Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC | ₹2.4 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹2.6 Cr+₹17.9 L (7.40%)Rejected-Finance NAGLA VATOOL POST NARUPURA ATRAULI DISTRICT ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹2.6 Cr+₹17.9 L (7.40%) | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹2.6 Cr+₹18.8 L (7.79%)Rejected-Finance | ₹2.6 Cr+₹18.8 L (7.79%) | L3 | Rejected-Finance Higher than L1 |
| 4 | L4₹2.8 Cr+₹34.0 L (14.0%)Rejected-Finance ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | ₹2.8 Cr+₹34.0 L (14.0%) | L4 | Rejected-Finance Higher than L1 |
| 5 | L5₹2.8 Cr+₹40.8 L (16.9%)Rejected-Finance FLAT 1 21 A P SEN ROAD CHARBAGH LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹2.8 Cr+₹40.8 L (16.9%) | L5 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | VEERESH KUMAR L2 | SHOBHA ENTERPRISES L5 | M/S JAMEEL CONTRACTOR L3 | Mahesh Chandra Sharma L1 | S F INFRA PROJECTS L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | E/W in foundation in dry soil including lift upto 1.5 M and lead upto 30 M including back filling, watering and ramming of excavated earth or as directed by Engineer in charge. | 3,332 | Cum | 80 ₹2,66,560 | 50.12 ₹1,66,999.84 | 38 ₹1,26,616 Lowest | 40 ₹1,33,280 | 50 ₹1,66,600 |
| 2.00 | Laying 50 mm thick C.C. of M10 (1:3:6) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate in base including cost of all materials, labour charges, curing work, T&P etc. | 1,186 | Cum | 4,000 ₹47,44,000 | 4,908.56 ₹58,21,552.16 | 4,565 ₹54,14,090 | 3,800 ₹45,06,800 Lowest | 5,000 ₹59,30,000 |
| 3.00 | Centring &shuttering for C.C.Work I/C All Cost Of Labour T&P etc Comp. | 6,410 | Sqm | 300 ₹19,23,000 Lowest | 430.1 ₹27,56,941 | 427 ₹27,37,070 | 300 ₹19,23,000 Lowest | 300 ₹19,23,000 Lowest |
| 4.00 | Laying 75 mm thick C.C. lining of M20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc. | 2,851 | Cum | 6,000 ₹1,71,06,000 | 6,158.85 ₹1,75,58,881.35 | 5,680 ₹1,61,93,680 Lowest | 5,800 ₹1,65,35,800 | 6,200 ₹1,76,76,200 |
| 5.00 | Laying LDPE film including cost of all materials, labour charges, T&P etc. | 27,742 | Sqm | 50 ₹13,87,100 | 47.5 ₹13,17,745 | 27 ₹7,49,034 Lowest | 30 ₹8,32,260 | 50 ₹13,87,100 |
| 6.00 | E/W in filling for Restroration of both bank and top of for making slope of canal including lead upto 1 km and also i/c ramming dressing by manual or as directed by Engineer in charge | 4,480 | Cum | 100 ₹4,48,000 | 130 ₹5,82,400 | 170 ₹7,61,600 | 50 ₹2,24,000 Lowest | 100 ₹4,48,000 |
| 7.00 | Videography/Photography of canal before work, during the work and after compeletion of the work by DRONE i/c providing pen drive and vehicles for reaching to canal with direction of Engineer-in-charge. | 2.5 | Km | 1,500 ₹3,750 | 1,234.2 ₹3,085.5 | 7,000 ₹17,500 | 1,000 ₹2,500 Lowest | 1,000 ₹2,500 Lowest |
| 8.00 | Supplying of iron sign board size 1.20 x0.90 mt. with 16 gauge iron sheet 50x50x5 mmsize MS angle upto 3.00 mt. height i/c cost of materials & also including Erection and writing work . | 6 | No | 5,000 ₹30,000 | 5,569.16 ₹33,414.96 | 4,500 ₹27,000 | 1,000 ₹6,000 Lowest | 3,000 ₹18,000 |
| 9.00 | Finishing wall with acrylic smooth exterior paint (APEX) of required shade new work two or more coat applied include all labour,material and T&P etc complete | 387.5 | Sqm | 200 ₹77,500 | 90 ₹34,875 | 135 ₹52,312.5 | 80 ₹31,000 Lowest | 100 ₹38,750 |
Tender Value
₹3.8 Cr
EMD Value
₹7.6 L
Closing Date
5 Mar 2026, 5:00 pmClosed
Suprintending Engineer
Madhay Ganga Canal Consturction Circle Moradabad 244001
Construction of CC lining at Head/Cross regulator of Atrauli Dy. System (from Km 0.000 to Km 8.400) in District Bulandshahar
2026_UPIDC_1119077_1
02/SE/2025-26
Open Tender
Civil Works
Item Wise
120 days
Dibai
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹7.6 L
Yes
15 Apr 2026
23 Feb 2026
6 Mar 2026
23 Feb 2026
5 Mar 2026
23 Feb 2026
E/W in foundation in dry soil including lift upto 1.5 M and lead upto 30 M including back filling, watering and ramming of excavated earth or as directed by Engineer in charge.
Laying 50 mm thick C.C. of M10 (1:3:6) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate in base including cost of all materials, labour charges, curing work, T&P etc.
Centring &shuttering for C.C.Work I/C All Cost Of Labour T&P etc Comp.
Laying 75 mm thick C.C. lining of M20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc.
Laying LDPE film including cost of all materials, labour charges, T&P etc.
E/W in filling for Restroration of both bank and top of for making slope of canal including lead upto 1 km and also i/c ramming dressing by manual or as directed by Engineer in charge
Videography/Photography of canal before work, during the work and after compeletion of the work by DRONE i/c providing pen drive and vehicles for reaching to canal with direction of Engineer-in-charge.
Supplying of iron sign board size 1.20 x0.90 mt. with 16 gauge iron sheet 50x50x5 mmsize MS angle upto 3.00 mt. height i/c cost of materials & also including Erection and writing work .
Finishing wall with acrylic smooth exterior paint (APEX) of required shade new work two or more coat applied include all labour,material and T&P etc complete
stage.html
html • 0.05 MB
technical_2080446.pdf
techsummary_2080446.pdf
finance_2080446.pdf
BOQ Comparative Chart
xlsx
finsummary_2080446.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_2080446.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .