Tender Value
₹63.5 L
Closing Date
14 Jun 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer PMGSYDiv Budgam
Office of Executive Executive Engineer PMGSY (JKRRDA) Division Budgam Near Baghi Mahtab Railway Bridge
Renewal Coat/Macadamization and Maintenance of roads from Part-I Bonzanigam to Latina Package No. JK02-63, Length 1.70 km . Part-II Loolipora to Nursinghpora, Package No. JK02-82, Length 2.62 kms Block Berwa PMGSY Division Budgam
2021_KSRRD_110442_1
E-NIT NO 06/EE/PMGSY/BD/DB OF 2021-22
Open Tender
CIVIL
Item Rate
185 days
Budgam
Please refer Tender documents.
13 documents required · 13 mandatory
₹4,000
Executive Engineer PMGSYDiv Budgam
Exempted
Officeof the Executive Engineer PMGSYDiv Budgam
21 Jun 2021
1 Jun 2021
15 Jun 2021
1 Jun 2021
14 Jun 2021
3 Jun 2021
2 Jun 2021
90 days
Amount
(Part-I) Bonzanigam To Latina Package No: JK02-63, Length:1.70Kms Block Berwa.
Scarifying the existing Bituminous Surface to a depth of 150mm and disposal of scarified material within all leads and lifts upto 1km
WBM Grading 2 : P/L, spreading & compacting stone aggregates of specific sizes to water bound macadam specification incld. spreading in uniform thickness, hand packing, rolling with three wheel roller 80-100kN static roller in stages to proper grade and camber, applying & brooming with crushable, stone screening, binding materials to fill up the interstices of coarse agg., watering and compacting to the required density grade 2 as per technical specification clause 405.manual means.including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .
Tack Coat: Providing and Laying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25to 0.30Kg per Sqm on the prepared bituminous surface cleaned with Hydraulic broom ar per technical specification clause 503.including loading/unloading,haulage, and octri etc of all materials complete job involved(Finished work to be measured )
25mm thick Semidense: Providing and laying of 25 mm thick (Compacted) semidense bituminous concrete surface using crushed stone aggregates of specified grading as per specification and bitumin of grade VG 10 @ 5% by weight of total mix including hot mixing of the stone aggregrate and bitumin in hot mix plant, transporting the mixed material from plant site by mechanical transport upto the site of work, laying the mixed material with payer finisher to required level and grade and rolling with road roller as per MORTH Specification to acheive the desired compaction/density including cost loading/unloading,haulage, and octri etc of all materials complete job involved(Finished work to be measured )
Seal Coat: Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510.Bitumen (S-90) (By Mechanical Means) including loading, unloading, haulage, octeri and royality etc (Finished work to be measured)
Construction of Earthen Shoulders using ordinary earth well compacted using Roller 80-100 Kn capacity to achieve the desired density.
PCC Retaining wall
Earth work in excavation for structures as per drawings and MORD technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto required lead , dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary/hard soil upto required depth.
Type B (First Class) bedding, Laying (first class) bedding of well compacted sand, moorum or approved granular material as per MORD technical specification clause 1105 (ii) including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Providing concrete for plain concrete in open foundations complete as per drawings and Technical Specifications clause 802, 803, 1202, & 1203 in PCC Grade M-10 Nominal Mix (1:3:6) including cost of form-work & incl. cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .
Providing conc. for plain cement concrete in open foundation complete as per drawings and MORD technical specification clauses 802, 803, 1202, and 1203 P.C.C. Grade M-15 (1:2.5:5) Nominal mix.including cost of form-work & incl. cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .
Part B: PCC Drain
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (Finished work to be measured)
Type B (First Class) bedding, Laying (first class) bedding of well compacted sand, moorum or approved granular material as per MORD technical specification clause 1105 (ii) including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 Including loading, unloading, haulage, octeri and royality etc (Finished work to be measured)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade Including loading, unloading, haulage, octeri and royality etc (Finished work to be measured)
Construction of unlined surface drains manually using picks and shovels RD 100 to 300 = 200 RM, RD 400 to 600 = 200 RM Total Length = 400 RM Qty = 400m x 0.40m x 0.40m = 64.00cum
Maintenance
AMC for 1st Year
AMC for 2nd Year
AMC for 3rd Year
AMC for 4th Year
AMC for 5th Year
Part-II Loolipora To Nursingpora Package No.JK02-82 Length 2.62 Km
Scarifying the existing Bituminous Surface to a depth of 150mm and disposal of scarified material within all leads and lifts upto 1km
WBM Grading 2 : P/L, spreading & compacting stone aggregates of specific sizes to water bound macadam specification incld. spreading in uniform thickness, hand packing, rolling with three wheel roller 80-100kN static roller in stages to proper grade and camber, applying & brooming with crushable, stone screening, binding materials to fill up the interstices of coarse agg., watering and compacting to the required density grade 2 as per technical specification clause 405.manual means.including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .
Tack Coat: Providing and Laying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25to 0.30Kg per Sqm on the prepared bituminous surface cleaned with Hydraulic broom ar per technical specification clause 503.including loading/unloading,haulage, and octri etc of all materials complete job involved(Finished work to be measured )
25mm thick Semidense: Providing and laying of 25 mm thick (Compacted) semidense bituminous concrete surface using crushed stone aggregates of specified grading as per specification and bitumin of grade VG 10 @ 5% by weight of total mix including hot mixing of the stone aggregrate and bitumin in hot mix plant, transporting the mixed material from plant site by mechanical transport upto the site of work, laying the mixed material with payer finisher to required level and grade and rolling with road roller as per MORTH Specification to acheive the desired compaction/density including cost loading/unloading,haulage, and octri etc of all materials complete job involved(Finished work to be measured )
Seal Coat: Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510.Bitumen (S-90) (By Mechanical Means) including loading, unloading, haulage, octeri and royality etc (Finished work to be measured)
Construction of Earthen Shoulders using ordinary earth well compacted using Roller 80-100 Kn capacity to achieve the desired density.
Part B: Crate Wall
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (Finished work to be measured)
Providing and laying of boulder apron laid in wire crates with 4 mm dia Black Anealed wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301
Backfilling behind Retaining wall/Breast wall complete as per drawings & technical specification Clause 1204.3.8 including loading, unloading, haulage, octeri and royality etc (Finished work to be measured)
Part c: PCC Drain
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (Finished work to be measured)
Type B (First Class) bedding, Laying (first class) bedding of well compacted sand, moorum or approved granular material as per MORD technical specification clause 1105 (ii) including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 Including loading, unloading, haulage, octeri and royality etc (Finished work to be measured)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade Including loading, unloading, haulage, octeri and royality etc (Finished work to be measured)
Construction of unlined surface drains manually using picks and shovels
Maintenance
AMC for 1st Year
AMC for 2nd Year
AMC for 3rd Year
AMC for 4th Year
AMC for 5th Year
The Contractor has to quote the rates for Construction part without GST and GST @12% shall be added at the time of Allotment.
HAJI ALI MOHAMMAD DAR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .