| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.6 LAccepted-AOC | L1 | Accepted-AOC Accept |
Tender Value
₹29.5 L
EMD Value
₹29,500
Closing Date
7 Mar 2024, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
The Commissioner, Coimbatore Corporation
Renewal of UGD pipe Line, Raising and Reconstruction of UGD chamber at Thirumal Street in ward No. 82 Central Zone
2024_MAWS_425789_35
E10/2024
Open Tender
Civil Works
Works
120 days
Coimbatore corporation-
As per the tender condition attached
3 documents required · 3 mandatory
₹0
₹29,500
21 May 2024
16 Feb 2024
8 Mar 2024
16 Feb 2024
7 Mar 2024
16 Feb 2024
Amount
1.Providing BT road cutting for pipe line as per the direction of departmental officers etc., Complete
2. Providing CC Road Cutting for pipe line as per the direction of departmental officers etc., Complete
3.Dismantling the Existing damaged R.C.C slab as per the direction of departmental officers etc., Complete
4. Dismantling the Existing damaged PCC as per the direction of departmental officers etc., Complete
5.Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 cum. in volume including rough dressing and dumping the excavated materials away from work site manually within 10m initial lead and 2m initial lift as per the direction of Engineer-in-charge.
6.Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted etc., complete complying with standard specification.
7.Supplying and laying of Stone ware pipe including necessary jointing materials link, cement etc. complete for 230 mm dia pipe.
8.Supplying and erecting SHUTTTERING including necessary supports for plane surfaces such as Vertical walls etc, using mild steel sheets of size 90cm X 60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed.
9.Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of allmaterials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
10.PLASTERING with cement mortar 1:5(one cement and five sand by volume) 12mm thick for all internal/external surfaces like super structure, rainwater, ducts, elevation in all floors complying with standard specifications.
11.Supplying and erecting CENTERING for sides and sofits including supports and strutting up to 3.29 m high for plane surfaces such as RCC SLABS, with all cross bracings using mild steel sheets of size 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25mm * 25mm * 3mm for boarding laid over country wood joists of size 10cm X 6.50cm spaced at about 90cm centre to centre and supported by Casuarinas props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete and as directed.
12.Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification.
13.Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing, vibrator charges etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete.
14.Supplying and fixing of 750 mm dia - Extra Heavy Duty Circular complete as per the directions of departmental officer.
15.Refilling with excavated earth including watering and ramming and making the surface to the existing ground level.
16.Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .