Public Works Department
Repair work of the cross culvert damaged due to heavy rain at km 5.50 of Kadanga bavali Yadapala Cheyyandane road and construction of Approach road to the bridge at km 4.05 in Madikeri Taluk
PWD/2025-26/BR/WORK_INDENT32110/CALL-3
PWD/2025-26/BR/WORK_INDENT32110/CALL-3
Open
Bridges/Culverts
PWD Division Office Kodagu
4 documents required · 4 mandatory
₹530
₹50,000
18 Feb 2026
11 Feb 2026
16 Feb 2026
Repair work of the cross culvert damaged due to heavy rain at km 5.50 of Kadanga bavali Yadapala Cheyyandane road and construction of Approach road to the bridge at km 4.05 in Madikeri Taluk
1.14.1 Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru... 96.40 m³
2.1.3 Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ... 4.26 m³
2.4.3 Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro... 6.96 m³
2.4.3 Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro... 15.20 m³
2.11.h Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,... 1.44 t
12.4 Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of ... 14.28 m³
16.8.b Surface Drains in Soil - Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated mate... 400.00 m
1.8 Manual Means -
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta... 1032.19 m³
4.1.A.v Granular Sub-Base - Plant Mix Method - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material... 116.00 m³
4.17 Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ... 173.99 m³
10.15.i Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The ... 1229.25 m²