Loading…
Loading…
Tender Value
₹2.5 L
EMD Value
₹5,200
Closing Date
14 Sept 2026, 2:30 pm5d left
HES
HEAD ENGINEERING SERVICES CSIR-CCMB HABSIGUDA HYDERABD 500 007
Making RCC Reinforced Cement Concrete retaining wall in the basement of Student hostel at LaCONES AT ATTAPUR HYDERABAD
2026_CSIR_288711_1
CCMB/WKS-10/26-27
Open Tender
Civil Works
Item Rate
30 days
CCMB-LaCONES
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,200
14 Sept 2026
24 Aug 2026
15 Sept 2026
25 Aug 2026
14 Sept 2026
25 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | in the basement of Student hostel at LaCONES | - | - | - | - |
| 1 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. Nominal concrete 1:3:6 or richer mix. | 3 | cum | - | - |
| 2 | Earth work in excavation by mechanical means ( Hydraulic excavator ) / manual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 sqm on plan ) , including dressing of sides and ramming of bottoms , lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m . All kinds of soil | 4.5 | cum | - | - |
| 3 | Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete. | 2.4 | cum | - | - |
| 4 | Brick work with common burnt clay F.P.S ( non modular ) bricks of class designation 3.5 in foundation and plinth in :Cement mortar 1:6 ( 1 cement : 6 coarse sand ) | 5.2 | cum | - | - |
| 5 | 18 mm cement plaster in two coats under layer 12mm thick cement plaster 1:5 ( 1cement : 5 coarse sand ) and a top layer 6mm thick cement plaster 1:3 ( 1 cement : 3 coarse sand ) finished rough with sponge. | 70 | sqm | - | - |
| 6 | Reinforced cement concrete work in walls ( any thickness ) , including attached pilasters , buttresses , plinth and string courses , fillets , columns , pillars , piesr , abutments , posts and structs etc. above plinth level up to floor five level excluding the cost of centering , shuttering, finishing and reinforcement: 1:1.5:3 ( 1 cement : 1.5 coarse sand ( zone-III) derived from natural sources : 3 graded stone aggregate 20mm nominal size derived from natural sources ) | 7 | cum | - | - |
| 7 | Steel reinforcement for R.C.C. Work including straightening , cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars | 295 | Kg | - | - |
| 8 | Centering and shuttering including strutting , propping etc. and removal of form for :-
A] Foundations footings , bases of columns , etc. for mass concrete. | 16 | sqm | - | - |
| 9 | B] Walls (any thickness) including attached pilasters, butteresses,plinth and string courses etc. | 32 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
ETenderDoc.pdf
Tender Documents • 0.60 MB
BOQ_336757.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .