| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 LAccepted-Finance | 1 | Accepted-Finance Accept | |
| 2 | Rejected-Technical | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | Jothi Prakash L1 | ARUNKUMAR TAMILVENDAN L2 |
|---|---|---|---|---|---|
| 1.00 | scrub jungle clearance with cost and conveyance including all other labuour charges etc complete | 528 | Sqm | 5.9 ₹3,115.2 Lowest | 6 ₹3,168 |
| 2.00 | Earth work in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment developed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill including extra earth filling, breaking clods, watering to OMC and compaction of each layer to 95% of proctor density through deployment of appropriate compaction equipment 8 - 10 tonne power roller - vibratary power roller short width (+/- 0.90m m widht durm) power roller or vibratory roller ensuring compaction of designed bund section and also ensuring compaction of earth fill and side slopes thorugh the deployment of hydraulic excavaters with steel plate fixtures attached to their booms / heavy power roller capable of climbing 1:5 (Horizontal) :1.00 (vertical ) slope including side slopes as directed by the eninner in charge of works and as per technical specification. | 6,625 | Cum | 57 ₹3,77,625 Lowest | 60 ₹3,97,500 |
| 3.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil etc complete. | 3.6 | Cum | 246 ₹885.6 Lowest | 255 ₹918 |
| 4.00 | Supplying and filling in foundation and basement with filling M. sand including water consolidating etc., | 0.6 | Cum | 1,493 ₹895.8 Lowest | 1,550 ₹930 |
| 5.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 0.6 | Cum | 5,057 ₹3,034.2 Lowest | 5,100 ₹3,060 |
| 6.00 | Centering with shuttering for all cc works using Ms sheet with cost and conveyance including all other labour charges etc complete | 6 | Sqm | 516 ₹3,096 Lowest | 520 ₹3,120 |
| 7.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 2.7 | Cum | 6,442 ₹17,393.4 Lowest | 6,500 ₹17,550 |
| 8.00 | Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush with cost and Conveyance of all labour charges etc | 2.76 | Cum | 5,476 ₹15,113.76 Lowest | 6,000 ₹16,560 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}12% | 1 | GST Amount | 75,808.61 ₹75,808.61 Lowest | 79,705.08 ₹79,705.08 |
Tender Value
₹5.1 L
EMD Value
₹5,100
Closing Date
16 Apr 2025, 3:00 pmClosed
BDO KTR (VP)
BDO KTR
Improvements, Desilting, Strengthening of bund and Construction of Steps to Gangaiyamman Koil Kulam in Ozhalur Panchayat at Kattankolathur Panchayat Union.
2025_RDTN_538514_1
3625/2025/B5 Date 04.04.2025
Open Tender
Civil Works
Item Rate
180 days
BDO KTR
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,100
Yes
7 Mar 2026
5 Apr 2025
16 Apr 2025
5 Apr 2025
16 Apr 2025
5 Apr 2025
Amount
scrub jungle clearance with cost and conveyance including all other labuour charges etc complete
Earth work in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment developed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill including extra earth filling, breaking clods, watering to OMC and compaction of each layer to 95% of proctor density through deployment of appropriate compaction equipment 8 - 10 tonne power roller - vibratary power roller short width (+/- 0.90m m widht durm) power roller or vibratory roller ensuring compaction of designed bund section and also ensuring compaction of earth fill and side slopes thorugh the deployment of hydraulic excavaters with steel plate fixtures attached to their booms / heavy power roller capable of climbing 1:5 (Horizontal) :1.00 (vertical ) slope including side slopes as directed by the eninner in charge of works and as per technical specification.
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil etc complete.
Supplying and filling in foundation and basement with filling M. sand including water consolidating etc.,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Centering with shuttering for all cc works using Ms sheet with cost and conveyance including all other labour charges etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush with cost and Conveyance of all labour charges etc
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}12%
ARUNKUMAR TAMILVENDAN (BID ID -1300313)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_641174.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .