Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance SF NO 337 2 NO 15 NARANAPURAM VILLAGE PONNANDAMPALAYAM THENNAMPALAYAM COIMBATORE TAMIL NADU 641659 | COIMBATORE | TAMIL NADU | 641659 | Admitted-Finance |
| 2 | Rejected-Technical 285 2 PANCHRATNA ESTATE NR RAMOL BRIDGE VATVA AHMEDABAD GUJARAT 382345 | AHMADABAD | GUJARAT | 382345 | Rejected-Technical Not complied MR requirement |
| 3 | Rejected-Technical A 34 35 MIDC INDUSTRIAL H BLOCK PIMPRI PUNE MAHARASHTRA 411018 | PUNE | MAHARASHTRA | 411018 | Rejected-Technical Not complied MR requirement |
Tender Value
Refer Docs
Closing Date
27 Aug 2020, 12:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Mr.Puneet Khanna (Head-Supply Chain Management)
Worley India Private Limited, New Energy House,RamakrishnaMandir Road, Kondivita, Andheri (East), Mumbai-400 059, India
HP STEAM DESUPERHEATER
2020_REFHQ_121233_1
44AC7500-00-ER-64-0005
Limited
Instrumentation-Goods
Supply
180 days
IOCL PANIPAT, HARYANA INDIA
NOT APPLICABLE
3 documents required · 3 mandatory
Exempted
27 Nov 2020
30 Jul 2020
28 Aug 2020
30 Jul 2020
27 Aug 2020
13 Aug 2020
120 days
IBR III-C CERTIFIED DESUPERHEATER WITH BFW CONTROL VALVE AND SAFETY VALVES
DESUPERHEATER 201-ME2R WITH FLANGED END CONNECTION (QTY. 1 No.) GLOBE CONTROL VALVE 201-TV-1505 (QTY. 1 No.) PRESSURE SAFETY VALVE 201-PSV-6A / 201-PSV-6B (QTY 2NOS.) Strainer 2” Body, Carbon Steel (QTY 1No)
DESUPERHEATER 208-ME2R WITH FLANGED END CONNECTION (QTY. 1 No.) GLOBE CONTROL VALVE 208-TV-1401 (QTY.1 No.) PRESSURE SAFETY VALVE 208-PSV-9A / 208-PSV-9B (QTY.2NOS) Strainer 1 1/2” Body, Carbon Steel (QTY 1No)
DESUPERHEATER 209-ME1R WITH FLANGED END CONNECTION (QTY. 1 No.) GLOBE CONTROL VALVE 209-TV-0504 (QTY. 1 No.) PRESSURE SAFETY VALVE 209-PSV-7A / 209-PSV-7B (QTY.2NOS.) Strainer 1 ” Body, Carbon Steel (QTY 1No)
DESUPERHEATER 209-ME2N WITH FLANGED END CONNECTION (QTY. 1 No.) GLOBE CONTROL VALVE 209-TV-1011 (QTY. 1No.) PRESSURE SAFETY VALVE 209-PSV-51A / 209-PSV-51B (QTY2Nos.) Strainer 1 ” Body, Carbon Steel (QTY 1No)
CHARGES FOR SITE SUPERVISION OF ERECTION,PRE-COMMISSIONING / COMMISSIONING OF ALL SUPPLIES AS PER MR. Refer Annexure-F of ITB for Terms & conditions for Site Supervision Services and Training for Indian bidders. For Tag No. 201-ME2R, 208-ME2R, 209-ME1R & 209-ME2N :: 5 Man Days for each tag Total 20 Mandays estimated for site supervision of Erection, Testing & Commissioning.
Per diem charges (per person) for 8 hours work on normal working days.
Overtime rate / hour beyond normal 8 hours work on normal working days.
Overtime rate / hour for work on weekly off days/ holidays (as applicable to Refinery site).
Description of Work / Item(s)
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.01 OF BOQ1
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.02 OF BOQ1
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.03 OF BOQ1
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.04 OF BOQ1
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .