| Sl No | Description | Qty | Unit | Deep Enterprises |
|---|---|---|---|---|
| 1.01 | Polyhouse –Technical Specifications
1. Size & Shape
• Size: 40 feet × 60 feet
• Type: Arch-shaped polyhouse
• Center Height: 15 feet
• Side Height: 11 feet
2. Base / Foundation (Description)
1. Ground Preparation
• The land must be excavated, filled with at least 45 cm murrum, and leveled properly.
2. Pole Foundation
• Galvanized Iron (GI) pipes must be fixed in the ground using cement concrete.
• Hole size for each pole: 0.45 m × 0.45 m × 0.50 m deep.
• Distance between two poles should not be more than 3 meters.
3. Side Brick Wall
• A small brick wall of 20 cm height and 20 cm width should be built around the entire structure.
4. Center Path
• In the middle of the polyhouse, a path of interlocking pavement blocks should be made.
• Path size: 17.88 m × 1.50 m.
5. Plant Beds
• Beds should be built on both sides of the path.
• Beds should be made using brickwork and plastered.
• Beds should be placed at 90° (right angle) to the path.
• Each bed:
• Inner width: 1 meter
• Side wall height: 20 cm
• Distance between two beds: 35 cm (including sidewalls).
• The gap between two bed walls should be filled with M-20 cement concrete, and plaster should be done on all brickwork.
3. Structure (Simple Description)
1. Material
• Entire structure should be made from Galvanized Iron (GI) steel, hot-dip galvanized.
• Structure must follow IS 875 standard and withstand 120 km/h wind speed.
2. Poles and Pipes
• Main column GI pipes: 1.5 inch x 1.5 inch square pipes
• Arch base GI pipes: 1.5 inch x 1.5 inch square pipes
• Purlins: 1.5 inch x 1.5 inch square pipes
• Remaining structure pipes: 2 inch x 2 inch square pipes
• All GI pipes should be fixed into cement concrete in the ground.
3. Door
• 2 Aluminium frame doors with 6mm polycarbonate sheet. One door should be at front and the other at the back
4. Distance Between Columns
• Maximum 3 meters.
4. Cladding (Covering Materials)
1. Poly Film
• 200-micron UV-stabilized film
• More than 80% light transmission
• From a major/reputed brand
2. Insect Net
• 40-mesh insect net on both long sides
• Net height: from 1 meter above ground up to 2.5 meters
• Poly film in net area should be foldable to allow airflow.
3. Shade Net
• Shade-net curtains should be fixed inside the polyhouse to cover plant beds when needed.
5. Overhead Irrigation / Fogger System
• Hanging foggers with lateral pipes, supporting wire, and MS support frame.
• Fogger parts must be from a major/reputed brand.
• 1 HP pump should be provided.
• 1000-liter water tank for fogger supply. | 3 | Per unit rate required from bidder | 12,66,300 ₹12.7 L |
| 1.02 | Drip Irrigation System -
The project requires the setup of two independent systems:
• Site 1: Installation for 500 beds.
• Site 2: Installation for 100 beds.
• Scope of Work and Materials Required
Your quote must cover all labor, materials, and installation for the following requirements:
1. Bed Irrigation Setup (for all 600 beds):
• Bed Dimensions: 10 meters (length) x 0.15 meters (width) x 1.20 meters (height).
• Drip Lines: Four parallel drip line per bed, which may extend in length to consecutive beds. Emitter (dripper) spacing of drip lines should be 6 inch
• Fittings: All necessary 16mm pipes, O-rings, take-ups, and 16mm valves connecting to the main line.
2. Underground Main Supply Line:
• Pipe: 75mm diameter, 4-gauge PVC pipe.
• Installation: Pipe must be installed 1 meter below ground level.
• Total Length: Approximately 550 meters of underground piping across both sites
• Water Source Setup: Supply and installation of a 5000-liter water tank.
• Pumping: Supply and installation of a 5 HP motor.
• Filtration & Fertigation: Installation of a Screen Filter, a Sand Filter, and a Venturi injector system for fertilizer application.
4. Site 2 Specific Equipment (for 100 beds location):
• Water Source Setup: Supply and installation of a 1000-liter water tank.
• Pumping: Supply and installation of a 3 HP motor.
• Filtration & Fertigation: Installation of a Screen Filter, a Sand Filter, and a Venturi injector system for fertilizer application.
• Valves to be provided as per requirement for sectorwise irrigation | 600 | Pe bed rate required from bidder | 3,99,000 ₹4.0 L |
Tender Value
Refer Docs
EMD Value
₹63,000
Closing Date
11 Feb 2026, 4:00 pmClosed
DFO
CCF office, social forestry circle indore
Poly house construction and drip irrigation system construction work (including material)
2026_MPFD_478595_1
172
Open Tender
Miscellaneous Works
30 days
CCF office, social forestry circle indore
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹63,000
CCF office, social forestry circle indore
20 Feb 2026
29 Jan 2026
13 Feb 2026
29 Jan 2026
11 Feb 2026
29 Jan 2026
5 Feb 2026
Polyhouse –Technical Specifications 1. Size & Shape • Size: 40 feet × 60 feet • Type: Arch-shaped polyhouse • Center Height: 15 feet • Side Height: 11 feet 2. Base / Foundation (Description) 1. Ground Preparation • The land must be excavated, filled with at least 45 cm murrum, and leveled properly. 2. Pole Foundation • Galvanized Iron (GI) pipes must be fixed in the ground using cement concrete. • Hole size for each pole: 0.45 m × 0.45 m × 0.50 m deep. • Distance between two poles should not be more than 3 meters. 3. Side Brick Wall • A small brick wall of 20 cm height and 20 cm width should be built around the entire structure. 4. Center Path • In the middle of the polyhouse, a path of interlocking pavement blocks should be made. • Path size: 17.88 m × 1.50 m. 5. Plant Beds • Beds should be built on both sides of the path. • Beds should be made using brickwork and plastered. • Beds should be placed at 90° (right angle) to the path. • Each bed: • Inner width: 1 meter • Side wall height: 20 cm • Distance between two beds: 35 cm (including sidewalls). • The gap between two bed walls should be filled with M-20 cement concrete, and plaster should be done on all brickwork. 3. Structure (Simple Description) 1. Material • Entire structure should be made from Galvanized Iron (GI) steel, hot-dip galvanized. • Structure must follow IS 875 standard and withstand 120 km/h wind speed. 2. Poles and Pipes • Main column GI pipes: 1.5 inch x 1.5 inch square pipes • Arch base GI pipes: 1.5 inch x 1.5 inch square pipes • Purlins: 1.5 inch x 1.5 inch square pipes • Remaining structure pipes: 2 inch x 2 inch square pipes • All GI pipes should be fixed into cement concrete in the ground. 3. Door • 2 Aluminium frame doors with 6mm polycarbonate sheet. One door should be at front and the other at the back 4. Distance Between Columns • Maximum 3 meters. 4. Cladding (Covering Materials) 1. Poly Film • 200-micron UV-stabilized film • More than 80% light transmission • From a major/reputed brand 2. Insect Net • 40-mesh insect net on both long sides • Net height: from 1 meter above ground up to 2.5 meters • Poly film in net area should be foldable to allow airflow. 3. Shade Net • Shade-net curtains should be fixed inside the polyhouse to cover plant beds when needed. 5. Overhead Irrigation / Fogger System • Hanging foggers with lateral pipes, supporting wire, and MS support frame. • Fogger parts must be from a major/reputed brand. • 1 HP pump should be provided. • 1000-liter water tank for fogger supply.
Drip Irrigation System - The project requires the setup of two independent systems: • Site 1: Installation for 500 beds. • Site 2: Installation for 100 beds. • Scope of Work and Materials Required Your quote must cover all labor, materials, and installation for the following requirements: 1. Bed Irrigation Setup (for all 600 beds): • Bed Dimensions: 10 meters (length) x 0.15 meters (width) x 1.20 meters (height). • Drip Lines: Four parallel drip line per bed, which may extend in length to consecutive beds. Emitter (dripper) spacing of drip lines should be 6 inch • Fittings: All necessary 16mm pipes, O-rings, take-ups, and 16mm valves connecting to the main line. 2. Underground Main Supply Line: • Pipe: 75mm diameter, 4-gauge PVC pipe. • Installation: Pipe must be installed 1 meter below ground level. • Total Length: Approximately 550 meters of underground piping across both sites • Water Source Setup: Supply and installation of a 5000-liter water tank. • Pumping: Supply and installation of a 5 HP motor. • Filtration & Fertigation: Installation of a Screen Filter, a Sand Filter, and a Venturi injector system for fertilizer application. 4. Site 2 Specific Equipment (for 100 beds location): • Water Source Setup: Supply and installation of a 1000-liter water tank. • Pumping: Supply and installation of a 3 HP motor. • Filtration & Fertigation: Installation of a Screen Filter, a Sand Filter, and a Venturi injector system for fertilizer application. • Valves to be provided as per requirement for sectorwise irrigation
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
td.pdf
Tender Documents • 2.70 MB
BOQ_562513.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid