Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC RAKH RAJ PURA PARMANDAL MORB BIRPUR BARI BRAHMNA SAMBA JAMMU AND KASHMIR 181133 | BARI BRAHMNA | SAMBA | JAMMU AND KASHMIR | 181133 | ₹2.5 Cr | L1 | Accepted-AOC BEING L1 |
| 2 | L2₹2.6 Cr+₹9.0 L (3.59%)Rejected-Finance INDUSTRIAL ESTATE PHASE III KHONMAH SRINAGAR | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | ₹2.6 Cr+₹9.0 L (3.59%) | L2 | Rejected-Finance BEING L2 |
| 3 | L3₹2.9 Cr+₹36.5 L (14.6%)Rejected-Finance LANE NO 8 PHASE I IGC SAMBA JAMMU AND KASHMIR 184121 | SAMBA | SAMBA | JAMMU AND KASHMIR | 184121 | ₹2.9 Cr+₹36.5 L (14.6%) | L3 | Rejected-Finance BEING L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical REQD DOCUMENTS NOT PROVIDED BY THE SELLER AND ADM REASONS |
| 5 | Rejected-Technical | - | - | Rejected-Technical REQD DOCUMENTS NOT PROVIDED BY THE SELLER |
Tender Value
Refer Docs
EMD Value
₹5.4 L
Closing Date
28 Apr 2025, 9:00 amClosed
OC, 423 (I) ENGR SQN
423 (I) ENGR SQN PIN-913423 C/O 56 APO
SUPPLY AND CONSTRUCTION OF STORE SHELTER
2025_ARMY_703641_1
1266/15/2025-26
Open Tender
Construction Works
Lump-sum
150 days
350 KM RADIUS FROM KARU, LADAKH
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹0
₹5.4 L
CHONGTASH
11 May 2025
5 Apr 2025
28 Apr 2025
5 Apr 2025
28 Apr 2025
19 Apr 2025
9 Apr 2025
Laying and Jointing PVC Pipe. Heading
Supply and Construction of STORE SHELTERS S AND C Specification attached as RFP
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .