| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance | L1 | Accepted-Finance Accept | |
| 2 | L2₹4.9 L+₹1,478.15 (0.30%)Rejected-Finance | L2 | Rejected-Finance Above Estimate |
| Sl No | Description | Qty | Unit | ARUN SUBAM L1 | RK CONSTRUCTION AND CONSULTANT L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 270 | cum | 205.5 ₹55,485 Lowest | 206 ₹55,620 |
| 2.00 | Supply and delivery of HDPE(PN8)/DI Pipes and specials including cost and conceyance of all materials to Town Panchayat office labour charges for loading and unloading all other incidental charges therefore etc., complete.140mm HDPE pipe PE 100 (PN/8) | 450 | Rm | 737 ₹3,31,650 Lowest | 738 ₹3,32,100 |
| 3.00 | 125mm Sluice Valve | 2 | Nos | 8,756.7 ₹17,513.4 Lowest | 8,758 ₹17,516 |
| 4.00 | 140mm HDPE Bend (PN/8) | 3 | Nos | 787.15 ₹2,361.45 Lowest | 789 ₹2,367 |
| 5.00 | 140mm HDPE Tee (PN/8) | 2 | Nos | 924.5 ₹1,849 Lowest | 926 ₹1,852 |
| 6.00 | Laying of PVC /HDPE Pipe and specials with proper gradient and cost of all tools and plants rental charges for the machineries including all other incidental charges therefore etc., complete
140mm HDPE pipe PE 100 | 450 | Rm | 26.25 ₹11,812.5 Lowest | 27 ₹12,150 |
| 7.00 | Testing of pipes for water supply with hydraulic testing equipment by filling with water (including cost of water) and testing to recommended pressure in convenient stretches and attending the bursts if any occured during the test,
excluding the cost of pipes but including other incidential and operational charges etc., complete for the following diametres of pipes. | 450 | Rm | 89.1 ₹40,095 Lowest | 90 ₹40,500 |
| 8.00 | Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board Officers. | 90 | Joint | 280.5 ₹25,245 Lowest | 281 ₹25,290 |
| 9.00 | Refilling the excavated earth in all classes of soil such as hard stiff clay, light black cotton, shalles, muram except hard rock including all charges etc., complete for pipe line | 270 | cum | 26.15 ₹7,060.5 Lowest | 26.5 ₹7,155 |
Tender Value
₹6.1 L
EMD Value
₹6,100
Closing Date
15 Sept 2025, 3:00 pmClosed
Executive Officer
Town Panchayat Rayagiri
Water supply pipeline work at ward 14 Kamarajar street in Rayagiri Town Panchayat.
2025_DTP_602117_1
129-2/2025
Open Tender
Civil Works - Water Works
Works
180 days
Rayagiri Town Panchayat
IV
2 documents required · 2 mandatory
₹0
₹6,100
Yes
18 Sept 2025
9 Sept 2025
15 Sept 2025
9 Sept 2025
15 Sept 2025
9 Sept 2025
9 Sept 2025 - 15 Sept 2025
Amount
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications.
Supply and delivery of HDPE(PN8)/DI Pipes and specials including cost and conceyance of all materials to Town Panchayat office labour charges for loading and unloading all other incidental charges therefore etc., complete.140mm HDPE pipe PE 100 (PN/8)
125mm Sluice Valve
140mm HDPE Bend (PN/8)
140mm HDPE Tee (PN/8)
Laying of PVC /HDPE Pipe and specials with proper gradient and cost of all tools and plants rental charges for the machineries including all other incidental charges therefore etc., complete 140mm HDPE pipe PE 100
Testing of pipes for water supply with hydraulic testing equipment by filling with water (including cost of water) and testing to recommended pressure in convenient stretches and attending the bursts if any occured during the test, excluding the cost of pipes but including other incidential and operational charges etc., complete for the following diametres of pipes.
Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by TWAD Board Officers.
Refilling the excavated earth in all classes of soil such as hard stiff clay, light black cotton, shalles, muram except hard rock including all charges etc., complete for pipe line
RK CONSTRUCTION AND CONSULTANT (BID ID -1458669)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_719807.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .