| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.8 LAdmitted-Fee/PreQual/Technical/Finance | -19.71% | ₹10.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹10.9 L+₹12,634.73 (1.17%)Admitted-Fee/PreQual/Technical/Finance | -18.77% | ₹10.9 L+₹12,634.73 (1.17%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹11.3 L+₹50,001.27 (4.63%)Admitted-Fee/PreQual/Technical/Finance | -15.99% | ₹11.3 L+₹50,001.27 (4.63%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹13.4 L
EMD Value
₹26,880
Closing Date
26 May 2026, 6:00 pmClosed
Executive Engineer
Executive Engineer Water Resources Dn Chittorgarh
Hiring of JCB, Supplying of EC bag, Unskilled labour,Oil Greasing etc. for various dams Transferd from Panchayati raj Department during rainy season Under jurisdiction of sub div Begun, chittorgarh for year 2026-27
2026_WRDAS_560244_1
NIT No 3 Year 2026-27 Work 10
Open Tender
Civil Works
Percentage
180 days
Chittorgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer Water Resources Dn
₹26,880
Yes
27 May 2026
18 May 2026
27 May 2026
19 May 2026
26 May 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying of well stitiched earth filled bags of capacity, weigh not less than 40 kg per bag at site etc. complet (Plastic Bags) | - | P Each | 16 | - |
| 2 | Labour charges for making coffer dam/ring bund( under flowing /stagnate water pool) by loading transporting earth filled cement bags dropping at required locations in water including all leads up to 3km and lift up to 8 meter from NSL complete (excluding cost of earth filled cement begs). | - | P Each | 26 | - |
| 3 | Unskilled Beldar/ Coolie/ Chowkidar/water man / Earth dresser. | - | P Day | 300 | - |
| 4 | Hydraulic excavator/ loader like JCB/Poclain, Hitachi etc. with all accessories (for actual site working, idle period) having bucket capacity up to 0.40 cum Hire charges without diesel but with operation staff M.oil, spares & lubricants (in Rs) without GST / profit | - | P hrs | 504.4 | - |
| 5 | Cost of Diesel for JCB | - | P Lit | 90.92 | - |
| 6 | Painting standard type gauge with black , red and white un-washable paints including cost of material | - | P R.M | 210 | - |
| 7 | Oiling, Greasing work of gate parts like Headstock, Headstock parts, Roller Assembly, Operating Rod, Sealing Frame, Guide Tee with all Labor tools and tackles etc. and Material for vertical lifts liding type/fix wheel gates excluding cardium compund and gear oil .
For gate size up to 1.0 m to 1.0 m | - | P Each | 1,405.08 | - |
| 8 | Cutting & clearance of jungle, bushes, shrubs Ankara/ Ipomoea, Juliflora typna etc. on canals and bunds in dry/moist /slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting (Thick) | 0.29 | P Sqm | 2.5 | ₹0.73 |
| 9 | Earth work in rough (borrow area) excavation for embankment in hard soil, Morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted bi vibro compactor, vibro sheep foot roller, sheep foot roller/ pnematic tyred roller to obtain dry density of at least 98 % of standard proctor's density with lift of 1.5m (excluding charges for compaction and watering), including loading and un-loading wherever required complete in all respect with lead beyond 250 m and up to 750 m(1/2)km b Deduct in item no 16 (a) to (d) above if Standard Proctor's density to be achived is at least 90% | - | P Cum | 97.5 | - |
| 10 | Providing, Fabrication, machining with straightening work of Guide Tee, Track, Sealing frame, Leaf frame or any part of gate's, complete as per drawing with testing, including cost of all materials, with machinery, labour, tools and tackles cutting, aligning, welding, finishing, cleaning etc., applying one coat of zinc rich epoxy primer and two coats of cold applied coal tar epoxy paint, etc., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding, transportation charges for structural steel components and other materials. Rate of work with all materials | - | P Kg | 113.56 | - |
stage.html
html • 0.02 MB
finance_997261.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.34 MB
Agreement.pdf
Tender Documents • 6.51 MB
BOQ_997261.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .