Tender Value
Refer Docs
EMD Value
₹7.5 L
Closing Date
14 Jun 2024, 11:00 amClosed
PR & CC
NOTICE INVITING TENDERCompetitive Offers are invited from Indian bidders with sound technical and
2400013027-HD-07750
5100013027
Open Tender
Dharmapuri, Tamil Nadu
₹0
₹7.5 L
14 Jun 2024
30 May 2024
14 Jun 2024
14 Jun 2024
31 May 2024 - 7 Jun 2024
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | THIRD PARTY INSPECTION OF 1999-DHARAMAPURI | THIRD PARTY INSPECTION OF 1999-DHARAMAPURI — IA INSPECT: TO CARRY OUT THIRD PARTY INSPECTIONDURING THE TANKFABRICATION/MODIFICATIONS/MAINTENANCE WORKS ASPER THE SCOPE OF W K ENCLOSED. (LIST OF APPROVEDTPIA'S) COPIES OF ALL APPROVALS/CERTIFICATIONSFOR ABOVE TO BE SUBMITTED TO HPCL AS DIRECTED BYENG EER IN CHARGE. TPIA INSPECTION SHALL BE DONEAS PER HPCL APPROVED TPIA'S ONLY RATE SHALL BEQUOTED AS PER THE FOLLOWING DETAILS IN UDINGBOARDING, TRAVELLING AND ALL OVERHEADS ETCCOMPLETE. TPIA CHARGES FIELD INSPECTION VISIT PERDAY. | - | Man Day |
| 2 | SUP & FAB - DOME ROOF | SUP & FAB - DOME ROOF — PER DETAILED SCOPE OF JOB ATTACHED. | - | Lump Sum |
| 3 | INSTLN AND COMMNG OF | INSTLN AND COMMNG OF — ME ON FLOATING ROOF TANK: INSTALLATION, TESTINGAND COMMISSIONING OF ALUMINIUM DOMES ALONG WITHALL NECESSARY MODIFICATION JOBS AS ETAILED INTHE SCOPE OF TENDER DOCUMENT. | - | Lump Sum |
| 4 | DISMAN OF TANK SHELL | DISMAN OF TANK SHELL — SMANTLING OF EXISTING SHELL PLATES JOBINCLUDES: 1. PLATES TO BE CUT IN EQUAL SIZE ANDSHAPE FOR PROPER LIFTING. CARRYING OUT CUTT GOPERATION AFTER PROPER INSPECTION. 2. JOB ALSOINCLUDE CUTTING OF WELDED MANHOLE, CLEAN OUTDOOR, RECEIPT, DELIVERY, WATER DRAW FF, ROOFDRAIN, SPARE, ETC NOZZLES, STAIRWAY ON FIRSTSHELL, CURB ANGLE ON 4TH SHELL, SPRINKLER/FOAM PLSUPPORT AND ANY OTHER APP TENANCE. NECESSARYJACKING OF SHELL TO BE DONE DURING CUTTING OFPLATE. 3. ALL THE CUTTING OPERATION SHALL BECARRIED OUT BY GAS TTING. 4. NECESSARYPRECAUTION TO BE TAKEN WHILE GAS CUTTING NEARTANKS ARE AVAILABLE IN DYKE. 5. STACK THE PLATESAT DESIGNATED ACE IN THE FABRICATION YARD/SCRAPYARD/OTHER PLACE INSIDE TERMINAL IN PROPERSEQUENCE AND PROPER SUPPORTS. . MODE OFMEASUREMENT: AYMENT WILL BE MADE ON PHYSICALMEASUREMENT OF PLATES AFTER CUTTING OF SHELLPLATE AND CONSIDERING UNIT WEIGHT 7850 KG/M3.PLEASE EFER BOQ AND ATTACHED TECHNICAL SPECS FORDETAIL SPECIFICATION. | - | Metric ton |
| 5 | ANGLE,STRUCTURAL,STEEL | ANGLE,STRUCTURAL,STEEL — GLE; TYPE:STRUCTURAL; MATERIAL:STEEL; MATERIALSPEC:GRADE IS 2062; DIMENSION:N/A; ADDITIONALINFORMATION:FLAT,BEAM,CHANNEL,ANGLE,E .; THEAGENCY SHALL SUPPLY STRUCTURAL MATERIALS LIKEPLATES OF GRADE IS-2062, FLATS, BEAM, CHANNEL,ANGLES, ETC. WITH RELEVANT TE CERTIFICATE ANDTHROUGH VALID GATE ENTRY DOCUMENTS ON SPECIFICADVICE OF HPCL SUPERVISOR-IN-CHARGE. JOB SCOPEINCLUDES SUPPLY OF ARIOUS STRUCTURAL STEEL ITEMSOF SEVERAL SIZES, AS ADVISED BY HPCLENGINEER-IN- CHARGE. PROPER DOCUMENTATION ANDMATERIAL RECONCIL TION SHALL BE CARRIED OUT ANDSUBMITTED TO HPCL. PAYMENT SHALL BE DONE ONFABRICATED WEIGHT BASIS. | - | Metric ton |
| 6 | FAB & ERECT - STRL | FAB & ERECT - STRL — RUCTURAL STEEL-FABRICATING AND PAINTING:FABRICATING, WELDING, CUTTING AND ERECTINGSTRUCTURAL STEEL CONSISTING OF ANGLES, CHANNEL AND OTHER STRUCTURAL SECTIONS INCLUDING PLATESFOR SUPPORT AS PER THE DRAWINGS AND INSTRUCTIONSOF HPCL WITH APPROVED MATERIAL. J ALSO TOINCLUDE COPPER SLAG BLASTING OF STRUCTURAL STEELTHOROUGHLY TO S.A 2.5 OF SWEDISH STANDARD,APPLYING ONE COAT OF 100 MIC N OF HIGH BUILD MIOAND TWO COATS OF ACRYLIC POLYURETHANE AT 40MICRONS DFT/COAT OVER ONE COAT OF 65 MICRON DFTOF INORGANIC ZINC ILICATE PRIMER (THAT ISMINIMUM TOTAL DFT = 245 MICRON). PRICE TO BEQUOTED ON PER METRIC TON BASIS. THIS ITEMINCLUDES SUPPLY OF AINT. JOB SHALL BE COMPLETEAS PER THE INSTRUCTIONS OF HPCL. ALL CONSUMABLESREQUIRED IN THE FABRICATION SHALL BE INCLUDED INTHE UOTED RATE NO EXTRAS SHALL BE PAID FOR THESAME, THE COST TO INCLUDE NECESSARY CRANE ANDMATERIAL HANDLING EQUIPMENT FOR ERECTION. LLSHOP DRAWINGS SHALL BE PREPARED BY THE CONTRACTORAND GOT APPROVED BY HPCL ARCHITECT/ENGINEER. | - | Metric ton |
| 7 | HYDROTESTING OF TANK | HYDROTESTING OF TANK — DROTESTING OF TANK, TANK INSTALLATION:HYDROTESTING OF TANKS USING HPCL SUPPLIED WATER.REFER DETAILED DESCRIPTION OF LINE ITEM AS ERATTACHMENT. | - | Kilo Liter |
| 8 | CALIBRATION OF TANK | CALIBRATION OF TANK — LIBRATION OF TANKS. | - | Each |
| 9 | INSTLN OF FIRE SCREEN | INSTLN OF FIRE SCREEN — RE SCREEN: INSTALLATION OF FIRE SCREENINCLUDING FABRICATION OF SUPPORTING STRUCTURE ANDERECTION OF GALVANIZED IRON SHEET WITH AL REQUIRED FASTENER AND HARDWARE, ETC., ALLCOMPLETE AS PER SCOPE OF WORK AND INSTRUCTIONS OFHPCL ENGINEER-IN- CHARGE. AFTER COMPLE ON OF ALLHOT WORK, CONTRACTOR SHALL DISMANTLE THE FIRESCREEN AND THE SAME SHALL BECOME CONTRACTOR'SPROPERTY AND MAY BE TAKEN O OF SITE. THECONTRACTOR HAS TO MAINTAIN THE FIRE SCREEN FORTHE ENTIRE DURATION OF THE CONTRACT I.E. DURINGDISMANTLING AND CONS UCTION PERIOD AND CARRY OUTALL NECESSARY REPAIRS/SHEET REPLACEMENT, ETCREQUIRED FROM TIME TO TIME TO ENSURE SAFETY. FIRESCREEN O BE PROVED AROUND THE TANK PERIPHERY TOISOLATE THE NEAREST TANK. | - | square meter |
| 10 | MODIFICATION FOAM | MODIFICATION FOAM — DIFICATION OF FOAM POURER LINE OF PRODUCT ABOVEGROUND TANKS FOR TESTING OF FOAM POURER OUT SIDETHE TANK. 1. THE JOB IS INCLUDING EMOVAL OF 4INCH FOAM POURER PIPE AFTER THE FOAM MAKER FORMODIFICATION WORK 2. REFIXING THE MODIFY LINEWITH TEE, BALL VALVE AND LANGES FOR TESTINGPURPOSE OF FOAM SOLUTION OT SIDE THE DYKE. 3. ALLNECESSARY FIXTURES I.E FLANGES, GASKETS, STUDBOLTS,TEE ARE THE SCOPE OF VENDOR. | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2400013027-HD-07750.pdf
TENDER_DOCUMENT • 20.27 MB
Download all tender documents and submit your bid