finance | ₹10.4 Cr+₹3.6 Cr (52.9%) | 2 | Rejected-Finance L2 Bidder |
Tender Value
Refer Docs
EMD Value
₹7.1 L
Closing Date
16 Jul 2019, 3:00 pmClosed
Mr.Vivek Kelkar
thyssenkrupp Industrial Solutions (India) Private Limited (Formerly Uhde India Private Limited) Uhde House, L B S Marg, Vikhroli (W), Mumbai - 400083, India.
Design, engineering, supply ,erection, testing and commissioning of two cells of RCC cooling tower (extension of existing Cooling Tower CT-4) including final hook up/Tie in with existing facilities on Package basis for BS VI project Paradip Refinery
2019_REFHQ_99451_1
25284124-8720-CP-000-0022
Open Tender
Lump Sum TurnKey
Works
390 days
IOCL PARADIP REFINERY
Please refer Tender documents.
4 documents required · 4 mandatory
₹7.1 L
Yes
tkIS Mumbai
27 Jan 2020
18 Jun 2019
17 Jul 2019
18 Jun 2019
16 Jul 2019
1 Jul 2019
25 Jun 2019
Amount
Total Lump-sum Price for Design, engineering, supply ,erection, testing and commissioning of two cells of RCC cooling tower (extension of existing Cooling Tower CT-4) including final hook up/ Tie in with existing facilities on package basis for BS VI project, at Paradip Refinery with single point responsibility including but not limited to Project Management, planning, scheduling, monitoring, design & detailed engineering, Supply including - Procurement services of all required equipment/ Materials, Third party Inspection, all material required for fabrication and transportation, trial runs, PGTR , commissioning spares, mandatory spares, spares for start-up / pre-commissioning / commissioning; special tools & tackles, consumables, transportation upto site, receipt& unloading at site, accounting, storing & preservation of materials including all other activities incidental to procurement and supply, Construction, Fabrication, Erection, Installation, Testing, Mechanical Completion, Pre-commissioning, Commissioning and conducting Performance Guarantee Test Run, including final hook up/ Tie in with existing facilities on package basis for BS VI project, at Paradip Refinery; as per provisions of Bidding Document ; supply of all labour, materials, tools & tackles, providing construction aids and all safety devices for construction, all complete as per Bidding Document and direction of Engineer-in-Charge.
PRICE FOR ABOVE IN INDIAN CURRENCY
Charges for 2 years Operation and Maintenance Spares for two cells of RCC cooling tower ( extension of existing Cooling Tower CT-4) including final hook up/ Tie in with existing facilities on Package basis for BS VI project, at Paradip Refinery.
Charges for 2 years Operation and Maintenance Spares for Two cells of RCC cooling tower ( extension of existing Cooling Tower CT-4) including final hook up/ Tie in with existing facilities on Package basis for BS VI project, at Paradip Refinery.
Hamon Shriram Cottrell Pvt. Ltd.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .