Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | ₹10.1 L | L1 | Accepted-AOC Qualified in AOC |
| 2 | L2₹10.4 L+₹28,994.59 (2.88%)Rejected-AOC | ₹10.4 L+₹28,994.59 (2.88%) | L2 | Rejected-AOC Qualified in AOC |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
| Sl No | Description | Qty | Unit | BHARATHI L2 | R DEVAN L1 |
|---|---|---|---|---|---|
| 1.00Name of Work:Providing Cement Concrete Pavement in Vadapttinam Irular Pagudhi at Vadapattinam Panchayat Lathur Panchayat Union. | |||||
| 2.00 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth as per SS 20B | 19.8 | Rm | 134 ₹2,653.2 | 132 ₹2,613.6 Lowest |
| 3.00 | Centering Materials for Concrete works using mild steel sheets with supports including all cost and conveyance of all materials etc.complete | 264 | Rm | 338 ₹89,232 | 330 ₹87,120 Lowest |
| 4.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering including all labour charges etc.complete. | 40.7 | Rm | 5,615 ₹2,28,530.5 | 5,454 ₹2,21,977.8 Lowest |
| 5.00 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering including all labour charges etc.complete. | 59.81 | Rm | 7,058 ₹4,22,138.98 | 6,855 ₹4,09,997.55 Lowest |
| 6.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method including all etc., | 82.23 | Nos | 1,638 ₹1,34,692.74 | 1,593 ₹1,30,992.39 Lowest |
| 7.00 | Providing Bituminous Pad including cost and conveyance of all labourcharges etc.complete | 5.12 | Nos | 225 ₹1,152 | 220 ₹1,126.4 Lowest |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 1,58,111.9 ₹1,58,111.9 | 1,53,688.99 ₹1,53,688.99 Lowest |
Tender Value
₹10.2 L
EMD Value
₹11,000
Closing Date
9 Sept 2025, 3:00 pmClosed
The Block Development Officer BP
Panchayat union office Building Lathur at Pavunju
Providing Cement Concrete Pavement in Vadapttinam Irular Pagudhi at Vadapattinam Panchayat Lathur Panchayat Union.PUGF/2025/26 Estimate.10.20 Lakhs
2025_RDTN_600305_1
Tender reference No.1010/2025/A6 ADP Date.02.09.2025
Open Tender
Civil Works
Item Rate
Providing Cement Concrete Pavement in Vadapttinam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,000
11 Sept 2025
4 Sept 2025
9 Sept 2025
4 Sept 2025
9 Sept 2025
4 Sept 2025
Amount
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth as per SS 20B
Centering Materials for Concrete works using mild steel sheets with supports including all cost and conveyance of all materials etc.complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering including all labour charges etc.complete.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering including all labour charges etc.complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method including all etc.,
Providing Bituminous Pad including cost and conveyance of all labourcharges etc.complete
GST Amount for providing Service to Government Contract Works for the above Construction Works.{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
BHARATHI (BID ID -1451287)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .