Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.0 LAdmitted-Finance MUMBAI THANE MAHARASHTRA | ₹67.0 L | L1 | Admitted-Finance |
| 2 | L2₹70.1 L+₹3.1 L (4.66%)Admitted-Finance | ₹70.1 L+₹3.1 L (4.66%) | L2 | Admitted-Finance |
| 3 | L3₹71.8 L+₹4.9 L (7.27%)Admitted-Finance ROMA BANJARA TANDA CHS BLDG NO 1 ROOM NO 507 607 MANKHURD W MUMBAI 400043 | MUMBAI | MUMBAI | MAHARASHTRA | 400043 | ₹71.8 L+₹4.9 L (7.27%) | L3 | Admitted-Finance |
| 4 | L4₹73.1 L+₹6.1 L (9.14%)Admitted-Finance BLDG NO 8 A FLAT NO 205 ROMA BANJARA TANDA C H S LTD MANKHURD W MUMBAI 400 043 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400043 | ₹73.1 L+₹6.1 L (9.14%) | L4 | Admitted-Finance |
| 5 | L5₹77.7 L+₹10.7 L (16.0%)Admitted-Finance ROMA BANJARA TANDA CHS BUILDING NO 1 ROOM NO 506 MANKHURD W MUMBAI 400 043 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400043 | ₹77.7 L+₹10.7 L (16.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S A.M CONSTRUCTIONS L3 | OM NILKANTHA CONSTRUCTION L2 | SUNIL CONSTRUCTION L5 | Kunal Construction L1 | S.B.Pawar Sairam Contractors L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Dismantling old ceiling plaster carefully and cleaning the surface for plaster including scaffolding, disposal of rubbish to the dumping ground within 100 m lead, cutting of 2nos. of 10 mm M.S. Rod per Sq.m. if required etc. complete including protecting the permanently fixed laboratory equipments, other equipments, fragile materials etc. while dismantling. After dismantling and disposing the rubbish, providing and applying white cement based wall putty over concrete or Plastered surface minimum 3 mm and up to 6 mm thick including cleaning complete all as directed by the Project Engineer. Notes: 1. Fan coil units, fixed equipments in lab etc. to be covered with tarpolene/plastic cover. 2. While dismantling plywood platforms should be fixed on the scaffolding to protect the underlying equipments. This item includes bringing dismantled debris/rubbish from all the floors to the dumping ground within 100 m lead. Dismantling of plastering should be done by chiselling and mechaical means without damaging the RCC. | ||||||||
| 1.10 | For ceiling height up to 4m above FFL | 225 | SqM | 550 ₹1,23,750 | 100 ₹22,500 Lowest | 600 ₹1,35,000 | 160 ₹36,000 | 180 ₹40,500 |
| 1.20 | For ceiling height beyond 4 m and up to 7m above FFL | 50 | SqM | 600 ₹30,000 | 100 ₹5,000 Lowest | 650 ₹32,500 | 250 ₹12,500 | 500 ₹25,000 |
| 1.30 | For ceiling height beyond 7 m and up to 10m above FFL | 110 | SqM | 700 ₹77,000 | 100 ₹11,000 Lowest | 700 ₹77,000 | 300 ₹33,000 | 700 ₹77,000 |
| 2.00 | Providing and applying two coats of anti-carbonation paint of approved colour and shade of approved manufacturers on concrete surfaces including scafolding (ceilings, beams, columns etc.) | 2,214 | SqM | 155 ₹3,43,170 | 225 ₹4,98,150 | 210 ₹4,64,940 | 150 ₹3,32,100 Lowest | 160 ₹3,54,240 |
| 3.00 | Structural repairs works with pre-packed dual shrinkage controlled (volume stable in wet & hardened state), single-component ready-to-use, structural grade high build, alkali-resistant, fibre?reinforced, thixotropic polymer modified repair mortar having excellent bond strength to old damaged concrete structures / surfaces by the following process: 1) Removal of loose/spalled or damaged concrete by chipping and cleaning the concrete surface to open up to 20mm behind the reinforcement steel with wire brush and with clean water including removal of dirt, paint, wax, oil, grease, laitance, foreign substances, etc.Mechanically profile and prepare concrete surfaces by abrasive blasting, waterjetting or other engineer approved methods 2) Cleaning the rebars with Acetone for complete rust removal and washing with water to make the surface clean. Ensure that the concrete substrate and ambient temperatures are between (10°C and 35°C) before application 3) Applying protective coat / bond coat using Styrene Butadiene Rubber (SBR) polymer and cement in the proportion of 1: 1 (1 part of polymer : 1 parts of cement). 4) Mixing full 25 Kg bag with clean potable water in water to product ratio of 0.12 to 0.18), mixed by heavy-duty slow speed (300 to 600 rpm) drill with spiral mixing paddle or forced action pan mixer pan for 3 minutes to achieve uniform lump free mortar consistency. 5) Applying polymer modified mortar with trowel & float. The polymer modified mortar shall have the following properties/technical parameters. A) Properties / technical parameters of pre-packed Polymer Modified Mortar: i) Compressive strength 1 day: Min. 20 MPa (as per BS:6319 : Part 2) ii) Compressive strength 7 days: Min. 35 MPa (as per BS:6319 : Part 2) iii) Compressive strength 28 days: Min. 45 MPa (as per BS:6319 : Part 2) iv) Flexural strength in 28 days: Min. 7 Mpa (as per BS:6319 : Part 3) v) Tensile strength in 28 days: Min. 2.5 MPa (as per BS:6319 : Part 7) vi) Bond strength: Min. 5 MPa (as per ASTM : C881) vii) Water permeability: less than 1% (as per ASTM : C881) viii) Drying shrinkage in 28 days: less than 1000 microstrain (as per ASTM C 157-93) ix) Potential Alkali Reactivity - : <0.1% Expansion % ( ASTM C1260). (B) Properties / technical parameters of SBR polymer bond coat material: i) Meets the requirements of BS 6319 part 2:1983 & ASTM C 190-85 standards ii) Total solids % by mass at 105oC: 38 + 1 iii) pH value: 7.5 to 9.5 iv) Specific gravity at 27.5oC: 1 to 1.05 v) Coverage: 4.2 - 4.5 sq.m/kg per coat Notes:- (a)Placing and finishing the same with trowel / hand packing carefully compacting the same around the rebars and finishing to bring it in line with existing concrete surface on the beams, slabs, columns, etc. (b) If thickness of repair exceeds 20mm , after every 20 mm thick repair, bond coat as per process no. (3) mentioned above in the BOQ item, to be applied and further thickness of repair to be continued for each layer. (c) The surface preparation & method of application shall be as per manufacturer's technical data sheet. (d) The double tubular steel scaffolding will be paid separately in relevant item. (e) Sampling and testing of cube specimen for compressive strength test shall be as per BS 6319 - Part-2.Other tests mentioned above shall be carried out if required as per the direction of the EIC and the cost of which shall be deemed to be included in the quoted rate (f) For each batch of mortar mixed, following records, i.e Quantity of mortar (kg) mixed, Amount of water added to the mix, Location of application and the area covered.(g) Payment will be paid on the basis of actual consumption of PMM & Reinforcement will be paid in the relevant item. (h) Curing like mist spraying the surface with water or using damp burlap or hessain cloth shall be done.Replacement of old rebars in case of reduction in diametre shall be done in consultation with EIC before applying repair mortar. (i) Safety Precuations:- Use wear tight-fitting, dust-resistant, chemical splash goggles and dust respirator, if airborne dust is generated, wear protective rubber hand gloves, wear appropriate clothing to prevent any possibility of skin contact. The above item of work is inclusive of all materials, labour, machinery, tools & tackels, consumables, trasportation, loading & unloading, safety PPEs etc. all complete as directed by Engineer-in-charge at site using approved pre-packed polymer modified mortar suitable for structural repair works. | 500 | Kg | 60 ₹30,000 | 250 ₹1,25,000 | 40 ₹20,000 Lowest | 50 ₹25,000 | 200 ₹1,00,000 |
| 4.00Providing Reinforcement Steel for reinforced cement concrete at all levels including supplying, preparation of bar bending schedules, cutting, bending, transporting, fixing, tieing in position with PVC coated G.I binding wire, all labour charges, cost of cover blocks in specified grade of concrete etc. complete as per specifications and drawings. Steel supplied by the contractor | ||||||||
| 4.10 | Using TMT bars of specified grades all dia bars. TMT bars to be supplied by the contractor confirming to IS:1786. | 0.2 | MT | 99,999 ₹19,999.8 | 1,75,000 ₹35,000 | 90,000 ₹18,000 Lowest | 90,000 ₹18,000 Lowest | 1,00,000 ₹20,000 |
| 5.00 | Providing 15mm thick plastering using Ready mix internal plastering compound of approved quality for internal faces of brickwork/ concrete surfaces including preparation of the surface, curing, cleaning, scaffolding complete all as per specifications and as directed at site by the Engineer-in -charge. | 100 | SqM | 499 ₹49,900 Lowest | 500 ₹50,000 | 600 ₹60,000 | 550 ₹55,000 | 500 ₹50,000 |
| 6.00 | Providing and applying white cement based wall putty of approved quality over concrete or Plastered surface up to 3mm thick to get uniform surface free fro undulation including cleaning complete all as directed by the Engineer-in-charge. | 450 | SqM | 70 ₹31,500 Lowest | 75 ₹33,750 | 70 ₹31,500 Lowest | 75 ₹33,750 | 80 ₹36,000 |
Tender Value
₹78.4 L
EMD Value
₹1.9 L
Closing Date
5 Jun 2026, 3:00 pmClosed
Chief Engineer
Civil Engineering Division, Bhabha Atomic Research Centre, Trombay, Mumbai-400085
Internal painting and repair work including allied works at various rooms, labs, workshops, etc. at Mod Labs and SCF buildings, BARC, Trombay, Mumbai-400085. (Year 2026-2027).
2026_BARC_906456_1
BARC/CED/ET/5/2026-2027 Dated 21/04/2026
Open Tender
Civil Works
Item Rate
540 days
Mod Labs and SCF buildings, BARC, Trombay, Mumbai-
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.9 L
CED, BARC, Trombay, Mumbai-400085
9 Sept 2026
28 Apr 2026
10 Jun 2026
28 Apr 2026
5 Jun 2026
15 May 2026
28 Apr 2026 - 5 May 2026
6 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling old ceiling plaster carefully and cleaning the surface for plaster including scaffolding, disposal of rubbish to the dumping ground within 100 m lead, cutting of 2nos. of 10 mm M.S. Rod per Sq.m. if required etc. complete including protecting the permanently fixed laboratory equipments, other equipments, fragile materials etc. while dismantling. After dismantling and disposing the rubbish, providing and applying white cement based wall putty over concrete or Plastered surface minimum 3 mm and up to 6 mm thick including cleaning complete all as directed by the Project Engineer. Notes: 1. Fan coil units, fixed equipments in lab etc. to be covered with tarpolene/plastic cover. 2. While dismantling plywood platforms should be fixed on the scaffolding to protect the underlying equipments. This item includes bringing dismantled debris/rubbish from all the floors to the dumping ground within 100 m lead. Dismantling of plastering should be done by chiselling and mechaical means without damaging the RCC. | |||||
| 1.1 | For ceiling height up to 4m above FFL | 225 | SqM | - | - |
| 1.2 | For ceiling height beyond 4 m and up to 7m above FFL | 50 | SqM | - | - |
| 1.3 | For ceiling height beyond 7 m and up to 10m above FFL | 110 | SqM | - | - |
| 2 | Providing and applying two coats of anti-carbonation paint of approved colour and shade of approved manufacturers on concrete surfaces including scafolding (ceilings, beams, columns etc.) | 2,214 | SqM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.57 MB
Tendernotice_2.pdf
PDF • 1.85 MB
TechnicalbidET5.xls
Tender Documents • 0.07 MB
ProformaofScheduleET5.pdf
Tender Documents • 0.30 MB
BOQ_952771.xls
BOQ • 0.30 MB
ScheduleAET5.pdf
Tender Documents • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .