Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAccepted-Finance | ₹3.6 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹4.8 Cr+₹1.2 Cr (34.5%)Accepted-Finance | ₹4.8 Cr+₹1.2 Cr (34.5%) | L2 | Accepted-Finance Accepted |
| 3 | L3₹4.9 Cr+₹1.3 Cr (36.5%)Accepted-Finance | ₹4.9 Cr+₹1.3 Cr (36.5%) | L3 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | PAUL AND COMPANY L3 | M/s M S BUILDERS L1 | MS RAKSHA CONSTRUCTION CO. L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundations, trenches etc. In all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches , stacking the excavated soil clear from the edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including diposal of all surplus soil as directed within a lead of 30 metres. | 4,698.14 | Cum | 210 ₹9,86,609 | 159 ₹7,47,004 Lowest | 162.5 ₹7,63,448 |
| 2.00 | Earth filling Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres | 1.89 | Cum | 72 ₹136 | 50 ₹95 Lowest | 56.25 ₹106 |
| 3.00 | Dismantling brick work tile, masonry or tile lining : In cement . | 204.09 | Cum | 790 ₹1,61,231 | 600 ₹1,22,454 Lowest | 608.93 ₹1,24,277 |
| 4.00 | Dismantling Cement concrete plain1:2:4 mix . | 14.72 | Cum | 1,583 ₹23,302 | 1,181 ₹17,384 Lowest | 1,218.75 ₹17,940 |
| 5.00 | Dismantling Cement concrete Reinforced cement concrete | 134.85 | Cum | 2,557 ₹3,44,811 | 1,869.67 ₹2,52,125 Lowest | 1,967.86 ₹2,65,366 |
| 6.00 | Dismantling roofing Second class mud roofing | 400.5 | Sqm | 65 ₹26,033 | 38 ₹15,219 Lowest | 50 ₹20,025 |
| 7.00 | Dismantling cement conglomerate floors 25mm to 50mm thick including concrete base. | 453 | Sqm | 126 ₹57,078 | 90.25 ₹40,883 Lowest | 97.32 ₹44,086 |
| 8.00 | Scraping Bricks dismantled from brick work in lime or cement. | 58.78 | Per 1000 Nos. | 1,833 ₹1,07,738 | 1,300 ₹76,410 Lowest | 1,410.71 ₹82,917 |
| 9.00 | Removing doors and windows together with the dismantling of walls Doors | 11 | Each | 133 ₹1,463 | 80 ₹880 Lowest | 105.36 ₹1,159 |
| 10.00 | Removing doors and windows together with the dismantling of walls Windows | 15 | Each | 91 ₹1,365 | 61 ₹915 Lowest | 70.54 ₹1,058 |
Tender Value
₹3.9 Cr
EMD Value
₹7.7 L
Closing Date
23 Apr 2026, 3:00 pmClosed
Sr. Xen, Civil Works Division, PSTCL, Jalandhar.
Room No. 301, Shakti Sadan, Jalandhar.
Construction of all technical civil works for up-gradation of 66 kV S/S Chitti to 220 kV.
2026_POWER_161958_1
CWJ/T-21/2025-26
Open Tender
Civil Works
Tender cum Auction
425 days
at 66 kV S/S Chitti.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹7.7 L
Yes
30 Jun 2026
26 Feb 2026
24 Apr 2026
26 Feb 2026
23 Apr 2026
26 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundations, trenches etc. In all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches , stacking the excavated soil clear from the edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including diposal of all surplus soil as directed within a lead of 30 metres. | 4,698.14 | Cum | 162.5 | ₹7,63,447.75 |
| 2 | Earth filling Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres | 1.89 | Cum | 56.25 | ₹106.31 |
| 3 | Dismantling brick work tile, masonry or tile lining : In cement . | 204.09 | Cum | 608.93 | ₹1,24,276.52 |
| 4 | Dismantling Cement concrete plain1:2:4 mix . | 14.72 | Cum | 1,218.75 | ₹17,940 |
| 5 | Dismantling Cement concrete Reinforced cement concrete | 134.85 | Cum | 1,967.86 | ₹2,65,365.92 |
| 6 | Dismantling roofing Second class mud roofing | 400.5 | Sqm | 50 | ₹20,025 |
| 7 | Dismantling cement conglomerate floors 25mm to 50mm thick including concrete base. | 453 | Sqm | 97.32 | ₹44,085.96 |
| 8 | Scraping Bricks dismantled from brick work in lime or cement. | 58.78 | Per 1000 Nos. | 1,410.71 | ₹82,917.54 |
| 9 | Removing doors and windows together with the dismantling of walls Doors | 11 | Each | 105.36 | ₹1,158.96 |
| 10 | Removing doors and windows together with the dismantling of walls Windows | 15 | Each | 70.54 | ₹1,058.1 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.76 MB
TC.pdf
Tender Documents • 2.98 MB
TCAR.pdf
Tender Documents • 0.34 MB
TECHSPEC1.pdf
Tender Documents • 9.95 MB
TECHSPEC2.pdf
Tender Documents • 19.10 MB
DNIT.pdf
Tender Documents • 29.19 MB
BOQ_328120.xls
BOQ • 0.41 MB
Corr3.pdf
PDF • 0.23 MB
Corr2.pdf
PDF • 0.23 MB
CorrigendumforChitti.pdf
PDF • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .